2014-05-19 13:08:37 | RE-ROOF SECOND BUILDING REVIEW CHECKLIST. |
| CODE; 2010 FBC. |
| |
| ***INFORMATION SUBMITTED TODAY IS THE SAME INFORMATION |
| THAT WAS DENIED THE FIRST TIME. NEED TO ADDRESS THE |
| COMMENTS FROM THE FIRST CHECKLIST. |
| |
| |
| FLAT ROOF: |
| |
| 1- SELECTED ASSEMBLY ON PAGE 27 OF NOA 13-0204.03 |
| SUBMITTED CAN'T BE USED. THIS ASSEMBLY IS LIMITED BY |
| GENERAL LIMITATION #9. THIS LIMITATION DOESN'T ALLOW |
| FOR NAIL ENHANCING TO COMPLY WITH THE DESIGN PRESSURES |
| OF SEC. 1609 FBC. NEED TO SELECT ANOTHER APPROVED |
| ASSEMBLY. |
| |
| 2- ARCHITECT TO REVISE THE RAS 117 CALCULATIONS |
| SUBMITTED. IF THE SELECTED ASSEMBLY DOESN'T MEET THE |
| DESIGN PRESSURES CALCULATED FOR THE ROOF ZONE #1, THEN |
| THE SELECTED ASSEMBLY CAN'T BE USED. SELECTED ASSEMBLY |
| IS FOR -45PSF. THE CALCULATED DESIGN PRESSURES FOR ZONE |
| 1 ARE 52.5PSF. REVISE AS REQUIRED. SEE SECTION 8.1 OF |
| RAS 117 OF 2010 FBC-TEST PROTOCOLS HVHZ. |
| |
| 3- ARCHITECT TO COORDINATE BASE SHEET FASTENING SPECS |
| FOR ROOF ZONE #1 WITH THE FASTENING SPECS SHOWN ON THE |
| SELECTED ASSEMBLY. IF THE BASE SHEET FASTENING SPECS |
| DON'T MATCH THE FASTENING SPECS SHOWN ON THE PRODUCT |
| APPROVAL SUBMITTED, THEN THE RAS 117 CALCULATIONS WON'T |
| BE CORRECT. REVISE AS REQUIRED AND COORDINATE WITH ITEM |
| # 2 ABOVE. SEC. 107.2.1 CITY AMENDMENTS TO FBC. |
| |
| IF YOU HAVE ANY QUESTIONS, PLEASE CALL |
| JULIO GOMEZ |
| COMMERCIAL COMBINATION PLANS EXAMINER |
| (561)805-6712 |