Plan Review Notes For Permit 14030587 |
Permit Number |
14030587 |
|
Review Stop |
B |
Sequence Number |
2 |
|
Notes |
Date |
Text |
2014-04-09 12:14:54 | ****CORRECTIONS**** | | | | SAMANTHA HILL | | BUILDING PLANS EXAMINER | | [email protected] | | 561-805-6724 | | | | 1. SEE OPENING 3 AND SHEET 12 OF THE PRODUCT APPROVAL. | | A SPAN OF 75" = 6.25', SO THE COLUMN 6' AND UNDER | | CANNOT BE USED. 7.5" ANCHOR SPACING REQUIRED. PLEASE | | CHECK ALL AS THIS APPLIES TO SEVERAL OPENINGS. | | | | 2. SEE OPENING 5 AND SHEET 12 OF THE PRODUCT APPROVAL. | | A SPAN OF 108" = 9' SO THE COLUMN "SPANS UP TO 12'" | | SHOULD BE USED. 6" ANCHOR SPACING DOES NOT COMPLY WITH | | THE CONDITIONS STATED ON INSTALLATION SCHEDULE (62PSF, | | C2 CONNECTION TYPE, 108" SPAN, BLOCK BOTTOM SUBSTRATE), | | POWERS TAPPER FASTENER. | | | | 3. PLEASE CHECK ALL AS THERE MAY BE SIMILAR ERRORS. AS | | ALWAYS, IF COMMENTS ARE NOT CLEAR OR YOU FEEL THAT I'VE | | MADE AN ERROR, PLEASE SCHEDULE AN APPOINTMENT WITH | | EITHER ME OR STEVE KENNEY, 561-805-6710. THE | | INSTALLATION SCHEDULE AND PRODUCT APPROVAL HAVE BEEN | | HIGHLIGHTED FOR OTHERS TO ASSIST YOU IN MY ABSENCE. | | | | 4. AS ADVISED PREVIOUSLY, DESIGN PRESSURES WERE REDUCED | | WITH THE ADOPTION OF FBC 2010. AS OFFERED PREVIOUSLY, | | PLEASE ADVISE IF YOU WISH TO HAVE ASSISTANCE REGARDING | | THE NEW DESIGN PRESSURES IN RELATION TO THE | | INSTALLATION SCHEDULE. | | | | | | | | | | | | | | | | . |
|