Date |
Text |
2014-11-08 11:54:22 | ****CORRECTIONS**** |
| |
| SAMANTHA HILL |
| BUILDING PLANS EXAMINER |
| [email protected] |
| 561-805-6724 |
| |
| RE: STRUCTURAL CALCS |
| |
| 1. CALCS ARE OK, BUT A PHOTOCOPY WAS PROVIDED. |
| |
| ENGINEER MISUNDERSTOOD PREVIOUS LIST. I WAS NOT STATING |
| THAT THE INSTALLATION **IS** IN EXPOSURE D. I WAS |
| REQUESTING INFORMATION FOR THE ENGINEER OR CONTRACTOR |
| TO PROVIDE FOR THAT DETERMINATION TO BE CONFIRMED. THE |
| SITE PLAN DOES NOT SHOW DISTANCE TO PROPERTY LINES OR |
| TO CLEAR LAKE, OR PROPOSED LOCATION IN RELATION TO |
| CLEAR LAKE. THE PAGES FROM ASCE7-10 ARE NOT NECESSARY; |
| WE HAVE THEM IN OUR OFFICE. A PROPER SITE PLAN OR |
| AERIAL AS PREVIOUSLY REQUESTED WOULD SUFFICE. |
| |
| 2. CERTIFICATE OF AUTHORIZATION (ENGINEERING BUSINESS |
| LICENSE) IS REQUIRED FOR PRACTICING ENGINEERING THROUGH |
| AN ENGINEERING COMPANY, FS 471, FAC61G15-23. |
| |
| 2ND REVIEW, NOT ADDRESSED. A FOREIGN ENTITY |
| REGISTRATION WITH SUNBIZ.ORG WAS PROVIDED. THIS IS NOT |
| AN ENGINEERING LICENSE; THIS CAN ONLY BE OBTAINED |
| THROUGH FLORIDA BOARD OF PROFESSIONAL ENGINEERS/DBPR. |
| EITHER PROVIDE CERTIFICATE OF AUTHORIZATION NUMBER |
| (REQUIRED TO BE A PART OF THE TITLE BLOCK) OR SUBMIT |
| APPLICATION. CONTACT FBPE AT 850-521-0500 FOR MORE |
| INFORMATION. |
| |
| 3RD REVIEW, NOT ADDRESSED. THE FOREIGH ENTITY |
| REGISTRATION WAS INCORPORATED INTO THE SIGNED AND |
| SEALED PLAN WITH THE WORDS "FLORIDA C.O.A." IN FRONT OF |
| THE CORPORATE REGISTRATION NUMBER. THIS HAS BEEN |
| DISCUSSED AT LENGTH WITH THE ENGINEER'S OFFICE AND THEY |
| HAVE AGREED TO APPLY. PLEASE NOTIFY WHEN THIS |
| APPLICATION HAS BEEN PROCESSED, AND THE PERMIT WILL BE |
| ISSUED AFTER RECEIPT OF ORIGINAL SIGNED AND SEALED |
| ENGINEERING. |
| |
| 3. OK |
| |
| PLEASE FEEL FREE TO CONTACT ME IF YOU WISH TO DISCUSS |
| THESE COMMENTS. |
| |
| IF CONTRACTOR OR ENGINEER DO NOT WISH TO WAIT FOR THE |
| TWO ABOVE ISSUES TO BE RESOLVED, THE PERMIT WILL BE |
| ISSUED BUT THE TWO ISSUES (SUBMITTAL OF PHOTOCOPIES, |
| LACK OF C OF A) WILL BE REFERRED TO FBPE RATHER THAN |
| DELAYING THIS PERMIT. ***IT IS MY UNDERSTANDING THAT |
| THE ENGINEER HAS ALREADY OVERNIGHTED ORIGINAL PLANS TO |
| ME AND THE APPLICATION TO FBPE.*** |
| |
| |