Date |
Text |
2015-05-20 13:10:55 | CHRISTOPHER COLE |
| MECHANICAL PLANS EXAMINER |
| 561-805-6719 |
| [email protected] |
| |
| |
| PERMIT #14061217 |
| MECHANICAL REVIEW. |
| |
| 1 ) COOLING & HEATING LOAD CALCULATIONS: THE SUBMITTAL |
| DOES NOT INCLUDE THE CALCULATIONS FOR THE HOTEL ROOMS, |
| AND MANY OF THE ROOMS AND SPACES SHOWN ON THE 1ST, |
| MEZZANINE, AND 2ND FLOOR PLANS SUCH AS THE GYM, TRASH |
| ROOM, SECURITY ROOM, LINEN ROOM, EMPLOYEE LOUNGE, |
| HOUSEKEEPING; AND THE VARIOUS OFFICES, STORAGE ROOMS |
| ETC. THROUGHOUT THE BUILDING, AND THE ROOMS AND SPACES |
| ON THE POOL DECK FLOOR. IN ADDITION, THE SQUARE |
| FOOTAGES LISTED ON THE DOCUMENTS DO NOT MATCH THE |
| SQUARE FOOTAGES LISTED ON THE PLAN (SEE LIFE SAFETY |
| SHEETS A1.00- A1.11.) FOR SQUARE FOOT TABLES. PLEASE |
| NOTE THAT THE NUMBERED ZONES ON THE CALCS DO NOT |
| CORRELATE TO THE PLANS WHICH DO NOT INDICATE ZONES. |
| PLEASE REVIEW AND REVISE. |
| 2) ENERGY CALCULATION FORM 405-2010: THE FORM IS |
| IDENTIFYING THE AC SYSTEMS AS "THROUGH THE WALL SINGLE |
| PACKAGE" HOWEVER THE MAJORITY OF THE UNITS ARE |
| MULTI-SPLIT SYSTEMS EXCEPT FOR THE TWO RTU?S. |
| ADDITIONALLY, I DO NOT SEE HOW THE SYSTEMS LISTED- 1, |
| 2, & 15 CORRELATE TO THE ACTUAL SYSTEMS SHOWN ON THE |
| HVAC PLAN SCHEDULES: PLEASE REVISE THE CALCULATIONS TO |
| MATCH THE SYSTEMS ON THE PLANS, AND PLACE THE |
| EFFICIENCY RATINGS OF THE SYSTEMS ON THE EQUIPMENT |
| SCHEDULES. |
| 3) SHEETS M101, M102, & M103: THE PLANS INDICATE THE |
| CORRIDORS BEING USED TO CONVEY RETURN AIR BACK TO THE |
| UNITS WHICH IS NOT PERMITTED PER SECTION 601.2 FMC-10. |
| PLEASE PROVIDE DUCTED RETURNS. |
| 4) M101: THERE ARE FIRE DAMPERS MISSING FOR DUCTS |
| PENETRATING THE COMMON WALLS BETWEEN THE WOMEN'S |
| RESTROOM/HR ROOMS, SECURITY/HR ROOM, AND THE |
| OFFICE/VALET ROOMS; AND DAMPERS MISSING OVER THE RATED |
| DOORS IN THE SERVICE CORRIDOR, AND OVER THE |
| LINEN/CORRIDOR DOOR. PLEASE NOTE THAT A FLEX DUCT IS |
| SHOWN PENETRATING THE OFFICE/VALET WALL- NOT PERMITTED |
| PER SECTION 603.6.5 FMC-10. |
| 5) M101: EXHAUST IS REQUIRED FOR THE TRASH ROOM IN |
| ACCORDANCE WITH TABLE 6-4 ASHRAE 62.1 04. REVISE THE |
| PLANS TO SHOW THE FAN, EXHAUST DUCT IF NEEDED, AND |
| TERMINATION LOCATION. INCLUDE THE REQUIRED FAN IN THE |
| EQUIPMENT SCHEDULES. |
| 6) M102: FIRE DAMPERS MISSING FOR DUCTS PENETRATING |
| COMMON WALLS BETWEEN THE MECH. RM/EMPLOYEE LOUNGE, |
| MECH. RM/LOCKER RM, LOCKER RM/STORAGE RM, AND THE O/A |
| DUCTS AT BOILER RM/SERVICE CORRIDOR AND SERVICE |
| CORRIDOR/MECH. RM. |
| 7) M102: A RETURN AIR ARROW SYMBOL IS SHOWN DIRECTING |
| AIR FROM THE SERVICE CORRIDOR THROUGH THE RATED DOUBLE |
| DOORS AT THE MECH. RM: HOW IS AIR RETURNING THROUGH |
| THESE RATED DOORS? |
| 8) M102: CLARIFY HOW THE EXHAUST SYSTEMS WERE SIZED FOR |
| THE GENERATOR AND FIRE PUMP ROOMS: PROVIDE CALCULATIONS |
| AND INDICATE THE SEQUENCE OF OPERATION FOR THE FANS. |
| 9) M102: CLARIFY HOW THE BOILER/PUMP ROOM WILL BE |
