Plan Review Notes
Plan Review Notes For Permit 14061217
Permit Number 14061217
Review Stop G
Sequence Number 3
Notes
Date Text
2016-04-10 08:44:36GAS REVIEW
  
 1) SUBMIT THE SPECIFICATIONS/INSTALL MANUALS FOR POWER
 VENTS FOR THE GAS WATER HEATERS.FBC 107.1.
 2) SHT. P 402 - SUBMIT AN EXPLANATION AS TO HOW THE
 CALCULATIONS FOR THE COMBUSTION AIR FOR THE GA WATER
 HEATERS WAS DONE.THERE IS A REFERENCE TO SEC. 706 OF
 THE FBC-MECHANICAL CODE. THIS CODE SECTION SPECIFICALLY
 STATES THAT THE CODE SECTION DOES NOT APPLY TO DIRECT
 VENT APPLIANCES. SEC. 304.1 OF THE FBC- FUEL GAS STATES
 THAT DIRECT VENT APPLIANCES SHALL BE PROVIDED WITH
 COMBUSTION, VENTILATION AND DILUTION AIR IN ACCORDANCE
 WITH THE APPLIANCE MANUFACTURER'S INSTRUCTIONS. SUBMIT
 A COPY OF THE INSTALL DOCUMENT FOR REVIEW.
 3) IDENTIFY THE GAS VENTS ON THE ROOF PLAN ( IF THAT'S
 WHERE THEY WILL TERMINATE).
 4) SUBMIT A DETAIL SHOWING THE TERMINATION POINT OF THE
 GAS VENTS, HEIGHT ABOVE ROOF, ETC.FGC SECS. 502 THRU
 505.
 5) SHT. P 301 - THE LENGTH OF THE GAS LINE IS SHOWN AS
 150 FT.AND ON SHT. P 310 IT IS SHOWN AS 81 FT. CLARIFY.
 6) SHT.P 310 - SEDIMENT TRAPS ARE REQUIRED ON THE WATER
 HEATER GAS PIPING TO EACH GAS HEATER. 2010 FGC
 SEC.408.4.
 7) SHT. P 310 SHOWS THE BTU LOAD OF THE GAS SYSTEM AS
 1,200,000 BTU'S AND SHT. P 402 , GAS WATER HEATER
 SCHEDULE SHOWS THE LOAD AS 500,000 BTU'S EACH. CLARIFY.
 8) SHT.P 310 - PROVIDE A DETAIL AS TO HOW THE GAS
 PIPING IS ENTERING THE STRUCTURE. THE PLANS ARE VAGUE.
 GAS PIPING SHALL NOT PENETRATE THE BUILDING FOUNDATION
 WALLS AT ANY POINT BELOW GRADE. SCHEDULE 40 METALLIC
 PIPE IS NOT PERMITTED BELOW GROUND UNLESS PROTECTED IN
 ACORDANCE WITH SECS.404.9 THROUGH 404.9.2.
  
 PLUMBING PLAN REVIEW
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 561-805-6692
 [email protected]
  