Date |
Text |
2013-03-25 16:35:54 | |
| PERMIT: 13010504 |
| ADD: 631 EVERNIA ST. |
| CONT: KAUFMAN LYNN |
| TEL: (561)361-6700 |
| |
| |
| EVERNIA PLACE |
| AFFORDABLE SENIOR HOUSING |
| |
| 2010 FLORIDA BUILDING CODE W |
| * WEST PALM BEACH ADMINISTRATIVE AMENDMENTS |
| |
| 2ND REVIEW |
| MARCH 25/ 2013 |
| ACTION: DENIED |
| |
| 1) SEMI-COMPLIED. |
| |
| THE CIVIL PLAN C-2 APPEARS THAT THE LOTS ARE TO BE |
| UNIFIED, A TITLE OF UNITY IS REQUIRED. UNITY OF TITLE. |
| THE PROPOSED BUILDING STRUCTURE TRANSGRESSES LEGAL |
| BOUNDARY LINES BETWEEN THE LOTS WHICH COMBINE TO FORM |
| 'THE SITE'. A 'UNITY OF TITLE' SHALL BE RECORDED AT THE |
| COUNTY COURTHOUSE. SUBMIT A COPY OF THE RECORDED 'UNITY |
| OF OF TITLE' DOCUMENT SO THAT FBC TABLE 601 BOUNDARY |
| LINE REQUIREMENTS MAY BE DEEMED NOT APPLICABLE. |
| SEE WEBSITE FOR APPLICATION: |
| HTTP://WWW.WPB.ORG/ENGINEERING/ENG_FORMS.PHP |
| "APPLICATION FOR UNITY OF TITLE" |
| |
| HTTP://WWW.WPB.ORG/ENGINEERING/UPLOADS/2010-10-12-14-45 |
| -38-UNITYOFTITLE3.PDF |
| |
| VINCENT J NOEL |
| SURVEYOR/REAL ESTATE SUPERVISOR |
| ENGINEERING SERVICES DEPARTMENT |
| 401 CLEMATIS STREET |
| WEST PALM BEACH, FL 33401 |
| PHONE: 494-1040 EXT: 1096 |
| FAX: 494-1116 |
| E-MAIL: [email protected] |
| |
| ********************************************* |
| |
| MANUEL JULIAN GONZALEZ |
| ENGINEERING PROJECT COORDINATOR |
| ENGINEERING SERVICES DEPARTMENT |
| 401 CLEMATIS STREET, 4TH FLOOR |
| WEST PALM BEACH, FL 33401 |
| (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402) |
| MAIN PHONE: (561) 822-1200 |
| DIRECT: (561) 494-1085 |
| FAX: (561) 494-1116 |
| MOBILE: (561) 644-7301 |
| EMAIL: [email protected] |
| WWW.WPB.ORG/ENGINEERING |
| |
| |
| 2) 2ND REQUEST! THIS BUILDING IS CONSIDERED A THRESHOLD |
| BUILDING, (3) SETS OF PLANS, PRODUCT APPROVALS WILL |
| REQUIRED, ONE SET FOR THE SPECIAL INSPECTOR, ONE FOR |
| THE FIELD, AND A COPY WILL BE KEPT ELECTRONICALLY BY |
| THE BUILDING DEPARTMENT, FOR OUR RECORDS. |
| |
| THRESHOLD INSPECTION PLAN FL S. S. 553.71(7) " |
| THRESHOLD BUILDING" MEANING ANY BUILDING WHICH IS |
| GREATER THAN (3) STORIES OR 50 FT IN HEIGHT, OR WHICH |
| HAS AN ASSEMBLY OCCUPANCY CLASSIFICATION AS DENIED IN |
| THE |
| FLORIDA BUILDING CODE WHICH EXCEEDS 5,000 SQ FT IN AREA |
| AND AN OCCUPANT CONTENT OF GREATER THAN 500 PERSONS. |
| |
| 2A) 2ND REQUEST. 109.3.6.1 THE ENFORCING AGENCY SHALL |
