Plan Review Notes For Permit 11120506 |
Permit Number |
11120506 |
|
Review Stop |
E |
Sequence Number |
1 |
|
Notes |
Date |
Text |
2012-01-06 11:32:21 | 11120506 | | 771 N AUSTRALIAN AVE | | WPB PUMP STATION | | | | GROUND-FAULT PROTECTION OF EQUIPMENT (GFPE) IS REQUIRED | | FOR THE SERVICE. NEC 230.95 | | PROVIDE A LABELING SCHEDULE FOR THE WARNING AND SAFETY | | SIGNAGE REQUIRED FOR THE ELECTRICAL EQUIPMENT. NEC | | 110.22, 110.16, 701.9 | | INDICATE THE SIZE OF THE PORTABLE GENERATOR FEEDERS TO | | THE TRANSFER SWITCH. NEC 450.13 | | HOW IS THE LOAD ON THE PORTABLE GENERATOR TO BE | | MANAGED? NEC 702.5 | | THE SIZE OF THE MAIN BREAKER FOR PANEL BOARDS ?A? AND | | ?B? HAS NOT BEEN SPECIFIED. | | THE FAULT CURRENT CAPABILITY FOR THE THREE 100 AMP | | PANELS HAS NOT BEEN SPECIFIED. | | | | ROBERT LECKY | | COMMERCIAL COMBINATION PLANS EXAMINER | | [email protected] | | 561-805-6718 | | |
|