2012-05-10 11:13:07 | COMMENTS FOR RAS 117 CALCULATIONS SUBMITTED |
| |
| 1- THE MAXIMUM DESIGN PRESSURES FOR SELECTED APPROVED |
| ASSEMBLY IS 45PSF. THIS ASSEMBLY DOESN'T EVEN COMPLY |
| WITH THE CALCULATED DESIGN PRESSURES OF 55.3PSF FOR THE |
| ROOF ZONE P1. THEREFORE THE SELECTED ASSEMBLY CAN'T BE |
| USED. SEE RAS 117 SEC. 8.1 AND REVISE AS REQUIRED. |
| |
| 2- PROVIDE THE ACTUAL RAS 117 CALCULATIONS SHOWING THE |
| REQUIRED NAIL ENHANCING FOR PERIMETER AND CORNER AREAS. |
| SEC. 107.2.1.3 CITY AMENDMENTS TO FBC. |
| |
| 3- ENGINEER DESIGN CRITERIA SPECIFIED EXPOSURE "B". |
| ACCORDING TO SEC. 1609.4 THIS BUILDING IS LOCATED ON |
| EXPOSURE "C" NOT "B". REVISE AS REQUIRED. |
| |
| 4- ENGINEER DESIGN CRITERIA SPECIFIES ULTIMATE DESIGN |
| WIND SPEED OF 160MPH. WE ARE IN THE 170 ULTIMATE DESIGN |
| WIND SPEED. SEE FIGURE 1609A AND REVISE AS REQUIRED. ON |
| THE OTHER HAND ENGINEER CAN DESIGN ON THE ACTUAL WIND |
| SPEED BASED ON THE ACTUAL BUILDING LOCATION. PROVIDE |
| CALCULATIONS SHOWING EXACT LOCATION. |
| |
| 5- ENGINEER NEEDS TO INDICATE THE ULTIMATE DESIGN WIND |
| SPEEDS AND THE ASD DESIGN WIND SPEEDS AS REQUIRED BY |
| ASCE 7-10. |
| |
| 6- CORRECT ADDRESS FOR THIS PROJECT IS 602 FOREST HILL |
| BLVD NOT 604. REVISE AS REQUIRED. |
| |
| IF YOU HAVE ANY QUESTIONS, PLEASE CALL |
| JULIO GOMEZ |
| COMMERCIAL COMBINATION PLANS EXAMINER |
| (561)805-6712 |