2014-11-03 15:57:12 | PLAN REVIEW COMMENTS |
| |
| 3RD REVIEW: FBC 2010 |
| ROBERT MCDOUGAL, CBO |
| COMMERCIAL COMBINATION PLANS EXAMINER |
| (561) 805-6714 |
| [email protected] |
| |
| PLEASE ADDRESS THE ITEMS NOTED BELOW: |
| |
| BUILDING |
| |
| 1) THE ARCHITECT WHOSE NAME APPEARS IN THE TITLE BLOCK |
| ON SHEET A-1 IS REQUIRED TO SIGN, SEAL AND DATE THE |
| PLAN SHEET. CHAPTER 481, FLORIDA STATUTES & 61G1 |
| FLORIDA ADMINISTRATIVE CODE. |
| |
| 2) GIRDER TRUSS SF4GD IS SHOWN ON THE PLANS BEARING ON |
| THE EXTERIOR WALL ABOVE THE KITCHEN WINDOWS (RE: WINDOW |
| #10) ON SHEET A-1. THE TRUSS DRAWINGS SPECIFY A |
| REACTION OF 2607 #. PROVIDE A STRUCTURAL DETAIL OF THIS |
| WINDOW HEADER AND THE WALL FRAMING BELOW THE GIRDER AND |
| SUBMIT CALCULATIONS THAT SHOW HOW THE GRAVITY LOADS AND |
| REACTIONS FROM THE GIRDER TRUSS WILL BE SAFELY |
| TRANSFERED TO THE FOUNDATION. FBC-R 301.1 BUILDINGS AND |
| STRUCTURES, AND ALL PARTS THEREOF, SHALL BE CONSTRUCTED |
| TO SAFELY SUPPORT ALL LOADS, INCLUDING DEAD LOADS, LIVE |
| LOADS, ROOF LOADS, FLOOD LOADS, AND WIND LOADS AS |
| PRESCRIBED BY THIS CODE. THE CONSTRUCTION OF BUILDINGS |
| AND STRUCTURES IN ACCORDANCE WITH THE PROVISIONS OF |
| THIS CODE SHALL RESULT IN A SYSTEM THAT PROVIDES A |
| COMPLETE LOAD PATH THAT MEETS ALL REQUIREMENTS FOR THE |
| TRANSFER OF ALL LOADS FROM THEIR POINT OF ORIGIN |
| THROUGH THE LOAD-RESISTING ELEMENTS TO THE FOUNDATION. |
| SEE COMMENT #4 FROM THE PREVIOUS REVIEW. 4) THE TRUSS |
| PLANS SPECIFY A 24" WOOD GIRDER THAT HAS THREE POINT |
| BEARING. THE ARCHITECTURAL PLANS SHOW ONE END OF THIS |
| GIRDER BEARING ON AN EXTERIOR WALL ABOVE THE KITCHEN |
| WINDOWS. THE INTERMEDIATE BEARING POINT IS NOT |
| IDENTIFIED AND THE OTHER END APPEARS TO BE WHERE THE |
| TRUSS LAYOUT PLAN HAS THE MID-POINT BEARING. PROVIDE |
| STRUCTURAL DETAILS AND SECTIONS OF THE BEARING WALLS |
| THAT SUPPORT THIS GIRDER TRUSS. SHOW IN DETAIL HOW THE |
| LOADS WILL BE SAFELY SUPPORTED AND TRANSFERED FROM THE |
| ROOF TO THE FOUNDATION. FBC R301.1 |
| |
| 3) THE TRUSS LAYOUT AND DRAWINGS FROM THE DELEGATED |
| ENGINEER ARE REQUIRED TO BE REVIEWED AND APPROVED BY |
| THE DESIGNER OF RECORD. A SHOP DRAWING REVIEW STAMP |
| APPROVING THE TRUSS LAYOUT AND DESIGN FROM THE DESIGNER |
| OF RECORD IS REQUIRED ON THE TRUSS LAYOUT. FAC |
| 61G15-30.005 & 61G15-31.003 (#5 FROM PREVIOUS REVIEW). |