2014-12-17 15:50:13 | 12/17/2014 |
| PROJECT: 525 CLEMATIS |
| PERMIT#: 14030818 |
| CODE: 2008 EDITION OF THE NEC, 2010 EDITION OF THE FBC |
| ,2010 WPB AMENDMENTS TO THE FBC, CHAPTER 1, |
| ADMINISTRATION, 2012 FBC SUPPLEMENTS. |
| 3RD ELECTRICAL PLAN REVIEW |
| ACTION: APPROVED WITH EXCEPTION. |
| |
| 1) ATOMIC TIMER IS NOT APPROVED FOR LIGHTING CONTROL AS |
| DEFINED IN THE FBC 505.2 REVISE PLANS AND INSTALLATION |
| FOR AN APPROVED LIGHTING CONTROL METHOD |
| |
| 2) EVERY CIRCUIT AND CIRCUIT MODIFICATION SHALL BE |
| LEGIBLY IDENTIFIED AS TO ITS CLEAR, EVIDENT, AND |
| SPECIFIC PURPOSE OR USE. NEC 408.4. REVISE PANEL |
| SCHEDULE TO COMPLY. |
| |
| 3) PROVIDE A COMPREHENSIVE AS BUILT REVISION FOR |
| ELECTRICAL LOAD SUMMARY CALCULATION BASED ON NEC |
| ARTICLE 220, |
| |
| 4) REVISE THE ELECTRICAL SERVICE RISER DIAGRAM WITH |
| SIZES OF ALL CONDUIT AND WIRE, |
| |
| WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| RE-SUBMITTAL FORM. SEE LINK: |
| HTTP://WPB.ORG/DEVELOPMENT/WP-CONTENT/UPLOADS/SITES/33/ |
| 2013/09/APPLICATION_RESUBMITTAL_FORM_04132010.PDF |
| |
| ADDITIONALLY, IT IS REQUIRED TO INSERT THE CORRECTED |
| PAGES INTO THE DENIED SUBMITTAL PACKAGE. VOID THE |
| PREVIOUSLY REVIEWED SHEETS AND LEAVE FOR COMPARATIVE |
| REVIEW. |
| |
| DAVID HAYES, ELECTRICAL PLANS EXAMINER, PX3421, |
| 561-805-6717 OR [email protected] |
| |