| REQUIRE A SPECIAL INSPECTOR TO PERFORM STRUCTURAL |
| INSPECTIONS ON A THRESHOLD BUILDING PURSUANT TO A |
| WRITTEN STRUCTURAL INSPECTION PLAN PREPARED BY THE |
| ENGINEER OF RECORD. THE STRUCTURAL INSPECTION PLAN MUST |
| BE SUBMITTED TO THE ENFORCING AGENCY PRIOR TO THE |
| ISSUANCE OF A BUILDING PERMIT FOR THE CONSTRUCTION OF A |
| THRESHOLD BUILDING. THE PURPOSE OF THE STRUCTURAL |
| INSPECTION PLAN IS TO PROVIDE SPECIFIC INSPECTION |
| PROCEDURES AND SCHEDULES SO THAT THE BUILDING CAN BE |
| ADEQUATELY INSPECTED FOR COMPLIANCE WITH THE PERMITTED |
| DOCUMENTS. |
| |
| 2B) 2ND REQUEST. THRESHOLD INSPECTOR: WPB AMENDMENT |
| 109.3.6.2 W.P.B. CONSTRUCTION SERVICES DEPARTMENT |
| REQUEST FOR THRESHOLD BUILDINGS A SPECIAL INSPECTOR AS |
| REQUIRED BY FL S S 553.79(5) FLORIDA STATUTES TO THE |
| MINIMUM INSPECTIONS REQUIRED BY THIS CODE. |
| CONTACT KEN CONRAD MANAGER OF THE SPECIAL INSPECTOR |
| PROGRAM AT (561)805-6666 FOR FURTHER INFORMATION BEFORE |
| THE PERMIT MAY BE ISSUED. |
| |
| |
| 2C) COMPLIED. THRESHOLD BLDG, REQUIRED STATEMENT: |
| W.P.B. AMENDMENT 109.3.6.4.4 ALL PLANS FOR THE BUILDING |
| WHICH ARE REQUIRED TO BE SIGNED AND SEALED BY THE |
| ARCHITECT OR ENGINEER OF RECORD CONTAIN A STATEMENT |
| THAT, TO THE BEST OF THE ARCHITECT'S PR ENGINEER'S |
| KNOWLEDGE, THE PLANS AND SPECIFICATIONS COMPLY WITH THE |
| APPLICABLE FIRE-SAFETY STANDARDS AS DETERMINED BY THE |
| LOCAL AUTHORITY IN |
| ACCORDANCE WITH THIS SECTION AND 633 FLORIDA STATUTE. |
| |
| 2D) 2ND REQUEST. 109.3.6 THRESHOLD BUILDINGS, OPERATING |
| GUIDELINES FOR THRESHOLD INSPECTORS #26. ASSURE THAT |
| THE DESIGNER HAS REQUIRED ON THE PLANS OR |
| SPECIFICATIONS ONE MATERIAL, APPROVED FOR FIRE STOPPING |
| PENETRATIONS, FOR WALLS AND CEILINGS. |
| |
| 2E) A THRESHOLD PLAN REVIEW STOP WILL BE PUT ON THIS |
| PROJECT UNTIL THESE ITEMS ARE COMPLETED AS REQUESTED BY |
| THE CHIEF BUILDING INSPECTOR KEN CONRAD: |
| |
| PLEASE CALL THE CITY OF WEST PALM BEACH?S AUTOMATED |
| TELEPHONE INSPECTIONS LINE |
| (561) 805-6700) FOR IN-PROGRESS INSPECTIONS FOR |
| AUDITING OF JOBSITE INSPECTIONS. |
| |
| 2E)(1) 2ND REQUEST. THE CONTRACTOR WILL PRODUCE A JOB |
| SUMMARY OR HISTORY FOR THIS TYPE OF CONCRETE |
| RESTORATION. THIS MAY BE SUBMITTED TO KEN CONRAD BY |
| E-MAIL. KEN CONRAD: [email protected] |
| |
| 2E)(2) 2ND REQUEST. FOR THE SPECIAL INSPECTOR PLEASE |
