Plan Review Notes For Permit 11120073
Permit Number 11120073
Review Stop E
Sequence Number 4
Notes
Date Text
2013-06-24 13:33:4311120073
 700 N. CONGRESS
 NEW FIRE STATION
  
 PLEASE REVISE THE PLANS IN RESPONSE TO THE FOLLOWING
 REVIEW COMMENTS.
  
 SHEET E-0.01
 INDICATE THE CLASSIFICATIONS OF THE FACILITY UNDER THE
 2008 NATIONAL ELECTRIC CODE REQUIREMENTS FOR CRITICAL
 OPERATIONS POWER SYSTEMS (COPS). NEC ARTICLE 708
  
 SHEET E-0.03
 ELECTRICAL CIRCUITS AND LIGHTING POLES HAVE NOT BEEN
 SPECIFIED FOR THE SITE LIGHTING. PROVIDE SIGNED AND
 SEALED WIND LOADING CERTIFICATION FOR THE LIGHT POLE
 ASSEMBLY WITH FIXTURES. THIS MAY BE ACCOMPLISHED UNDER
 A SEPERATE PERMIT. 2010 FBC 1609.1., ASCE 7-10
  
 SHEET E-0.04
 VERIFY THE GENERATOR SERVICE DISCONNECT IS SERVICE
 RATED AND IS GROUNDED FAULT PROTECTED (GFP) OR HAS A
 GFP INDICATOR. SEE NEC 701.17
  
 THE SECONDARY OC PROTECTION ON T-L1 APPEARS TO EXCEED
 THE MAXIMUM ALLOWABLE RATING. NEC 450.3(B)
  
 SHEET E-1.01
 ELECTRICAL CIRCUITS SERVING THE LIVING AND SLEEPING
 AREAS REQUIRE AFCI PROTECTION. NEC 210.12, 210.18
  
 IDENTIFY THE MINIMUM WIRING METHOD PROPOSED IN ALL
 CLASS 1 DIVISION 2 AREAS. NEC 501.10(B), 501.15(B)
  
 SHEET E-4.01
 THE ELECTRICAL PLAN IS UNCLEAR AS TO THE CLASSIFICATION
 OF THE IT ROOMS UNDER THE ELECTRIC CODE. NEC 645.4
  
 THE PLANS ARE UNCLEAR AS TO HOW THE IT ROOMS ARE TO BE
 VENTILATED. NEC 645.4, 480.9
  
 PROVIDE A LABELING SCHEDULE FOR THE SAFETY SIGNAGE
 REQUIRED FOR THE ELECTRICAL EQUIPMENT AND ELECTRICAL
 ROOMS. NEC 110.22, 110.16, 701.9
  
 NOTE: SEPARATE PERMITS ARE REQUIRED FOR THE LIGHTNING
 PROTECTION SYSTEM, SITE LIGHTING, AUDIO, SECURITY, SITE
 TRAILERS, GATES, DATA AND PHONES.
  
  
 ROBERT LECKY
 ELECTRIC PLANS EXAMINER
 561-805-6718
  
  