Date |
Text |
2014-05-29 11:10:58 | 2010 FBC |
| |
| DENIED BY BUILDING |
| |
| 1) THE STRUCTURE IS LOCATED IN AN A5 FLOOD ZONE WITH A |
| REQUIRED BASE FLOOD ELEVATION OF 7' NGVD. THE ELEVATION |
| FOR THE FINISH FLOOR OF THE GARAGE IS SPECIFIED ON THE |
| PLANS AS 5.74', WHICH DOES NOT COMPLY WITH THE CITY'S |
| FLOOD ORDINANCE (6" ABOVE BFE). BECAUSE THE ADDITION OF |
| A SECOND FLOOR TO THE GARAGE IS A SUBSTANTIAL |
| IMPROVEMENT THE EXISTING GARAGE IS REQUIRED TO COMPLY |
| WITH THE FLOOD ORDINANCE. THE FINISH FLOOR OF THE |
| GARAGE CAN BE RAISED TO 7.5' NGVD. IF THE GARAGE IS |
| USED SOLELY FOR THE PARKING OF VECHICLES, THE FINISHED |
| FLOOR CAN BE BELOW THE BFE AND ENGINEERED FLOOD VENTS |
| OR FLOOD OPENINGS CAN BE INSTALLED IN THE WALLS OF THE |
| GARAGE ( SEE FEMA TECHINICAL BULLETIN 1 / AUGUST 2008 ) |
| OR SOME OTHER APPROVED METHOD MAY BE USED. |
| |
| 2) THE ENERGY CALCULATION FORM IS REQUIRED TO BE SIGNED |
| AND DATED BY THE OWNER/AGENT. |
| |
| 3) THE ENERGY CALCULATION FORM LISTS THE INSULATION FOR |
| THE FLOOR OVER THE GARAGE AS R-21.0 AND THE SECTIONS ON |
| SHEET A-6 SPECIFY R-11 BATT INSULATION. PLEASE CORRECT. |
| |
| 4) SUBMIT TWO COPIES OF THE PRODUCT APPROVALS FOR THE |
| ROOFING MATERIALS THAT WILL BE USED AS REQUIRED BY DCA |
| RULE 9N-3. |
| |
| 5) THE VALUE OF $23,000.00 SPECIFIED ON THE PERMIT |
| APPLICATION IS TOO LOW FOR THE SCOPE OF WORK SHOWN ON |
| THE PLANS. CITY AMENDMENTS 109.3 |
| |
| ROBERT MCDOUGAL |
| BLDG. PLAN REVIEW |
| (561)805-6714 |
| [email protected] |