| PROVIDE A RESUME' OF INSPECTION EXPERIENCE ON PREVIOUS |
| PROJECT. THE RESUME' MUST BE ACCOMPANIED BY ALL |
| CERTIFICATES AS SPECIFIED HEREIN. THE BUILDING OFFICIAL |
| OR HIS DESIGNEE WILL REVIEW THE RESUME'. AFTER THE |
| RESUME' IS REVIEWED, AN INTERVIEW WILL BE SCHEDULED. |
| UNDER NO CIRCUMSTANCES WILL AN INSPECTOR BE INTERVIEWED |
| FOR WORK WITHOUT FIRST MEETING THE ABOVE CRITERIA. |
| CONTACT KEN CONRAD |
| TEL: 561-805-6666 |
| E-MAIL: [email protected] |
| |
| 3) MISSING SOILS REPORT BY ARDAMEN 11/19/2012, & |
| 12/27/2012. 2010 FBC-B 1803.2 SOILS INVESTIGATION |
| REQUIRED. |
| |
| 4-5) COMPLIED. |
| |
| 6) 2ND REQUEST 2010 FBC 107.3.4.1 PRODUCT APPROVALS. |
| THOSE PRODUCTS WHICH ARE REGULATED BY THE DCA RULE |
| 9N-03 SHALL BE REVIEWED AND APPROVED IN WRITING BY THE |
| DESIGNER OF RECORD PRIOR TO SUBMITTAL FOR |
| JURISDICTIONAL APPROVAL. |
| FL 61G1-23.015 (2) THE ARCHITECT IS RESPONSIBLE FOR |
| SUPERVISING AND REVIEWING ALL PROJECT DATA, REPORTS, |
| SHOP DRAWINGS ETC.. |
| |
| 7) 2ND 2010 FBC-B 1609.1.2 PROTECTION OF OPENINGS, |
| 1609.6.4.41 COMPONENTS & CLADDING |
| FLORIDA DEPARTMENT OF COMMUNITY AFFAIRS RULE 9N-3 NOV. |
| 01/ 2010 (31) SUB-CATEGORY OF PRODUCTS OR CONSTRUCTION |
| SYSTEMS THAT WILL REQUIRE PRODUCT APPROVALS: |
| (31)(A) EXTERIOR DOORS. |
| (B) WINDOWS |
| (C) PANEL WALLS: STOREFRONTS, CURTAIN WALLS, WALL |
| LOUVERS, EFIS SYSTEMS, |
| (D) ROOFING PRODUCTS AND ASSEMBLIES |
| (E) SHUTTERS |
| (F) SKYLIGHTS |
| (G) EXTERIOR COOLER, FREEZERS & PRE-ENGINEERED A/C |
| STANDS |
| |
| 8) 2ND REQUEST. FOLDER CONTAINING WALL LOUVER NOA |
| 11-0408.05 EXPIRED JULY 09/12. CUT SHEET FOR THE RUSKIN |
| ACL 12450 LIST A NOA 11-0207.21 BUT NOT PROVIDED. |
| |
| 9) SHEET LS-101: |
| |
| 9A-F) COMPLIED . |
| |
| |
| 10) SHEET A-201: |
| 10A) 2ND REQUEST. IN BOTH STAIRWELLS THE NORTH AND EAST |
| CONTINUE BELOW GRADE, PLEASE PROVIDE COMPLIANCE WITH |
| 2010 FBC-B 1022.7 DISCHARGE IDENTIFICATION. A STAIRWAY |
| IN AN EXIT ENCLOSURE SHALL NOT CONTINUE BELOW ITS LEVEL |
| OF EXIT DISCHARGE UNLESS AN APPROVED BARRIER IS |
| PROVIDED AT THE LEVEL OF EXIT DISCHARGE TO PREVENT |
| PERSONS FROM UNINTENTIONALLY CONTINUING INTO LEVELS |
| BELOW. DIRECTIONAL EXIT SIGNS SHALL BE PROVIDED AS |
| SPECIFIED IN SECTION 1011. |
| |
| 10B) 2ND REQUEST. PLEASE PROVIDE COMPLIANCE WITH 2010 |
| FBC-B: [F] 914.1 SHAFTWAY MARKINGS. |
