2015-07-14 15:27:31 | 1-THE PROPOSED HOTEL IS REQUIRED TO PURCHASE A TOTAL OF |
| 31,963 SF OF TDR. THE TDR TRANSFER SHALL BE APPROVED BY |
| THE DAC BEFORE A BUILDING PERMIT CAN BE ISSUED. |
| 2- THE CALCULATION FOR THE MEZZANINE AREA SHALL BE DONE |
| BASED ON THE GROSS AREA FOR THE GROUND FLOOR AND THE |
| MEZZANINE. AS PROPOSED MEZZANINE AREA EXCEEDS THE |
| MAXIMUM 50% OF THE GROUND LEVEL GROSS AREA, AND IT |
| SHALL BE REDUCED OR IT WILL COUNT AS A FLOOR. |
| 3- PROPOSED LOADING AREA ALONG THE ALLEY DOES NOT HAVE |
| DIMENSIONS TO WORK AS A PARALELL LOADING AREA. PARALELL |
| SPACE SHALL BE AT LEAST THE MINIMUM 8 FEET REQUIRED FOR |
| PARALELL PARKING. |
| 4- SIDEWALK CROSSING THE DRIVEWAY SHALL BE MAINTAINED |
| AT SIDEWALK GRADE, AND SHALL BE THE SAME MATERIAL OF |
| THE SIDEWALK. |
| 5- CIVIL DRAWINGS AND SITE PLAN ARE NOT CONSISTENT |
| REGARDING THE PORTE COCHERE APRON AND DRIVE. |
| 6- PROPOSED PAVER TREATMENT ALONG DIXIE HWAY WILL |
| REQUIRE A MAINTENANCE AGREEMENT, WHERE THE HOTEL |
| BECOMES RESPONSIBLE FOR THE MAINTENANCE OF THE PAVERS. |
| 7- PROPOSED STOP BAR SHALL BE MOVED AWAY FROM THE |
| SIDEWALK TRAVEL PATH AND INTO THE PORTE COCHERE AREA. |
| 8- THE PORTE COCHERE TRAFFIC FLOW SHALL FOLLOW THE |
| DIXIE HWAY DIRECTION OF TRAFFIC ( ENTRANCE ON NORTH |
| DRIVEWAY, AND EXIT ON SOUTH DRIVEWAY). |
| 9- PROPOSED CATCH BASINS CANNOT GO IN THE MIDDLE OF THE |
| SIDEWALK. |
| 10- LANDSCAPE IN ROOFTOP TERRRACES NEED AUTHOMATIC |
| IRRIGATION. THERE ARE PLANTER URNS LOCATED IN AREAS |
| DIFFICULT TO REACH FOR HAND WATERING. |
| 11- SIDEWALK ALONG DIXIE HIWAY BETWEEN THE TWO PORTE |
| COCHERE DRIVEWAYS IS SHOWN HALF IN PARVER AND HALF IN |
| CONCRETE. WHAT IS THE REASON FOR THAT? |
| 12- TREE GRATES SHALL BE INSTALLED ALONG DIXIE HWAY |
| FOLLOWING THE RHYTHM AND PATTERN OF THE ONES ON THE |
| WEST SIDE. PLEASE FOLLOW THE SAME PLANT MATERIALS ALSO. |
| 13- RESTAURANT DOOR ON CLEMATIS SHALL BE RECESSED SO IT |
| DOES NOT ENCROACH MORE THAN 12" INTO THE SIDEWALK. |
| 14- PLEASE PROVIDE INFORMATION TO CONFIRM COMPLIANCE |
| WITH THE MINIMUM LANDSCAPE REQUIREMENTS FOR THE ROOFTOP |
| GARDEN ON TOP OF THE 2ND FLOOR (TABLE IV-7). |
| 15. GARBAGE COLLECTION OPERATION SHALL BE APPROVED BY |
| THE SANITATION DEPARTMENT. PLEASE CONTACT FERDINAND |
| RIVERA AT 561-822-2076. PROVIDE APPROVAL LETTER FROM |
| SANITATION. |
| FOR ADDITIONAL INFORMATION PLEASE CONTACT ANA MARIA |
| APONTE AT 561-822-1439. |
