2012-03-28 11:01:582007 FBC W/2009 REVISIONS
  
 MECHANICAL REVISION DENIED
  
 1) THE ENGINEER THAT SIGNED AND SEALED THE REVISION,
 FERNANDO GOMEZ-PINA, IS NOT THE DESIGNER OF RECORD,
 HAROLD TUSSLER, THAT SIGNED AND SEALED THE ORIGINAL
 PLANS. SEE FS 471 AND FAC 61G15-27 FOR SUCCESSOR
 ENGINEER ADOPTING AS HIS OWN THE WORK OF ANOTHER
 ENGINEER.
  
 2) THE ORIGINAL PLANS INDICATE THAT THE ENTIRE HVAC
 SYSTEM WAS TO BE REPLACED, INCLUDING THE AIR HANDLER
 AND CONDENSING UNIT. THE REVISION INDICATES THAT ONLY
 THE DUCKWORK WAS REPLACED AND NO EQUIPMENT SCHEDULE IS
 PROVIDED ON THE REVISED PLANS. PLEASE CLARIFY. CITY
 AMENDMENTS 106.1.1
  
 3) THE 10" TRANSFER DUCT FROM THE MASTER SUITE IS
 UNDERSIZED. FBCR M1602.4 REQUIRES THAT ALL SUPPLY AIR
 INTO THE MASTER SUITE IS TO BE CONSIDERED WHEN SIZING
 THE TRANSFER DUCTS. THEREFORE, THE TRANSFER DUCT SHOULD
 BE 12". PLEASE CORRECT.
  
 ROBERT MCDOUGAL
 BLDG. PLAN REVIEW
 (561)805-6714