| VERTICAL SHAFTS SHALL BE IDENTIFIED AS REQUIRED BY |
| SECTIONS 914.1.1 AND 914.1.2. |
| |
| [F] 914.1.1 EXTERIOR ACCESS TO SHAFTWAYS. |
| OUTSIDE OPENINGS ACCESSIBLE TO THE FIRE DEPARTMENT AND |
| THAT OPEN DIRECTLY ON A HOISTWAY OR SHAFTWAY |
| COMMUNICATING BETWEEN TWO OR MORE FLOORS IN A BUILDING |
| SHALL BE PLAINLY MARKED WITH THE WORD ?SHAFTWAY? IN RED |
| LETTERS AT LEAST 6 INCHES (152 MM) HIGH ON A WHITE |
| BACKGROUND. SUCH WARNING SIGNS SHALL BE PLACED SO AS TO |
| BE READILY DISCERNIBLE FROM THE OUTSIDE OF THE |
| BUILDING. |
| |
| [F] 914.1.2 INTERIOR ACCESS TO SHAFTWAYS. |
| DOOR OR WINDOW OPENINGS TO A HOISTWAY OR SHAFTWAY FROM |
| THE INTERIOR OF THE BUILDING SHALL BE PLAINLY MARKED |
| WITH THE WORD ?SHAFTWAY? IN RED LETTERS AT LEAST 6 |
| INCHES (152 MM) HIGH ON A WHITE BACKGROUND. SUCH |
| WARNING SIGNS SHALL BE PLACED SO AS TO BE READILY |
| DISCERNIBLE. |
| |
| EXCEPTION: MARKINGS SHALL NOT BE REQUIRED ON SHAFTWAY |
| OPENINGS THAT ARE READILY DISCERNIBLE AS OPENINGS ONTO |
| A SHAFTWAY BY THE CONSTRUCTION OR ARRANGEMENT. |
| |
| [F] 914.2 EQUIPMENT ROOM IDENTIFICATION. |
| FIRE PROTECTION EQUIPMENT SHALL BE IDENTIFIED IN AN |
| APPROVED MANNER. ROOMS CONTAINING CONTROLS FOR |
| AIR-CONDITIONING SYSTEMS, SPRINKLER RISERS AND VALVES |
| OR OTHER FIRE DETECTION, SUPPRESSION OR CONTROL |
| ELEMENTS SHALL BE IDENTIFIED FOR THE USE OF THE FIRE |
| DEPARTMENT. APPROVED SIGNS REQUIRED TO IDENTIFY FIRE |
| PROTECTION EQUIPMENT AND EQUIPMENT LOCATION SHALL BE |
| CONSTRUCTED OF DURABLE MATERIALS, PERMANENTLY INSTALLED |
| AND READILY VISIBLE. |
| 10) 2ND REQUEST. SHEET A-201: |
| 10C) PROVIDE COMPLIANCE WITH F] 915.1 GENERAL. |
| EMERGENCY RESPONDER RADIO COVERAGE SHALL BE PROVIDED IN |
| ALL NEW BUILDINGS IN ACCORDANCE THE FLORIDA FIRE |
| PREVENTION CODE. |
| |
| 10D) MACHINE ROOM-LESS ELEVATORS SHEET A-621. KONE |
| ECOSPACE. WILL NEED MANUFACTURERS REQUIREMENTS FOR |
| INSTALLATION. MAY STILL NEED TO INCORPORATE HOIST WAY |
| VENTING REQUIREMENTS FOUND IN 2010 FBC-B 3004. PROVIDE |
| COMPLIANCE WITH 3002.4 ELEVATOR CAR TO ACCOMMODATE AN |
| AMBULANCE STRETCHER. |
| |
| 11) SHEET A202 TRASH CHUTE |
| 11A) SEMI COMPLIED, LS-103/ LS-104. THE NORTH STAIRWELL |
| INDICATES THE TRASH CHUTE ACTUALLY PENETRATING THE 2 |
| HOUR FIRE RATED STAIR ENCLOSURE. PLEASE REVIEW 2010 |
| FBC-B 1022.4 PENETRATIONS INTO & THROUGH AN EXIT |