2014-08-19 10:52:26 | 1-THE PROPOSED HOTEL IS REQUIRED TO PURCHASE A TOTAL OF |
| 31,963 SF OF TDR. THE TDR TRANSFER SHALL BE APPROVED BY |
| THE DAC BEFORE A BUILDING PERMIT CAN BE ISSUED. |
| 2- THE CALCULATION FOR THE MEZZANINE AREA SHALL BE DONE |
| BASED ON THE GROSS AREA FOR THE GROUND FLOOR AND THE |
| MEZZANINE. AS PROPOSED MEZZANINE AREA EXCEEDS THE |
| MAXIMUM 50% OF THE GROUND LEVEL GROSS AREA, AND IT |
| SHALL BE REDUCED OR IT WILL COUNT AS A FLOOR. |
| 3- PROPOSED LOADING AREA ALONG THE ALLEY DOES NOT HAVE |
| DIMENSIONS TO WORK AS A PARALELL LOADING AREA. PARALELL |
| SPACE SHALL BE AT LEAST THE MINIMUM 8 FEET REQUIRED FOR |
| PARALELL PARKING.IS THE PROPOSED AREA SUFFICIENT FOR A |
| HOTEL LOADING AREA? |
| 4- SIDEWALK CROSSING THE DRIVEWAY SHALL BE MAINTAINED |
| AT SIDEWALK GRADE, AND SHALL BE THE SAME MATERIAL OF |
| THE SIDEWALK. |
| 5- CIVIL DRAWINGS AND SITE PLAN ARE NOT CONSISTENT |
| REGARDING THE PORTE COCHERE APRON AND DRIVE. |
| 6- PROPOSED PAVER TREATMENT ALONG DIXIE HWAY WILL |
| REQUIRE A MAINTENANCE AGREEMENT, WHERE THE HOTEL |
| BECOMES RESPONSIBLE FOR THE MAINTENANCE OF THE PAVERS. |
| 7- PROPOSED STOP BAR SHALL BE MOVED AWAY FROM THE |
| SIDEWALK TRAVEL PATH AND INTO THE PORTE COCHERE AREA. |
| 8- THE PORTE COCHERE TRAFFIC FLOW SHALL FOLLOW THE |
| DIXIE HWAY DIRECTION OF TRAFFIC ( ENTRANCE ON NORTH |
| DRIVEWAY, AND EXIT ON SOUTH DRIVEWAY). |
| 9- PROPOSED CATCH BASINS CANNOT GO IN THE MIDDLE OF THE |
| SIDEWALK. |
| 10- LANDSCAPE IN ROOFTOP TERRRACES NEED AUTHOMATIC |
| IRRIGATION. THERE ARE PLANTER URNS LOCATED IN AREAS |
| DIFFICULT TO REACH FOR HAND WATERING. |
| 11- SIDEWALK ALONG DIXIE HIWAY BETWEEN THE TWO PORTE |
| COCHERE DRIVEWAYS IS SHOWN HALF IN PARVER AND HALF IN |
| CONCRETE. WHAT IS THE REASON FOR THAT? |
| 12- TREE GRATES SHALL BE INSTALLED ALONG DIXIE HWAY |
| FOLLOWING THE RHYTHM AND PATTERN OF THE ONES ON THE |
| WEST SIDE. PLEASE FOLLOW THE SAME PLANT MATERIALS ALSO. |
| 13- RESTAURANT DOOR ON CLEMATIS SHALL BE RECESSES SO IT |
| DOES NOT ENCROACH MORE THAN 12" INTO THE SIDEWALK. |
| 14- PLEASE PROVIDE INFORMATION TO CONFIRM COMPLIANCE |
| WITH THE MINIMUM LANDSCAPE REQUIREMENTS FOR THE ROOFTOP |
| GARDEN ON TOP OF THE 2ND FLOOR (TABLE IV-7). |
| 15. GARBAGE COLLECTION OPERATION SHALL BE APPROVED BY |
| THE SANITATION DEPARTMENT. PLEASE CONTACT FERDINAND |
| RIVERA AT 561-822-2076. |
| FOR ADDITIONAL INFORMATION PLEASE CONTACT ANA MARIA |
| APONTE AT 561-822-1439. |