2013-02-15 11:19:39 | RESIDENTIAL (R3) ADDITION SECOND BUILDING REVIEW |
| CHECKLIST. |
| CODE: 2010 FBC. |
| |
| 1- SHEET 2 OF 4: |
| A) ORIGINAL COMMENT: |
| "OPENINGS ON EXISTING MASTER BEDROOM WERE CLOSED. |
| PROVIDE SPECIFICATIONS/DETAILS SHOWING HOW COMPLYING |
| WITH THE EGRESS REQUIREMENTS OF SEC. R310.". |
| |
| ***RESPONSE: |
| REVISED PLANS SHOW AN EGRESS WINDOW FROM THE MASTER |
| BATHROOM. THIS DOESN'T COMPLY. THE EGRESS WINDOW SHALL |
| BE IN THE MASTER BEDROOM, NOT IN THE MASTER BATHROOM. |
| REVISE AS REQUIRED TO COMPLY. |
| |
| B) ORIGINAL COMMENT: |
| "NOTE #2 SPECIFIES EXTERIOR WALLS TO BE 2X4 STUDS WITH |
| R-19 INSULATION. R-19 BATT INSULATION DOESN'T FIT ON |
| 2X4 WALL. REVISE AS REQUIRED. SEC. 107.2.1 CITY |
| AMENDMENTS TO FBC." AND, COORDINATE WITH ITEM #6(B) |
| BELOW. |
| |
| ***RESPONSE: |
| NOT ADDRESSED. |
| |
| 2- SHEET 3 OF 4: DESIGN PRESSURES SHOWN FOR THE NEW |
| WINDOWS DON'T CORRESPOND TO EXPOSURE "D". PROVIDE |
| ACTUAL CALCULATIONS SHOWING HOW THE DESIGN PRESSURES |
| WERE CALCULATED. SEC. 107.2.1.3 CITY AMENDMENTS TO FBC. |
| |
| 3- SHEET 4 OF 4: |
| A) ORIGINAL COMMENT: |
| REVISE NAILING SCHEDULE TYPE OF NAIL AND NAIL SPACING. |
| ROOF SHEATHING REQUIRES MIN. 8D RING SHANK NAILS. AND |
| THE SPACING REQUIRED FOR ZONE #3 IS 4"O.C. AND 6"O.C. |
| FOR ZONES 1 AND 2. SEC. R803.2.3.1 OF 2010 |
| FBC-RESIDENTIAL. |
| |
| ***RESPONSE: |
| NAILING SCHEDULE ON SHEET 4 OF 4 WAS NOT REVISED. |
| REVISE TO MATCH INFORMATION SHOWN ON THE TRUSS LAYOUT. |
| CLEARLY IDENTIFY THE ROOF ZONES ON THE TRUSS LAYOUT |
| (DRAWING SUBMITTED IS MISMATCHING ROOF ZONE 2 AND 3. |
| REVISE AS REQUIRED). |
| |
| 4- SOIL TEST REPORT SUBMITTED STATES THAT A SOIL |
| BEARING CAPACITY OF 2500 POUNDS PER SQUARE FOOT MAY BE |
| UTILIZED IN THE FOOTING DESIGN "WHEN THE FOOTINGS BEAR |
| ONE AND ONE HALF (1.5) TO TWO (2) FEET BELOW THE |
| FINISHED GRADE". (SEE SECOND TO LAST PARAGRAPH ON SHEET |
| 3 OF SOIL TEST REPORT). REVISE DRAWINGS AS REQUIRED TO |
| SHOW THIS RECOMMENDATIONS. SEC. 107.2.1 CITY |
| AMENDMENTS. |
| |
| 5- REVISED ENERGY CALCULATIONS SUBMITTED: |
| A) REVISE ITEMS 6A, 6B AND 6C. NEED TO PROVIDE MINIMUM |
| REQUIREMENTS FROM TABLE 402A OF SECOND SHEET OF THE |
| ENERGY CALCULATIONS SUBMITTED. AND, COORDINATE |
| INFORMATION WITH INFORMATION SHOWN ON TABLE 402A. |
| |
| 6- ACCORDING TO TRUSS PACKAGE SUBMITTED, THE DESIGNER |
| OF RECORD NEED TO REVISE THE FOLLOWING INFORMATION ON |
| THE PLANS (SEC. 107.2.1 CITY AMENDMENTS): |
| A) THE CONNECTOR (SIMPSON H16-2) DOESN'T MEET THE |
| UPLIFT LOADS CALCULATED BY THE TRUSS ENGINEER. REVISE |
| AS REQUIRED. |
| |
| B) TRUSSES NEED BEARING AT THE ENDS TO BE 6" (SEE TRUSS |
| A1 AND A2G. THEY SHOW RIGID SURFACE W=6"). PLANS SHOW |
| 2X4 WOOD STUDS. REVISE AS REQUIRED. |
| |
| C) SPECIFY THE CONNECTORS FOR EXISTING ROOF TRUSSES TO |
| BE RESTING ON NEW GIRDER TRUSS A2G. TRUSS LAYOUT |
| SPECIFIES CONNECTIONS BY OTHERS. |
| |
| 7- PROVIDE PRODUCT APPROVAL (2 COPIES) AS REQUIRED BY |
| DCA RULE 9N-3 FOR: |
| A) ALL SIMPSON STRUCTURAL CONNECTORS SPECIFIED ON PLANS |
| AND DETAILS. INCLUDING THE H16-2 CONNECTOR SPECIFIED AT |
| THE ENDS OF GIRDER TRUSS. ***NOTE: NEED TO COORDINATE |
| THIS CONNECTOR WITH ITEM #6 (A) ABOVE. PROVIDE ONLY THE |
| PRODUCT APPROVAL COVER PAGE AND PAGE SHOWING THE |
| SPECIFIED CONNECTOR. |
| |
| IF YOU HAVE ANY QUESTIONS, PLEASE CALL |
| JULIO GOMEZ |
| COMMERCIAL COMBINATION PLANS EXAMINER |
| (561)805-6712 |