2014-10-11 09:14:27 | PLAN REVIEW COMMENTS |
| |
| |
| 2ND REVIEW: FBC 2010 |
| ROBERT MCDOUGAL, CBO |
| COMMERCIAL COMBINATION PLANS EXAMINER |
| (561) 805-6714 |
| [email protected] |
| |
| MECHANICAL |
| |
| PLEASE ADDRESS THE ITEMS NOTED BELOW: |
| |
| 1) THE ORIGINAL SUBMITTAL DID NOT INDICATE THAT ANY |
| MECHANICAL WORK WAS TO BE DONE. THERE ARE HVAC LOAD |
| CALCULATIONS IN THIS SUBMITTAL AND THE NEW DRAWINGS |
| INDICATE THAT A NEW HVAC SYSTEM WILL BE INSTALLED. |
| PLEASE CLARIFY. FBC 107.2.1 |
| |
| 2) THE COOLING AND HEATING BTUH ON THE ENERGY |
| CALULATION FORM DOES NOT MATCH THE TOTAL HEATING AND |
| COOLING |
| 3) FBC-R - M1305.1.3 APPLIANCES IN ATTICS. |
| ATTICS CONTAINING APPLIANCES SHALL BE PROVIDED WITH AN |
| OPENING AND A CLEAR AND UNOBSTRUCTED PASSAGEWAY LARGE |
| ENOUGH TO ALLOW REMOVAL OF THE LARGEST APPLIANCE, BUT |
| NOT LESS THAN 30 INCHES (762 MM) HIGH AND 22 INCHES |
| (559 MM) WIDE AND NOT MORE THAN 6 FEET (1829 MM) LONG |
| MEASURED ALONG THE CENTERLINE OF THE PASSAGEWAY FROM |
| THE OPENING TO THE APPLIANCE. THE PASSAGEWAY SHALL HAVE |
| CONTINUOUS SOLID FLOORING IN ACCORDANCE WITH CHAPTER 5 |
| NOT LESS THAN 24 INCHES (610 MM) WIDE. A LEVEL SERVICE |
| SPACE AT LEAST 30 INCHES (762 MM) DEEP AND 30 INCHES |
| (762 MM) WIDE SHALL BE PRESENT ALONG ALL SIDES OF THE |
| APPLIANCE WHERE ACCESS IS REQUIRED. THE CLEAR ACCESS |
| OPENING DIMENSIONS SHALL BE A MINIMUM OF 20 INCHES BY |
| 30 INCHES (508 MM BY 762 MM), AND LARGE ENOUGH TO ALLOW |
| REMOVAL OF THE LARGEST APPLIANCE. |
| |
| 4) FBC-R - M1305.1.3.1 ELECTRICAL REQUIREMENTS. |
| A LUMINAIRE CONTROLLED BY A SWITCH LOCATED AT THE |
| REQUIRED PASSAGEWAY OPENING AND A RECEPTACLE OUTLET |
| SHALL BE INSTALLED AT OR NEAR THE APPLIANCE LOCATION IN |
| ACCORDANCE WITH CHAPTER 34. |
| |
| 5) FBC-R - M1305.1.3.2 AIR-HANDLING UNITS. |
| AIR-HANDLING UNITS SHALL BE ALLOWED IN ATTICS IF THE |
| FOLLOWING CONDITIONS ARE MET: |
| 1. THE SERVICE PANEL OF THE EQUIPMENT IS LOCATED WITHIN |
| 6 FEET (1829 MM) OF AN ATTIC ACCESS. |
| 2. A DEVICE IS INSTALLED TO ALERT THE OWNER OR SHUT THE |
| UNIT DOWN WHEN THE CONDENSATION DRAIN IS NOT WORKING |
| PROPERLY. |
| 3. THE ATTIC ACCESS OPENING IS OF SUFFICIENT SIZE TO |
| REPLACE THE AIR HANDLER. |
| 4. A NOTICE IS POSTED ON THE ELECTRIC SERVICE PANEL |
| INDICATING TO THE HOMEOWNER THAT THE AIR HANDLER IS |
| LOCATED IN THE ATTIC. SAID NOTICE SHALL BE IN ALL |
| CAPITALS, IN 16 POINT TYPE, WITH THE TITLE AND FIRST |
| PARAGRAPH IN BOLD: |
| |
| 6) FBC -107.3.5.1.4 MECHANICAL MINIMUM PLAN REVIEW |
| CRITERIA: SHOW, EXHAUST SYSTEMS, CLOTHES DRYER EXHAUST, |
| KITCHEN EQUIPMENT EXHAUST, SPECIALTY EXHAUST SYSTEMS, |
| EQUIPMENT, EQUIPMENT LOCATION, MAKE-UP AIR, |
| ROOF-MOUNTED EQUIPMENT, DUCT SYSTEMS, VENTILATION, |
| COMBUSTION AIR, CHIMNEYS, FIREPLACES AND VENTS, |
| APPLIANCES, BOILERS, REFRIGERATION, BATHROOM |
| VENTILATION, LABORATORY, DESIGN FLOOD ELEVATION. |
| |
| 7) FBC-R - M 1602.4 PROVIDE BALANCED AIR RETURN AT |
| BEDROOMS. |
| |
| 8) FBC 107.2.1 PROVIDE THE MODEL NUMBERS AND |
| SPECIFICATIONS OF THE HEATING AND COOLING EQUIPMENT IN |
| AN EQUIPMENT SCHEDULE ON THE MECHANICAL PLAN THAT |
| CORRESPONDS WITH THE EQUIPMENT SIZING CALCULATIONS. |
| |
| 9) FBC - 107.3.5.3 ? PROVIDE A MECHANICAL PLAN TO SHOW |
| SUPPLY DUCTS PER FBC-R M16 & BATH EXHAUST PER FBC-R |
| M15. |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |