2013-12-13 08:39:37 | |
| ** FAILED ** |
| |
| PLEASE ADDRESS THE FOLLOWING COMMENTS. RESPOND TO THE |
| COMMENTS IN WRITING AND/OR ON THE PLANS WHERE |
| APPLICABLE: |
| |
| 1.) CLARIFICATION ON THE LOCATION OF THE TEMPORARY |
| CONSTRUCTION FENCE IS REQUIRED. THE APPLICATION STATES |
| THAT THE FENCE WILL BE LOCATED AT THE PROPERTY |
| BOUNDARY. HOWEVER, THE PLANS INDICATE THAT TEMPORARY |
| CONSTRUCTION FENCES WILL BE BASED ON PHASES. PLEASE |
| CLARIFY. |
| |
| 2.) IF THE TEMPORARY CONSTRUCTION FENCE IS LOCATED AT |
| THE PROPERTY BOUNDARY, THEN IT MUST BE ENCLOSED. THE |
| SOUTHWEST PROPERTY LINE SEEMS TO BE OPEN. |
| |
| 3.) SCREENING DETAILS WERE NOT INCLUDED IN THE |
| SUBMITTAL. SCREENING DETAILS SHALL BE SUBMITTED. WIND |
| SCREENING SHALL BE SUBSTANTIAL ENOUGH TO AVOID |
| RIPS/TEARS DUE TO WIND OR SUN, AND SHALL HAVE NO LESS |
| THAN 85 PERCENT OPACITY. (ZLDR S.94-450(E)(2) 5.) |
| |
| 4.) HAS A STORMWATER POLLUTION PREVENTION PLAN (SWPPP) |
| BEEN SUBMITTED AND APPROVED BY THE CITY? IF SO, PLEASE |
| PROVIDE DOCUMENTATION THAT IT HAS BEEN APPROVED. |
| |
| 5.) EROSION CONTROL MEASURES ARE REQUIRED. A SWPPP, IN |
| COMPLIANCE WITH THE CITY'S STORMWATER MANAGEMENT |
| PROGRAM, SHALL BE SUBMITTED AND APPROVED BY THE CITY |
| PRIOR TO THE COMMENCEMENT OF LAND DEVELOPMENT |
| ACTIVITIES. (ZLDR S.94-450(E)(3)) |
| |
| 6.) CONTRACTORS APPLYING FOR A BUILDING PERMIT TO |
| PERFORM LAND DEVELOPMENT ACTIVITIES SHALL POST AN |
| EROSION CONTROL BOND OR DEPOSIT FOR THE EROSION CONTROL |
| MEASURES APPROVED BY THE SWPPP. (ZLDR S.94-450(F)) |
| |
| PLEASE NOTE THAT ANY REVISIONS MAY RESULT IN ADDITIONAL |
| COMMENTS. CONTACT LINDA LOUIE @ (561) 822-1442 IF YOU |
| HAVE QUESTIONS. |
| |