| ENCLOSURE. PLEASE REVIEW THE REQUIREMENTS FOR |
| TERMINATION ROOM 708.13.4. |
| |
| 11B) SEMI-COMPLIED. LS-103 ? LS-104. THE TRASH CHUTE |
| VESTIBULE COMMON TO 2ND- 6TH FLOORS, BEING LOCATED IN A |
| VESTIBULE. SHEET LS-103/ LS-104 THE 2010 FBC-B 708.13.3 |
| REQUIRES REFUSE CHUTES TO HAVE A SEPARATE ACCESS ROOM |
| TO BE A 1 HR FIRE BARRIER ENCLOSURE AND 3/4 HR OPENING |
| PROTECTIVES. THE LIFE SAFETY SHEETS DO NOT INDICATE A |
| 3/4 HR RATING ON THE DOOR. 708.13.1 OPENINGS SHALL NOT |
| OPEN INTO CORRIDORS. 708.13.1. |
| |
| 11C) 2ND REQUEST LS-103/ LS-104. THE TRASH CHUTE IS |
| DEPICTED TO BE IN A RATED SHAFT WITH A A/C DUCT IN THE |
| SAME ENCLOSURE. 2010 FBC-B 708.13.1 A SHAFT ENCLOSURE |
| CONTAINING A REFUSE CHUTE SHALL NOT BE USED FOR ANY |
| OTHER PURPOSE AND SHALL BE ENCLOSED IN ACCORDANCE WITH |
| 708.4. |
| |
| 11D) 2ND REQUEST. SHEET A-601DETAIL # 1 INDICATES THE |
| REFUSE CHUTE GOES THROUGH THE ROOF BUT THE SHAFT |
| ENCLOSURE STOPS AT THE CEILING OF THE 6TH FLOOR, PLEASE |
| REVIEW 708.12 ENCLOSURES AT THE TOP AND THE REQUIRED |
| FIRE RATING OF MATERIALS. |
| |
| 11E) 2ND REQUEST. SHEET A-601 DETAIL # 1 TRASH CHUTE |
| SHAFT STOPS AT THE BOTTOM OF THE 2ND FLOOR, IT DOES NOT |
| CONTINUE THROUGH TO THE 1ST FLOOR ALTHOUGH THE SHAFT |
| DOES PENETRATE THE 2ND FLOOR ASSEMBLY AND 1ST FLOOR |
| WALL. PLEASE SEE 708.11 ENCLOSURE AT THE BOTTOM . |
| |
| 11F) 2ND REQUEST. PLEASE PROVIDE MANUFACTURERS SPEC ON |
| THE MATERIALS TO BE USED FOR THE REFUSE CHUTE. |
| 708.13.2. |
| |
| 11G) 2ND REQUEST. 2010 FBC-B 708.13.6. AUTOMATIC |
| SPRINKLERS SYSTEM. AN APPROVED AUTOMATIC SPRINKLER |
| SYSTEM SHALL BE INSTALLED IN ACCORDANCE WITH SECTION |
| 903.2.11.2. F] 903.2.11.2 RUBBISH AND LINEN CHUTES. |
| 2010 FBC-B 903.2.11.2. AN AUTOMATIC SPRINKLER SYSTEM |
| SHALL BE INSTALLED AT THE TOP OF RUBBISH AND LINEN |
| CHUTES AND IN THEIR TERMINAL ROOMS. CHUTES EXTENDING |
| THROUGH THREE OR MORE FLOORS SHALL HAVE ADDITIONAL |
| SPRINKLER HEADS INSTALLED WITHIN SUCH CHUTES AT |
| ALTERNATE FLOORS. CHUTE SPRINKLERS SHALL BE ACCESSIBLE |
| FOR SERVICING. PROVIDE DETAILS FOR THE SERVICING OF THE |
| FIRE SPRINKLERS. |
| |
| 12) 2ND REQUEST. SHEET A-402 DETAILS A-601/ DETAIL # 1, |
| A-602 DETAIL # 1 BOTH DEAL WITH ROOFTOP CONSTRUCTION. |
| NOTE: METAL SPANISH TILE ROOFING TO BE ATTACHED TO 5/8? |
