2013-02-08 14:24:44 | FBC 2010 PLUMBING REVIEW #1 |
| DENIED: |
| |
| 1. THE CENTRAL LAUNDRY ROOMS WILL REQUIRE A 3" FLOOR |
| DRAIN. |
| 412.4 PUBLIC LAUNDRIES AND CENTRAL WASHING FACILITIES. |
| IN PUBLIC COIN-OPERATED LAUNDRIES AND IN THE CENTRAL |
| WASHING FACILITIES OF MULTIPLE-FAMILY DWELLINGS, THE |
| ROOMS CONTAINING AUTOMATIC CLOTHES WASHERS SHALL BE |
| PROVIDED WITH FLOOR DRAINS LOCATED TO READILY DRAIN THE |
| ENTIRE FLOOR AREA. SUCH DRAINS SHALL HAVE A MINIMUM |
| OUTLET OF NOT LESS THAN 3 INCHES (76 MM) IN DIAMETER. |
| |
| 2. SHEET P 0.1 PLASTIC PAN IN PLENUM IS REQUIRED TO BE |
| PLENUM RATED OR METAL. |
| SEE M602.2.1 MATERIALS WITHIN PLENUMS. |
| EXCEPT AS REQUIRED BY SECTIONS 602.2.1.1 THROUGH |
| 602.2.1.6, MATERIALS WITHIN PLENUMS SHALL BE |
| NONCOMBUSTIBLE OR SHALL HAVE A FLAME SPREAD INDEX OF |
| NOT MORE THAN 25 AND A SMOKE-DEVELOPED INDEX OF NOT |
| MORE THAN 50 WHEN TESTED IN ACCORDANCE WITH ASTM E 84 |
| OR UL 723. |
| |
| 3. SHEET P 2.3 SHOWS A 3/4" WATER MAIN SUPPLYING A 1" |
| PIPE FOR THE POOL. |
| |
| 4. SHEET P 3.1 THE WATTS BRVT VALVE IS NOT SHOWN WITH A |
| DRAIN LINE. IF THE DRAIN IS TO THE PAN THE WATER HEATER |
| WILL BE REQUIRED TO BE RAISED TO BE OUT OF ANY RESIDUAL |
| WATER IN THE PAN. |
| |
| 5. SHEET A 401 SHOWS A TOTAL OF 14 ROOF DRAINS AND 13 |
| (ONE IS MISSING) EMERGENCY OVERFLOW DRAINS. SHEET P.2.4 |
| SHOWS A TOTAL OF 21 ROOF DRAINS AND NO EMERGENCY |
| OVERFLOW DRAINS. |
| ALSO, SECONDARY ROOF DRAINS ARE REQUIRED TO BE ON A |
| SEPARATE SYSTEM. |
| 1107.2 SEPARATE SYSTEMS REQUIRED. |
| SECONDARY ROOF DRAIN SYSTEMS SHALL HAVE THE END POINT |
| OF DISCHARGE SEPARATE FROM THE PRIMARY SYSTEM. |
| DISCHARGE SHALL BE ABOVE GRADE, IN A LOCATION THAT |
| WOULD NORMALLY BE OBSERVED BY THE BUILDING OCCUPANTS OR |
| MAINTENANCE PERSONNEL. |
| |
| REVIEW BY |
| LARRY WAGNER |
| CHIEF PLUMBING INSPECTOR |
| PHONE # 805-6692 |
| EMAIL [email protected] |
| FAX # 805-6676 |
| |
| |