Date |
Text |
2013-10-11 16:16:08 | REVIEWED BY WDS. |
| |
| 1) SHEET E-0 AND E-1 STATES THE PROJECT WAS DESIGNED TO |
| THE NEC 2011. REVISE TO COMPLY WITH THE CORRECT EDITION |
| OF THE CODE. |
| 2) SHEET E-1, PANELBOARD "P" SHOWS CIRCUIT P-23 BEING |
| USED ON ELECTRICAL FLOOR PLANS. HOWEVER, ON SHEET E-2 |
| PANELBOARD SCHEDULE CIRCUIT P-23 STATES IT IS A |
| "SPARE". |
| 3) ON PANELBOARD "P" SCHEDULE SHOW CIRCUITS P-28,30,32 |
| AND P-27,29,31 HAS WATER HEATERS THAT ARE NOT SHOWN ON |
| SHEET E-1. HOWEVER, ON SHEET P-1 THE TWO WATER HEATERS |
| "A" ARE LOCATED IN THE ELECTORAL ROOM AND THE JANITOR |
| CLOSET, PROVIDE THE PROPER CLEARANCE IN FRONT OF THE |
| WATER HEATERS. NEC 110.26(A)(1). |
| 4) PROVIDE DESIGNATION OF ALL RECEPTACLE AND LIGHTING |
| CIRCUITS. |
| 5) DESIGNATE ALL FIXTURES THAT WILL BE ON THE LIGHTING |
| CONTROL PANEL AND CIRCUITS. |
| 6) PROVIDE LISTING APPROVAL FOR LIGHTING CONTROL PANEL |
| AND ASSOCIATED DEVISES CONNECT FOR THE SYSTEM. |
| 7) REVIEW ELECTRICAL CIRCUITS AND FEEDERS TO COMPLY |
| WITH FBC ENERGY CONSERVATION CODE SECTION 505.7.3. |
| 8) PROVIDE LIGHTING STUDY THAT SHOWS THE INTERIOR AND |
| EXTERIOR LIGHTING POWER DENSITIES IS IN COMPLIANCE WITH |
| FBC ENERGY CONSERVATION CODE SECTION 505.5.3 AND 505.6. |
| 9) PROVIDE COMPLIANCE WITH FLASH PROTECTION IN |
| COMPLIANCE WITH NEC 110.16. |
| 10) PROVIDE THE AVAILABLE FAULT CURRENT LEVEL AT THE |
| LINE TERMINALS OF THE EQUIPMENT. NEC 110.9. |
| 11) PROVIDE THAT ALL LIGHTING IS LISTED. |
| 12 PROVIDE PHOTOMETRICS FOR THE INTERIOR AND EXTERIOR |
| LIGHTING. FBC 1006.1. |
| |
| SENT TO C-23. |