| VENTILATED. |
| 10 )M101 & M102: INDICATE SEQUENCE OF OPERATION FOR THE |
| O/A MOTORIZED DAMPERS FOR AC-1.1, AC-1.2, AND AC-1.3. |
| 11) M101 & M102: VERIFY REQUIRED 10' HORIZONTAL |
| CLEARANCES FOR THE AIR INTAKES TO STREETS, PARKING, |
| EXHAUST VENTS, ETC.- SECTION 401.4.1 FMC-10. |
| 12) M103: FLEX DUCTS ARE SHOWN IN MANY LOCATIONS OFF |
| THE SERVICE CORRIDOR PENETRATING RATED WALLS, AND AT |
| THE MECH. CLOSET FOR AC-2.1. FIRE DAMPERS ARE ALSO |
| MISSING FOR RETURNS GRILLS IN MANY LOCATIONS: PLEASE |
| CORRECT. |
| 13) M101- M108, M201: SHOW THE LOCATIONS OF AC PIPING |
| RUNS OR CHASES. PROVIDE ON THE PLANS THE TYPE OF |
| PIPING, TYPE AND THICKNESS OF PIPING INSULATION, AND |
| THROUGH PENETRATION FIRE STOPPING DETAILS. |
| 14) M101- M106, M201: PROVIDE FSD SYMBOLS AT THE |
| REQUIRED LOCATIONS- SEE SHEET 601. THE PLANS ARE |
| INDICATING ONLY FD'S. PLACE A "TYPICAL" NOTE INDICATING |
| REQUIRED ACCESS TO DAMPERS WILL BE PROVIDED- SECTION |
| 607.4 FMC-10. |
| 15) M104- M106: DAMPERS ARE NOT SHOWN FOR THE DUCTS |
| PENETRATING THE RATED SHAFTS FOR RTU-1 & 2: PLEASE |
| CORRECT. |
| 16) M107: SHOW LOCATIONS OF REQUIRED DAMPERS |
| PENETRATING THE RATED FLOOR/CEILING ASSEMBLY. |
| 17) M107: INDICATE THE EXHAUST DUCT RUNS AND |
| TERMINATION LOCATIONS FOR EF-6 & EF-7. |
| 18) M107: CLARIFY HOW THE POOL EQUIPMENT EXHAUST SYSTEM |
| WAS SIZED: SHOW METHOD AND CALCULATIONS AND INDICATE |
| SEQUENCE OF OPERATION |
| 19) M302 & 303: THE WIND LOAD TIE DOWN DETAILS SHOWN |
| FOR THE AC UNITS, CURBS, STANDS, AND FANS ETC. MUST BE |
| CERTIFIED BY A STRUCTURAL ENGINEER. PLEASE NOTE THAT |
| ALL INSTALLATIONS SHALL WITHSTAND 170 MPH WIND LOADS |
| AND ASSOCIATED UPLIFT AND LATERAL PRESSURES. PLEASE |
| UPDATE THE NOTE UNDER DETAIL 1/M303. |
| 20) M502: O/A CALCULATIONS DO NOT INCLUDE THE ROOMS AND |
| SPACES BEING SERVED BY A1.3 (MEZZANINE LOUNGE, |
| ENGINEER'S OFFICE ETC.), AC-2.1 (2ND FLOOR OFFICES, |
| HOUSEKEEPING ETC.), AC-2.2 (2ND FLOOR GYM), AND THE |
| FCU-1'S AND FCU-2'S (GUEST ROOMS). ADDITIONALLY PROVIDE |
| A CALCULATION FOR THE DIRTY LINENS ROOM PER TABLE 403.3 |
| FMC-10. |
| 21) M502: PROVIDE AIR BALANCE CALCULATIONS FOR FLOORS |
| 1-3. |
| 22) M602: PLEASE SEE SECTION 909 FBC-10 BUILDING FOR |
| REQUIRED SUBMITTALS AND DOCUMENTS FOR THE PROPOSED |
| SMOKE CONTROL SYSTEMS INCLUDING A RATIONAL ANALYSIS, |
| AND A NARRATIVE DETAILING SPECIAL INSPECTIONS AND |
| TESTING OF THE SYSTEM. |
| 23) PROVIDE A SUBMITTAL PACKAGE FOR THE PROJECT |
| INCLUDING MANUFACTURER'S SPECIFICATIONS FOR THE RTU'S |
| AND AC SYSTEMS AND ALL ASSOCIATED COMPONENTS FOR |
| INSTALLATION OF COMPLETE SYSTEMS, THE SPF 1-2 AND SR-1, |
| THE EXHAUST AND AIR INTAKE FANS, FIRE DAMPERS, FIRE AND |
| SMOKE DAMPERS, SMOKE DETECTORS, DUCT SMOKE DETECTORS, |
| MOTORIZED DAMPERS, CONTROLS, ETC. |
| THE PACKAGE SHALL CONTAIN ALL REQUIRED FL. PRODUCT |
| APPROVALS AND MIAMI-DADE NOA?S FOR EXTERIOR MOUNTED |
| COMPONENTS SUBJECT TO WIND PRESSURES |
| |
| |
| |