Date |
Text |
2014-08-21 10:56:50 | RESIDENTIAL (R3) REVISION FIFTH CHECKLIST: |
| CODE: 2010 FBC. |
| |
| 1- PROVIDE PRODUCT APPROVAL (2 COPIES) AS REQUIRED BY |
| DCA RULE 9N-3 FOR THE "NEW DOOR TYPE A STEEL DOOR". NO |
| PRODUCT APPROVAL WAS SUBMITTED THIS TIME. |
| |
| |
| ***** PREVIOUS COMMENTS REGARDING SITE SPECIFIC DOOR |
| PRODUCT APPROVAL: |
| |
| 1- PRODUCT APPROVAL INFORMATION SUBMITTED FOR CUSTOM |
| DOOR "A" NEED THE FOLLOWING INFORMATION FOR ROBERT |
| BROWN (BUILDING OFFICIAL) APPROVAL (PRODUCT APPROVAL |
| REQUIRED BY DCA RULE 9N-3): |
| A) WHERE WAS EXISTING DOOR TAKEN FROM?. PLANS DON'T |
| SHOW ANY DOOR TO BE REMOVED. |
| B) SIGNED AND SEALED COMPLETE ENGINEER DOOR COMPARATIVE |
| ANALYSIS. |
| C) ENGINEER TO REVISE THE DESIGN LOAD PER PERMITTED |
| DRAWINGS. -29.3 PSF DESIGN LOAD DOESN'T MATCH APPROVED |
| DRAWINGS. |
| D) ENGINEER TO PROVIDE COMPLETE INFORMATION FOR THE |
| HISTORIC DOOR. WOOD TYPE, THICKNESS, GLASS: TYPE, |
| THICKNESS, SIZES, ETC. |
| E) ENGINEER TO PROVIDE COMPLETE HISTORIC DOOR JAMB |
| SPECIFICATIONS AND ATTACHMENT TO THE STRUCTURE. |
| F) ENGINEER TO PROVIDE COMPLETE DOOR OPENING FRAMING |
| DETAILS AND SPECIFICATIONS. |
| |
| ***NOTE: ENGINEER TO CONTACT ROBERT BROWN (BUILDING |
| OFFICIAL) TO COORDINATE PRODUCT APPROVAL REQUIRED |
| INFORMATION. CALL (561)805-6652 OR E-MAIL |
| [email protected]. |
| |
| |
| 2- ENGINEER OF RECORD TO REVIEW AND APPROVE IN WRITING |
| ABOVE PRODUCT APPROVALS. SEC. 107.3.4.1 CITY AMENDMENTS |
| TO FBC. (REPEAT COMMENT). |
| |
| |
| ***NOTE: PLEASE PROVIDE A RESPONSE LETTER ADDRESSING |
| EACH COMMENT TO EXPEDITE THE REVIEW PROCESS. |
| |
| IF YOU HAVE ANY QUESTIONS, PLEASE CALL |
| JULIO GOMEZ |
| COMMERCIAL COMBINATION PLANS EXAMINER |
| DEVELOPMENT SERVICES DEPARTMENT |
| (561)805-6712 |
| [email protected] |