Date |
Text |
2014-08-02 08:54:25 | 2010 FBC |
| |
| DENIED BY BUILDING |
| |
| 1) AN ELEVATION CERTIFICATE WILL BE REQUIRED PRIOR TO |
| FINAL INSPECTION SHOWING THAT THE NEW CONSTRUCTION AND |
| EQUIPMENT IS IN COMPLIANCE WITH THE REQUIRED BASE FLOOD |
| ELEVATION INCLUDING THE 6 IN FREE-BOARD. CITY |
| AMENDMENTS 107.2.1 |
| |
| 2) SUBMIT TWO SETS OF AN ACCURATELY COMPLETED |
| RESIDENTIAL BUILDING FORM 402 OR 405 SHOWING THAT THE |
| RENOVATION AND ADDITION COMPLY WITH THE 2010 FBC ENERGY |
| CONSERVATION. |
| |
| 3) THE PRODUCT APPROVALS ARE REQUIRED TO BE APPROVED IN |
| WRITING BY THE DESIGNER OF RECORD. CITY AMENDMENTS |
| 107.3.4.1 |
| |
| 4) SPECIFY WHICH ONE OF THE APPROVED ASSEMBLIES LISTED |
| IN THE CERTAINTEED BUR PRODUCT APPROVAL (NOA NO |
| 13-0204.14) WILL BE INSTALLED. SUBMIT TWO SETS OF |
| SIGNED AND SEALED RAS 117 CALCULATIONS FOR ENHANCED |
| FASTENING THAT IS REQUIRED FOR THE INCREASED PRESSURES |
| OF THE PERIMETER AND CORNER AREAS FOR A 170 MPH WIND |
| SPEED AND EXPOSURE 'D'. FBCR 301.1 |
| |
| 5) SHOP DRAWINGS FOR THE SPIRAL STAIRS THAT HAVE BEEN |
| REVIEWED AND ACCEPTED BY THE DESIGNER OF RECORD ARE |
| REQUIRED TO BE SUBMITTED FOR REVIEW PRIOR TO |
| INSTALLATION. FBCR 301.1 & CITY AMENDMENTS 107.2.1 |
| |
| 6) THE VALUE FOR THE SCOPE OF WORK APPEARS TO BE LOW. |
| PLEASE PROVIDE A COST BREAKDOWN OR A COPY OF A SIGNED |
| CONTRACT. CITY AMENDMENTS 109.3 |
| |
| 7) IN ORDER TO SPEED THE PLAN REVIEW TIMES, PLEASE |
| SUBMIT A RESPONSE LETTER THAT INDICATES HOW EACH OF THE |
| REVIEW COMMENTS HAS BEEN ADDRESSED. |
| |
| ROBERT MCDOUGAL |
| BLDG. PLAN REVIEW |
| (561)805-6714 |
| [email protected] |
| |
| |