| DENSEDECK WHICH WILL BE SECURED TO THE METAL DECK. NOTE |
| THE PRODUCT APPROVALS FOR THE METAL ROOF TILE MAY NOT |
| INCLUDE DENSE DECK AS THE DECKING MATERIAL THEY WERE |
| TESTED WITH NOR THE METAL B DECK BELOW THAT. IF THAT IS |
| THE CASE THE ENGINEER OF RECORD WILL NEED TO PROVIDE |
| CALCULATIONS TO RESIST THE MOMENT OF UPLIFT. COMPONENTS |
| & CLADDING 1609.6.4.4.1. |
| |
| 13) 2ND REQUEST. SHEET A450 DETAILS 1-3 HAVE GENERAL |
| NOTES AT DETAILS INDICATING SOLID SHEATHING THEN NOTES |
| 1 & 2 THE SPECIFIC NOTE INDICATES THE USE OF |
| DENSE-DECK. PLEASE BE AWARE OF PRESSURES FROM THE |
| PRODUCT APPROVAL WILL BE FOR 3/4 INCH OR 5/8 CDX |
| PLYWOOD NOT FOR DENSE DECK, IF PLYWOOD IS USED IT NEEDS |
| TO BE FIRE RETARDENT TREATED PLYWOOD SEE 603.1.1. |
| |
| 13A) 2ND REQUEST. 2010 WPB ADMINISTRATIVE CODE DOES NOT |
| ALLOW FOR THE USE OF TERMS SUCH AS ?EQUIVALENT, ? SUCH |
| INFORMATION SHALL BE SPECIFIC AND TECHNICAL IN NATURE. |
| 107.2.1. INFORMATION ON CONSTRUCTION DOCUMENTS. |
| |
| 13B) 2ND REQUEST. THIS BUILDING TYPE IS INDICATED AS A |
| TYPE I-B BUILDING PLEASE SEE 2010 FBC-B 603.1.1 FIRE |
| RETARDANT TREATED WOOD AND ALLOWABLE USES. |
| |
| 13C) 2ND REQUEST. PLEASE BE AWARE OF THE ROOFING |
| MATERIALS (PRODUCT APPROVALS) THAT WERE TESTED AN THE |
| THICKNESS OF THE ROOF DECKING SHEATHING, AND |
| LIMITATIONS SET FORTH IN THE PRODUCT APPROVALS. |
| 107.2.1.3 ADDITIONAL INFORMATION REQUIRED. |
| |
| 14) 2ND REQUEST. SHEET A452 ROOF DETAIL # 1 INDICATES |
| THE USE OF LIGHT WEIGHT INSULATING CONCRETE AND THE |
| INSULATION BEING TAPERED TO A MINIMAL AMOUNT. 2010 |
| ENERGY CODE 506.2.1 REQUIRES A MINIMUM OF R-19 FOR |
| MULTI-FAMILY RESIDENCES, AS DEPICTED THERE IS LESS THAN |
| A R-19 INSULATION AT THE ROOF DRAINS A MINIMUM OF R-19 |
| INSULATION NOT AN AVERAGE. SEE 2007 BOAF INFORMAL |
| INTERPRETATION # 5438. WILL NEED ADDITIONAL INFORMATION |
| ON THE LIGHTWEIGHT CONCRETE INSULATION. |
| |
| 15) 2ND REQUEST. A-609 DETAIL # 2 INDICATES THE USE OF |
| PRE-MANUFACTURED FOAM FACTORY # 419 TRIM ON THE |
| EXTERIOR OF THE BUILDING AT A HEIGHT GREATER THAN 40 |
| FEET ABOVE GRADE. SEE 2010 FBC-B 1406.2.2 (2). |
| COMBUSTIBLE EXTERIOR TRIM. |
| |
| 16) 2ND REQUEST. SHEET A-630 INDICATEES STAIR RAILING |
| DETAILS, NONE ARE SHOWN HANDRAILS OR GAURDRAILS. 2010 |
| FBC-B 1013.3 GUARDS SHALL NOT HAVE OPENINGS WHICH ALLOW |
| PASSAGE OF A SPHERE 4 INCHES IN DIAMETER. GAURDRAILS TO |
