Date |
Text |
2012-07-23 17:07:42 | FAILED |
| |
| PLEASE PROVIDE RESPONSES IN WRITING: |
| |
| A) REPEAT COMMENT: THE FOLLOWING CONDITIONS OF THE SITE |
| PLAN APPROVAL FOR THIS BUILDING HAVE NOT BEEN |
| SATISFIED: |
| |
| 1) PRIOR TO THE SUBMITTAL FOR A BUILDING PERMIT, THE |
| APPLICANT SHALL PREPARE A CONSTRUCTION SITE SECURITY |
| AND MANAGEMENT PLAN FOR APPROVAL BY THE CITY'S POLICE |
| DEPARTMENT CRIME PREVENTION THROUGH ENVIRONMENTAL |
| DESIGN ("CPTED") OFFICIAL. |
| |
| A) THE APPLICANT, AFTER SITE CLEARING AND PLACEMENT OF |
| CONSTRUCTION TRAILERS, SHALL INSTITUTE SECURITY |
| MEASURES TO REDUCE OR ELIMINATE OPPORTUNITIES FOR |
| THEFT. THE MANAGEMENT PLAN SHALL INCLUDE, BUT NOT TO BE |
| LIMITED TO, TEMPORARY LIGHTING, SECURITY PERSONNEL, |
| VEHICLE BARRIERS, CONSTRUCTION/VISITOR PASS, |
| REDUCE/MINIMIZE ENTRY/EXIT POINTS, ENCOURAGE |
| SUB-CONTRACTORS TO SECURE MACHINERY AND TOOLS AT END OF |
| WORK DAY AND/OR ANY OTHER MEASURE DEEMED APPROPRIATE TO |
| PROVIDE A SAFE AND SECURE WORKING ENVIRONMENT. |
| |
| B) THE SECURITY MANAGEMENT PLAN SHALL BE MAINTAINED |
| THROUGHOUT THE CONSTRUCTION PHASE OF THE PROJECT. |
| NON-COMPLIANCE WITH THE APPROVED PLAN SHALL RESULT IN A |
| STOP-WORK ORDER FOR THE ENTIRE PLANNED DEVELOPMENT. |
| |
| B) REPEAT COMMENT: PRIOR TO ZONING APPROVAL OF THIS |
| PERMIT, A SEPARATE LANDSCAPE PERMIT AND SITE PERMIT, TO |
| INCLUDE THE PARKING STRIPING, SHALL BE SUBMITTED TO THE |
| BUILDING DIVISION. |
| |
| C) REPEAT COMMENT: THE CHANGES TO THE KARLAN BUILDING |
| FOR THE SERVICE CANOPIES (SHEET SC101) AND OTHER MINOR |
| SITE CHANGES REQUIRE THE APPROVAL OF A MINOR SITE PLAN |
| AMENDMENT FOR THE CHANGES TO THE LAYOUT OF THE SITE. A |
| REVISED LANDSCAPE PLAN, SHOWING THE RELOCATION OF THE |
| TREES WITHIN THE LIMITS OF WORK IS ALSO REQUIRED AS |
| PART OF THE MINOR AMENDMENT. UPDATE - A MINOR AMENDMET |
| HAS BEEN SUBMITTED BUT IT IS NOT SUFFICIENT. |
| |
| D) SHEET L102 DOES NOT SHOW THE LATEST SITE DATA TABLES |
| (SPECIFICALLY THE BUILDING DATA TABLE). IT APPEARS THAT |
| IT IS BASED ON AN OLDER PLAN. |
| |
| E) THE PARKING DETAILS ON SHEET L 104 DO NOT MATCH THE |
| PARKING SPACES SHOWN ON THE CIVIL DRAWINGS (BOTH |
| DETAILS AND PLANS). |
| |
| F) REPEAT COMMENT SHOW THE ROOFTOP MECHANICAL EQUIPMENT |
| ON THE ELEVATIONS TO SHOW HOW IT WILL BE SCREENED. THE |
| A/C UNITS ON TOP OF THE CURBS APPEAR TO BE 5 FEET HIGH, |
| WITH A LOWER PARAPET. THIS DOES NOT APPLY TO THE |
| COOLING TOWERS, WHICH ARE SHOWN AS SCREENED. |
| |
| G) REPEAT COMMENT - THE APPROVED ELEVATIONS OF THE |
| GENERATOR BUILDING DID NOT INCLUDE GRILLS FOR THE VENTS |
| FACING MILITARY TRAIL. THE WALL AND LANDSCAPE DO NOT |
| PROVIDE ADEQUATE BUFFER FOR THE PROPOSED ELEVATION. |
| |
| H) THE NECESSARY DOCUMENTS SHALL BE SUPPLIED TO THE |
| PLANNING DIVISION TO SECURE AN APPROVED TREE ALTERATION |
| PERMIT. |
| |
| I) SEPARATE PERMITS ARE REQUIRED FOR LANDSCAPE, PARKING |
| STRIPING, FENCING, SITE/LANDSCAPE LIGHTING AND SIGNAGE. |
| |
| CONTACT ERIC SCHNEIDER @ (561) 822-1446. |