Date Text
2013-01-16 15:16:452010 FBC
  
 DENIED BY BUILDING
  
 1) THE PLANS APPEAR TO SHOW TWO SEPARATE UNITS EACH
 WITH IT'S OWN KITCHEN. FBCR 302.3 REQUIRES ONE HOUR
 FIRE-RESISTANCE BETWEEN THE TWO UNITS. SHOW COMPLIANCE.
  
 2) SUBMIT TWO SETS OF ENERGY CALCULATIONS FOR THE
 STRUCTURE. SHOW COMPLIANCE WITH FBC ENERGY CONSERVATION
 SECTION 401.2.
  
 3) THE MEAN ROOF HEIGHT FOR THE STRUCTURE IS 20 FEET
 PER THE PLANS. PLEASE INCREASE THE OPENING PRESSURES TO
 CORRESPOND WITH THE 20 FT MRH. FBCR 301.2.1
  
 4) SHOW COMPLIANCE WITH FBC R318.1 FOR TERMITE
 PROTECTION.
  
 5) SUBMIT TWO COPIES OF THE EVALUATION REPORT FOR THE
 ICYNENE SPRAY FOAM INSULATION. FBCR316.3
  
 6) PROVIDE A DETAIL SHOWING HOW THE FLOOR ASSEMBLY
 ABOVE THE COVERED ENTRY WILL BE INSULATED. FBC ENERGY
 CONSERVATION AND CITY AMENDMENTS 107.2.1
  
 7) THE NOA NUMBERS LISTED IN THE WINDOW AND DOOR
 SCHEDULES ON SHEET A-1 DO NOT MATCH THE ONES ON THE
 PRODUCT APPROVALS THAT WERE SUBMITTED. PLEASE CORRECT.
 CITY AMENDMENTS 107.2.1 AND DCA RULE 9N-3
  
 8) SPECIFY HOW THE BASE OF THE 4 X 4 POSTS SUPPORTING
 THE BALCONY WILL BE ANCHORED TO THE CONCRETE
 FOUNDATION. FBCR 301.1
  
 9) SPECIFY HOW THE BALCONY IS ATTACHED TO THE
 STRUCTURE. CITY AMENDMENTS 107.2.1.3
  
 10) THE FRONT ELEVATION ON A-1 SPECIFIES A 6 X 6 POST
 AT THE BALCONY. PLEASE CLARIFY. CITY AMENDMENTS 107.2.1
  
 11) SHOW THAT THE SPIRAL STAIRS COMPLY WITH FBCR
 311.7.9.1.
  
 12) THE TYPICAL FRAME DETAIL ON A-1 APPEARS TO SHOW
 THAT THE END OF THE SHIPPING CONTAINERS WHERE THE DOORS
 HAVE BEEN REMOVED WILL BE FRAMED WITH 2 X 2 X 1/4"
 STEEL. PLEASE CLARIFY. ALSO CLARIFY HOW THESE WILL BE
 WELDED TO THE STRUCTURE AND HOW THE CORRUGATED STEEL
 SKIN WILL BE ATTACHED TO THE FRAMING. PLEASE BE
 SPECIFIC. CITY AMENDMENTS 107.2.1
  
 13) PROVIDE COMPLETE DETAILS OF THE FRAMING AT THE
 WINDOW AND DOOR OPENINGS AT RIGHT AND LEFT ELEVATIONS.
 FBCR 301.1 AND CITY AMENDMENTS 107.2.1
  
 14) INDICATE THE TYPE OF ROOF COVERING THAT WILL BE
 USED AND SUBMIT PRODUCT APPROVALS FOR IT. FBCR 903.1
  
 15) INDICATE HOW THE PLUMBING VENT ROOF PENETRATIONS
 THROUGH THE CORRUGATED STEEL WILL BE FLASHED. FBCR
 903.2
  
 16) SHOW COMPLIANCE WITH FBCR 318.6 FOR REQUIRED
 GUTTERS AND DOWNSPOUTS ON BUILDINGS WITH EAVES WITH
 LESS THAN 6 INCH PROJECTIONS.
  
 17) SUBMIT TWO COPIES OF PRODUCT APPROVALS FOR THE
 HARDI-PLANK SIDING AND THE COMPOSITE DECKING AS
 REQUIRED BY DCA RULE 9N-3.
  
 18) PROVIDE A STRUCTURAL ANALYSIS THAT INDICATES THE
 UPPER STORAGE CONTAINER CAN BE CANTILEVERED AS
 INDICATED ON THE PLANS. CITY AMENDMENTS 107.2.1.3
  
 ROBERT MCDOUGAL
 BLDG. PLAN REVIEW
 (561)805-6714
 [email protected]


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved