Date Text
2013-04-19 15:03:25FAILED
  
 REPEAT COMMENT: PLEASE PROVIDE WRITTEN RESPONSES TO THE
 COMMENTS BELOW:
  
 1) REPEAT COMMENT: OUTSTANDING ITEMS FROM RESOLUTION
 NO. 266-12 (WHICH WERE ALSO INCLUDED ON PREVIOUS
 ORDINANCE NO. 4318-11) APPROVED ON OCTOBER 29, 2012:
  
 A. PREPARE A CONSTRUCTION SITE SECURITY AND MANAGEMENT
 PLAN FOR APPROVAL BY THE CITY'S POLICE DEPARTMENT CRIME
 PREVENTION THROUGH ENVIRONMENTAL DESIGN (CPTED)
 OFFICIAL.
  
 I. THE APPLICANT, AFTER SITE CLEARING AND PLACEMENT OF
 CONSTRUCTION TRAILERS, SHALL INSTITUTE SECURITY
 MEASURES TO REDUCE OR ELIMINATE OPPORTUNITIES FOR
 THEFT. THE MANAGEMENT PLAN SHALL INCLUDE, BUT NOT BE
 LIMITED TO, TEMPORARY LIGHTING, SECURITY PERSONNEL,
 VEHICLE BARRIERS, CONSTRUCTION/VISITOR PASS,
 REDUCE/MINIMIZE ENTRY/EXIT POINTS, ENCOURAGE
 SUBCONTRACTORS TO SECURE MACHINERY AND TOOLS AT END OF
 WORK DAY, FENCING WITH SCREENING, AND/OR ANY OTHER
 MEASURE DEEMED APPROPRIATE TO PROVIDE A SAFE AND SECURE
 WORKING ENVIRONMENT.
  
 II. THE SECURITY MANAGEMENT PLAN SHALL BE MAINTAINED
 THROUGHOUT THE CONSTRUCTION PHASE OF THE PROJECT.
 NON-COMPLIANCE WITH THE APPROVED PLAN SHALL RESULT IN A
 STOP-WORK ORDER FOR THE ENTIRE PLANNED DEVELOPMENT.
  
 III. "NO TRESPASSING" SIGNS SHALL BE POSTED EVERY 500
 FEET AROUND THE PERIMETER OF THE CONSTRUCTION SITE.
  
 B. VERIFICATION THAT ALL OVERHEAD UTILITY LINES WITHIN
 THE SUBJECT PROPERTY SHALL BE BURIED AT THE TIME OF NEW
 CONSTRUCTION.
  
 2) REPEAT COMMENT: PROVIDE VERIFICATION FROM THE CITY'S
 ENGINEERING SERVICES & PUBLIC WORKS DEPARTMENT THAT THE
 FOLLOWING ADDITIONAL OUTSTANDING ITEMS FROM RESOLUTION
 NO. 266-12 HAVE BEEN MET:
  
 A. BUILDING PERMIT: PRIOR TO THE ISSUANCE OF A BUILDING
 PERMIT FOR ANY CONSTRUCTION RELATING TO THE DEVELOPMENT
 APPROVED AS PART OF THE HULETT ENVIRONMENTAL SERVICES
 CPD, THE APPLICANT SHALL PROVIDE VERIFICATION THAT THE
 FOLLOWING ITEMS HAVE BEEN SUBMITTED TO THE CITY'S
 ENGINEERING & PUBLIC WORKS DEPARTMENT:
  
 I. SIGNED AND SEALED DRAINAGE CALCULATIONS AND A COPY
 OF THE SOUTH FLORIDA WATER MANAGEMENT DISTRICT PERMIT.
  
 II. VERIFICATION OF THE PALM BEACH COUNTY WATER AND
 SANITARY SEWER APPROVALS.
  
 III. THE STORMWATER SYSTEM DESIGN.
  
 IV. A TRAFFIC PLAN DESIGN, INCLUDING ALL DRIVEWAY
 CONNECTIONS WEKIVA WAY FOR ALL ADJACENT BUSINESSES.
  
 V. FINAL ENGINEERING PLANS CONTAINING SECTIONS FOR THE
 PROPOSED PARKING LOT AND PAVING AND DRAINAGE DETAILS.
  
 3) REPEAT COMMENT: THE SITE PLAN AND REGULATING PLAN
 ARE NOT THE APPROVED VERSIONS (APPROVED VERSIONS ARE
 DATED 7/20/12).
  
 4 ) REPEAT COMMENT: SHEET A1-1 NEEDS TO SHOW TWO (2)
 FEET FROM THE BACK OF THE WHEEL STOP TO THE END OF THE
 PARKING SPACE NOT 1.5 FEET.
  
 5) REPEAT COMMENT: PROVIDE A DRAWING THAT VERIFIES THAT
 THE ROOF TOP MECHANICAL EQUIPMENT IS SCREENED FOR VIEW
 BY THE PARAPET. THE MECHANICAL EQUIPMENT STAND IS OVER
 TWO (2) FEET TALL, EXCLUDING THE EQUIPMENT, AND NO
 INFORMATION IS PROVIDED ON THE PARAPET HEIGHT.
  
 6) THE FOLLOWING SEPARATE PERMITS ARE REQUIRED:
  
 A. LANDSCAPE (LANDSCAPE PLAN SUBMITTED WAS NOT THE
 APPROVED LSP) - REPEAT COMMENT.
 B, AWNING
 C. SIGNAGE
 D. SITE LIGHTING (THE PHOTOMETRIC CALCULATIONS SHALL BE
 EXTENDED TO THE PROPERTY LINE TO VERIFY THAT THE
 LIGHTING DOES NOT EXCEED ONE FOOT CANDLE AT THE
 PROPERTY LINE, WHICH IT DOES ALONG THE EASTERN BOUNDARY
 (REPEAT COMMENT).
 E. SITE CIVIL TO THE CITY'S ENGINEERING & PUBLIC WORKS
 DEPARTMENT PLEASE NOTE THAT THE PAVING, DRAINAGE AND
 GRADING PLAN INCLUDED WITH THIS SUBMITTAL IS NOT
 CORRECT. IT SHOWS ONE SPACE TOO MANY IN THE PARKING BAY
 ON THE NORTH SIDE OF THE ACCESS ROAD (REPEAT COMMENT).
 F. PARKING LOT STRIPING.
  
 CONTACT ERIC SCHNEIDER @ (561) 822-1446.
  
  