2014-08-06 15:02:36 | RESIDENTIAL (R3) ALTERATION, SECOND BUILDING REVIEW |
| CHECKLIST. |
| CODE: 2010 FBC. |
| |
| 1- PROVIDE ENERGY CALCULATIONS. SEC. 101.4.3 AND SEC. |
| 103 OF 2010 FBC-ENERGY CONSERVATION. (REPEAT COMMENT. |
| NOT ADDRESSED). |
| (NOTE: THIS IS NOT A CONTRIBUTING HISTORIC HOUSE). |
| |
| 2- ENGINEER TO REVISE THE ROOF SHEATHING INFORMATION |
| GIVEN ON SHEET A-1: |
| A) NEED TO SPECIFY MIN. 8D RING SHANK NAILS WHICH ARE 2 |
| 1/2" LONG NOT 1 1/4". SEE SEC. R803.2.3.1 OF 2010 |
| FBC-RESIDENTIAL. |
| |
| B) ENGINEER TO CLARIFY WHY THE NAILING ZONES ARE PER |
| RAS 117?. WHERE IS THIS INFORMATION TAKEN FROM? ROOF |
| SHEATHING AND RAS 117 ARE TWO DIFFERENT THINGS. REVISE |
| AS REQUIRED. SEC. 107.2.1 CITY AMENDMENTS TO FBC. |
| |
| 3- ENGINEER TO REVISE EXTERIOR DOOR STRUCTURAL BUCK |
| DETAIL ON SHEET A-2. NEED TO COMPLY WITH SEC. |
| R612.10.2.1 OF 2010 FBC-RESIDENTIAL. NOTE: THE BUCKS |
| NEED TO PROVIDE FULL SUPPORT TO THE DOOR FRAMING. 2" X |
| 4" BUCK DOESN'T PROVIDE FULL SUPPORT TO THE DOOR FRAME. |
| SEE DOOR PRODUCT APPROVAL FOR DOOR FRAME SIZE AND |
| REVISE AS REQUIRED. |
| |
| 4- PROVIDE PRODUCT APPROVAL (2 COPIES) AS REQUIRED BY |
| DCA RULE 9N-3 FOR: |
| A) USP HC10 AND USP RT18T STRUCTURAL TRUSS CONNECTORS |
| SPECIFIED ON DETAILS ON SHEET A-1. ***NOTE: PROVIDE |
| ONLY THE PRODUCT APPROVAL COVER PAGE AND PAGE SHOWING |
| THE SPECIFIED CONNECTOR. (REPEAT COMMENT NOT |
| ADDRESSED). |
| |
| B) FIXED WINDOWS. NEED TO PROVIDE COMPLETE DRAWINGS. |
| DRAWINGS SUBMITTED WITH NOA 10-1015.02 ARE INCOMPLETE |
| AND CUT. NEED COMPLETE DRAWINGS. (REPEAT COMMENT. NOT |
| ADDRESSED). |
| |
| C) NEW COMMENT: SINGLE HUNG NOA 11-0404.09 AND EXTERIOR |
| DOOR NOA 09-0608.16 SUBMITTED NOW ARE FOR NON-IMPACT |
| WINDOWS AND DOORS. THEREFORE, NEED TO PROVIDE PRODUCT |
| APPROVAL (2 COPIES) FOR HURRICANE SHUTTERS AS REQUIRED |
| BY SEC. 606.4 OF 2010 FBC-EXISTING BUILDING. |
| |
| 5- ENGINEER OF RECORD TO REVIEW AND APPROVE IN WRITING |
| ABOVE PRODUCT APPROVALS AS REQUIRED BY SEC. 107.3.4.1 |
| OF CITY AMENDMENTS TO FBC. |
| |
| 6- PROVIDE COMPLETE INSTALLATION SCHEDULE FOR THE |
| INSTALLATION OF THE HURRICANE SHUTTERS. THERE IS A CITY |
| HURRICANE SHUTTERS INSTALLATION CHART THAT YOU CAN USE |
| OR YOU CAN PROVIDE A DIFFERENT FORMAT THAT PROVIDES ALL |
| THE INFORMATION REQUESTED IN THE CITY SAMPLE. SEC. |
| 107.2.1 CITY AMENDMENTS TO FBC. |
| |
| |
| ***NOTES: |
| *PLEASE PROVIDE RESPONSE LETTER ADDRESSING EACH COMMENT |
| TO EXPEDITE THE REVIEW PROCESS. |
| *PLEASE REPLACE ANY REVISE SHEET. |
| |
| IF YOU HAVE ANY QUESTIONS, PLEASE CALL |
| JULIO GOMEZ |
| COMMERCIAL COMBINATION PLANS EXAMINER |
| DEVELOPMENT SERVICES DEPARTMENT |
| (561)805-6712 |
| [email protected] |