| COMPLY WITH 1013. |
| |
| 17) 2ND REQUEST. SHEET -634 DETAIL # 1 INDICATES THE |
| USE OF ICYENE FOAM WALL INSULATION, PLEASE PROVIDE |
| TESTING REPORT FOR THE ICYENE SHOWING COMPLIANCE WITH |
| FBC-B 2603.4. |
| |
| 18A) 2ND REQUEST, SHEET A-650 P2 PLEASE PROVIDE EITHER |
| THE UL LISTING INDICATING THE I HOUR FIRE RATING. |
| |
| 18B) 2ND REQUEST.SHEET A650 P2 INDICATES A STC RATING |
| OF 49 FOR UL LISTING # U465, THE 2010 FBC-B 1207.2 |
| REQUIRES A STC RATING OF 50 (45 IF FIELD TESTED). |
| |
| 18C) 2ND REQUEST. PLEASE SHOW COMPLIANCE WITH 2010 |
| FBC-B 1207.3 STRUCTURE BORNE SOUND, FLOOR CEILING |
| ASSEMBLIES TO HAVE A INSULATION CLASS (IIC) RATING OF |
| NOT LESS THAN 50, (45 IF FIELD TESTED). |
| |
| 19)2ND REQUEST A-202 PLAZA DECK, PLEASE SHOW COMPLIANCE |
| WITH THE REQUIREMENT 2010 FBC-B 424.1.1 EFFECTIVE |
| BARRIER REQUIREMENTS FOR POOLS AND SPAS & 424.1.3.1.9.. |
| |
| 20)COMPLIED. |
| |
| 21) BEFORE A PERMIT TO CONSTRUCT, MAY BE ISSUED, IMPACT |
| FEES MUST BE PAID TO PALM BEACH COUNTY. THE ACTUAL |
| PERMIT SET OF PLANS MUST BE STAMPED BY THAT OFFICE, AND |
| A COPY OF THE PAID RECEIPT ATTACHED TO THE PERMIT |
| APPLICATION. PLEASE CALL (561)233-5025 FOR MORE |
| INFORMATION. |
| |
| |
| *****INFORMATIONAL*****PLEASE!!!!!!!: WHEN RESUBMITTING |
| PLANS PLEASE INDICATE THE REVISION & REMOVE & REPLACE |
| ANY PAGES AS NECESSARY. A TRANSMITTAL LETTER LISTING |
| THE ORIGINAL REVIEW COMMENT NUMBER, WITH A DESCRIPTION |
| OF THE REVISION MADE, IDENTIFYING THE SHEET OR |
| SPECIFICATION PAGE WHERE THE CHANGES CAN BE FOUND WILL |
| HELP TO EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR |
| ANTICIPATED COOPERATION. |
| |
| JAMES A. WITMER CBO |
| SENIOR COMMERCIAL COMBINATION PLANS EXAMINER |
| TEL: 561-805-6715 |
| FAX: 561-805-6676 |
| E-MAIL: [email protected] |
| CONSTRUCTION SERVICES HOME PAGE |
| HTTP://WWW.CITYOFWPB.COM/CONSTRUCTION/INDEX.PHP |
| |
| PLEASE NOTE: FLORIDA HAS A VERY BROAD PUBLIC RECORDS |
| LAW. WRITTEN COMMUNICATIONS TO OR FROM LOCAL OFFICIALS |
| REGARDING CITY BUSINESS ARE PUBLIC RECORD, AVAILABLE TO |
| THE PUBLIC UPON REQUEST. YOUR E-MAIL COMMUNICATIONS ARE |
| THEREFORE SUBJECT TO PUBLIC DISCLOSURE. |
| |
| MEMBER OF BOAF: BUILDING OFFICIALS ASSOCIATION OF |
| FLORIDA SAVING LIVES AND PROPERTY SINCE 1953 |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |