Date |
Text |
2014-05-27 13:52:59 | 1ST REVIEW: |
| |
| 1) SURVEY PROVIDED INDICATES FLOOD ZONE IS AN A-6; FIRM |
| MAP 120229 001 B INDICATES A5, AND DOES NOT ESTABLISH |
| THE PROPOSED FINISH FLOOR ELEVATION. |
| SEE 107.2.5.1 DESIGN FLOOD ELEVATIONS. WHERE DESIGN |
| FLOOD ELEVATIONS ARE NOT SPECIFIED, THEY |
| SHALL BE ESTABLISHED IN ACCORDANCE WITH SECTION |
| 1612.3.1. |
| 2) PROVIDE DETAILS FOR FLOOD RESISTANCE CONSTRUCTION |
| TECHNIQUES TO BE INCORPORATED IN THE STEM WALL AT THE |
| CRAWL SPACE AREA. |
| SEE 1612.5 FLOOD HAZARD DOCUMENTATION. |
| THE FOLLOWING DOCUMENTATION SHALL BE PREPARED AND |
| SEALED BY A REGISTERED DESIGN PROFESSIONAL AND SHALL BE |
| SUBMITTED TO THE BUILDING OFFICIAL: |
| 1. FOR CONSTRUCTION IN FLOOD HAZARD AREAS NOT SUBJECT |
| TO HIGH-VELOCITY WAVE ACTION: |
| 1.1 THE ELEVATION OF THE LOWEST FLOOR, INCLUDING |
| BASEMENT, AS REQUIRED BY THE FOUNDATION INSPECTION AND |
| THE FINAL INSPECTION IN SECTION 110.3. |
| 1.2. FOR FULLY ENCLOSED AREAS BELOW THE DESIGN FLOOD |
| ELEVATION WHERE PROVISIONS TO ALLOW FOR THE AUTOMATIC |
| ENTRY AND EXIT OF FLOODWATERS DO NOT MEET THE MINIMUM |
| REQUIREMENTS IN SECTION 2.6.2.1, ASCE 24, CONSTRUCTION |
| DOCUMENTS SHALL INCLUDE A STATEMENT THAT THE DESIGN |
| WILL PROVIDE FOR EQUALIZATION OF HYDROSTATIC FLOOD |
| FORCES IN ACCORDANCE WITH SECTION 2.6.2.2 OF ASCE 24. |
| 1.3. FOR DRY FLOODPROOFED NONRESIDENTIAL BUILDINGS, |
| CONSTRUCTION DOCUMENTS SHALL INCLUDE A STATEMENT THAT |
| THE DRY FLOODPROOFING IS DESIGNED IN ACCORDANCE WITH |
| ASCE 24. |
| |
| 3) FBC 107.3.4 - PROVIDE PRODUCT APPROVALS FOR THOSE |
| PRODUCTS WHICH ARE REGULATED BY |
| DCA RULE 9N-3 REVIEWED AND APPROVED IN WRITING BY THE |
| DESIGNER OF RECORD. SPECIFICALLY, PROVIDE ROOFING, |
| WINDOW, AND DOOR SUBMITTALS |
| |
| STEVEN KENNEDY, CBO |
| CHIEF PLANS EXAMINER |
| (561) 805-6710 |
| [email protected] |
| |
| |