Plan Review Notes
Plan Review Notes For Permit 14020863
Permit Number 14020863
Review Stop E
Sequence Number 2
Notes
Date Text
2014-04-09 12:43:10TODAY I MADE A SECOND ATTEMPT TO REACH DUANE MILLAR.
 LEFT VM AND ALSO TRIED DIALING 0. GOT VOICE MAIL AS
 WELL. RETURNED PLANS TO BIN WHILE WAITING FOR RESPONSE.
2014-04-08 19:03:25ERRORS AND DISCREPANCIES WERE NOTED ON THE RISER
 DIAGRAM AND PANEL SCHEDULES. I CALLED DUANE AND LEFT A
 MESSAGE FOR A CALL BACK.
  
 COMMENTS 1 & 2 PROPERLY ADDRESSED MY PRIOR CONCERNS,
 BUT THERE IS AN ISSUE WITH #3.
 1. THE RISER DIAGRAM DOES NOT REFLECT ANY NEW WORK AS
 IDENTIFIED BY THE LEGEND, YET THIS EQUIPMENT IS BEING
 RELOCATED. PREVIOUSLY I ASKED FOR CONDUCTOR SIZING AND
 IT WAS NOT PROVIDED. ACCORDING TO THE RISER DIAGRAM
 PANEL "HB" IS FED FROM A 400 AMP DISCONNECT. OUT OF
 PANEL "HB" VIA A 175 AMP OCPD IS FED A 112 KVA
 TRANSFORMER SERVING PANEL "LBA" W/A 400 AMP MAIN
 BREAKER AND A CONNECTED LOAD OF ONLY 70 AMP.
  
 WHAT ARE THE CONDUCTOR SIZES FOR THESE FEEDERS?
  
 2. THE PANEL SCHEDULE FOR "HB" DOES NOT REFLECT THE
 OVER CURRENT DEVICE FOR THE TRANSFORMER AS INDICATED.


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved