2013-08-01 12:02:48 | RESIDENTIAL (R3) GARAGE CONVERSION, MECHANICAL REVIEW |
| COMMENTS. |
| CODE: 2010 FBC. |
| |
| 1- REVISE EQUIPMENT SIZING CALCULATIONS SUBMITTED (SEC. |
| 403.6 OF 2010 FBC-ENERGY CONSERVATION) : |
| A) DESIGN CONDITIONS TO COMPLY WITH SEC. 302.1 OF 2010 |
| FBC-ENERGY CONSERVATION. |
| |
| B) SPECIFY OUTDOOR AND INDOOR UNITS (MODEL AND |
| MANUFACTURER) SEC. 403.6.1 OF 2010 FBC-ENERGY |
| CONSERVATION. |
| |
| 2 PROVIDE COMPLETE A/C PLANS. SHOW EQUIPMENT SPECIFIED |
| ON THE EQUIPMENT SIZING CALCULATIONS, ALL DUCTWORK |
| LOCATION AND SIZES, EQUIPMENT LOCATION, ETC. SEC. |
| 107.3.5.3 (10) OF CITY AMENDMENTS TO FBC. |
| |
| 3- PLANS TO SHOW COMPLIANCE WITH THE RETURN AIR AND |
| BALANCED RETURN AIR REQUIREMENTS OF SEC. R1602 OF 2010 |
| FBC-RESIDENTIAL. |
| |
| 4- HOW GETTING R-15 VALUE ON CONCRETE BLOCK WALLS, AND |
| R-30 IN CEILING ON A FLAT ROOF AS SHOWN ON THE |
| EQUIPMENT SIZING CALCULATIONS. SEC. 107.2.1 CITY |
| AMENDMENTS TO FBC. |
| |
| 5- CLARIFY IF CALCULATIONS ARE FOR THE CONVERTED GARAGE |
| AREA ONLY OR FOR ENTIRE HOUSE. IF CHANGING THE A/C SIZE |
| FOR ENTIRE HOUSE, THEN THE CALCULATIONS NEED TO TAKE |
| INTO CONSIDERATION THE WHOLE HOUSE NOT JUST THE GARAGE |
| AREA. SEC. 107.2.1 CITY AMENDMENTS TO FBC. |
| |
| 6- COORDINATE EQUIPMENT SIZING CALCULATIONS WITH THE |
| ENERGY CALCULATIONS. SEC. 107.2.1 CITY AMENDMENTS TO |
| FBC. |
| |
| IF YOU HAVE ANY QUESTIONS, PLEASE CALL |
| JULIO GOMEZ |
| COMMERCIAL COMBINATION PLANS EXAMINER |