Date |
Text |
2016-06-22 16:39:40 | 1-THE PROPOSED HOTEL IS REQUIRED TO PURCHASE A TOTAL OF |
| 32,509 SF OF TDR. THE TDR TRANSFER SHALL BE APPROVED BY |
| THE DAC BEFORE A BUILDING PERMIT CAN BE ISSUED. |
| 2- COMPLIED-THE CALCULATION FOR THE MEZZANINE AREA |
| SHALL BE DONE BASED ON THE GROSS AREA FOR THE GROUND |
| FLOOR AND THE MEZZANINE. AS PROPOSED MEZZANINE AREA |
| EXCEEDS THE MAXIMUM 50% OF THE GROUND LEVEL GROSS AREA, |
| AND IT SHALL BE REDUCED OR IT WILL COUNT AS A FLOOR. |
| 3- COMPLIED - PROPOSED LOADING AREA ALONG THE ALLEY |
| DOES NOT HAVE DIMENSIONS TO WORK AS A PARALELL LOADING |
| AREA. PARALELL SPACE SHALL BE AT LEAST THE MINIMUM 8 |
| FEET REQUIRED FOR PARALELL PARKING. LOADING IS NOT |
| REQUIRED FOR THIS PROJECT. AS THE PROPOSED SPACE ALONG |
| THE ALLEY DOES NOT MEET THE MINIMUM WITH FOR A PARALELL |
| PARKING, IT SHALL NOT BE IDENTIFIED AS LOADING OR |
| PARKING. |
| 4- PLEASE PROVIDE A SECTION TO CONFIRM- SIDEWALK |
| CROSSING THE DRIVEWAY SHALL BE MAINTAINED AT SIDEWALK |
| GRADE, AND SHALL BE THE SAME MATERIAL OF THE SIDEWALK. |
| 5- COMPLIED- CIVIL DRAWINGS AND SITE PLAN ARE NOT |
| CONSISTENT REGARDING THE PORTE COCHERE APRON AND DRIVE. |
| 6- PROPOSED PAVER TREATMENT ALONG DIXIE HWAY WILL |
| REQUIRE A MAINTENANCE AGREEMENT, WHERE THE HOTEL |
| BECOMES RESPONSIBLE FOR THE MAINTENANCE OF THE PAVERS. |
| 7- COMPLIED-PROPOSED STOP BAR SHALL BE MOVED AWAY FROM |
| THE SIDEWALK TRAVEL PATH AND INTO THE PORTE COCHERE |
| AREA. |
| 8- COMPLIED-THE PORTE COCHERE TRAFFIC FLOW SHALL FOLLOW |
| THE DIXIE HWAY DIRECTION OF TRAFFIC ( ENTRANCE ON NORTH |
| DRIVEWAY, AND EXIT ON SOUTH DRIVEWAY). |
| 9- COMPLIED- PROPOSED CATCH BASINS CANNOT GO IN THE |
| MIDDLE OF THE SIDEWALK. |
| 10- LANDSCAPE IN ROOFTOP TERRRACE NEED AUTOMATIC |
| IRRIGATION. THERE ARE PLANTER URNS LOCATED IN AREAS |
| DIFFICULT TO REACH FOR HAND WATERING. |
| 11- COMPLIED- SIDEWALK ALONG DIXIE HIWAY BETWEEN THE |
| TWO PORTE COCHERE DRIVEWAYS IS SHOWN HALF IN PARVER AND |
| HALF IN CONCRETE. WHAT IS THE REASON FOR THAT? |
| 12- COMPLIED - TREE GRATES SHALL BE INSTALLED ALONG |
| DIXIE HWAY FOLLOWING THE RHYTHM AND PATTERN OF THE ONES |
| ON THE WEST SIDE. |
| 13- COMPLIED- RESTAURANT DOOR ON CLEMATIS SHALL BE |
| RECESSED SO IT DOES NOT ENCROACH MORE THAN 12" INTO THE |
| SIDEWALK. |
| 14- PLEASE PROVIDE INFORMATION TO CONFIRM COMPLIANCE |
| WITH THE MINIMUM LANDSCAPE REQUIREMENTS FOR THE ROOFTOP |
| GARDEN ON TOP OF THE 2ND FLOOR (TABLE IV-7). PLEASE |
| CORRECT THE TITLES AS IT INDICATES A TERRACE ON THE |
| 17TH FLOOR. PLEASE BREAK OUT THE LIST OF TREES PROVIDED |
| TO COMPLY WITH CANOPY REQUIREMENT. |
| 15. GARBAGE COLLECTION OPERATION SHALL BE APPROVED BY |
| THE SANITATION DEPARTMENT. PLEASE CONTACT FERDINAND |
| RIVERA AT 561-822-2076. PROVIDE APPROVAL LETTER FROM |
| SANITATION. |
| 16. PLEASE LABEL ALL MECHANICAL ROOMS NOT COUNTED AS |
| PART OF THE FAR IN THE FLOOR PLANS, AND IDENTIFIED THE |
| TYPE OF MECHANICAL USE INTENDED FOR THE ROOM. |
| 17. PROPOSED BASE PLANTING INDICATED ON THE SIDEWALK |
| BETWEEN THE TWO CURB CUTS IS NOT PERMITTED. SPACE SHALL |
| BE MAINTAINED AS SIDEWALK. |
| 18. PLEASE SEPARATE THE LANDSCAPE DRAWINGS AND SUBMIT |
| FOR LANDSCAPE PERMIT. |
| 19. COMPLIED-NEW HALLWAY CONNECTING 3RD LEVEL ROOF TOP |
| ELEVATOR WITH PORCH HAS RESULTED IN ADDITIONAL BLANK |
| FACADE TOWARDS THE EAST. SPACE SHALL BE OPEN TO ALLOW |
| FOR ARCHITECTURAL ELEMENTS. ANY ENCLOSED AREA SHALL BE |
| COUNTED AS PART OF THE FAR. |
| 20. ACCORDING TO DAC FINAL ORDER NO. 12-01, THE PORCH |
| SHALL NOT EXPAND BEYOND DIMENSIONS PRESENTED TO THE |
| BOARD AT THE TIME OF THE HEARING. |
| 21. LANDSCAPING ALONG DIXIE HWAY SHALL MATCH THE |
| EXISTING ON THE WEST SIDE OF DIXIE HWAY. |
| FOR ADDITIONAL INFORMATION PLEASE CONTACT ANA MARIA |
| APONTE AT 561-822-1439. |
| |