Date |
Text |
2014-01-31 16:07:06 | 2010 FBC |
| |
| DENIED BY BUILDING |
| |
| 1) SUBMIT TWO SETS OF ENERGY CALCULATIONS FOR THE |
| PROPOSED ADDITION AND AREA BEING CONVERTED TO HABITABLE |
| SPACE AS REQUIRED BY THE 2010 FBC ENERGY CONSERVATION. |
| THE ENERGY FORMS ARE REQUIRED TO BE SIGNED BY THE |
| PREPARER AND THE OWNER/AGENT. |
| |
| ROBERT MCDOUGAL |
| BLDG. PLAN REVIEW |
| (561)805-6714 |
| [email protected] |
| |
| |
| NOTE: |
| THE STRUCTURE IS LOCATED IN A SPECIAL FLOOD HAZARD |
| AREA, DESIGNATED FLOOD ZONE A5. THE MINIMUM ELEVATION |
| IS 7 FEET BFE PLUS THE ADDITIONAL 6" OF FREEBOARD |
| REQUIRED BY CITY ORDINANCE. BASED ON CITY BUILDING |
| DEPARTMENT RECORDS THE CUMULATIVE TOTAL COSTS OF WORK |
| ON THIS BUILDING INCLUDING $32,000.00 FOR THE PROPOSED |
| WORK IS $ 105,889.00. THE CONTRACTOR SUBMITTED AN |
| APPRAISAL FROM CHARLEEN MCMANUS, SRA, OF ANDERSON & |
| CARR, INC. STATING THE MARKET VALUE OF THE BUILDING |
| IMPROVEMENTS TO BE $ 320,000.00. BECAUSE THE TOTAL OF |
| PREVIOUS IMPROVEMENTS AND THE PROPOSED WORK IS LESS |
| THAN 50 PERCENT OF THE MARKET VALUE, THIS IS NOT |
| CONSIDERED A SUBSTANTIAL IMPROVEMENT. ACCORDING TO THE |
| PROPERTY APPRAISER'S RECORDS THE STRUCTURE WAS BUILT IN |
| 1935 AND HAS HAD NO SUBSTANTIAL IMPROVEMENTS PRIOR TO |
| THE DATE OF THE INITIAL FIRM (MARCH 1, 1979) . |
| THEREFORE THIS IS BUILDING IS CONSIDERED TO BE |
| PRE-FIRM. BASED ON TABLE 6-1A IN FEMA PUBLICATION P-758 |
| NEITHER THE LATERAL ADDITION NOR THE REMODEL IS |
| REQUIRED TO COMPLY WITH NFIP REQUIREMENTS FOR NEW |
| CONSTRUCTION. |