Date |
Text |
2011-12-09 15:28:04 | FBC 2007 PLUMBING REVIEW #1 |
| CORRECTIONS: |
| |
| 1. ALL HOSE BIBBS WILL REQUIRE SHUT OFF VALVES. |
| PLUMBING 606.2 |
| |
| 2. SHEET P200 SHOWS 1 1/4" WATER PIPE AT THE RESTROOM |
| LOCATION BUT MUCH OF THE COLD WATER SIZING IS MISSING |
| TO THAT POINT AND THE MAIN RISER IS MISSING. |
| |
| 3. SHEET P300 THE GREASE TRAP DETAIL IS MISSING THE |
| INLET DROP TO 24" BELOW WATER LEVEL. PLUMBING 1003.5.3 |
| |
| ****NOTE**** |
| NO GAS REVIEW AT THIS TIME AS NO GAS CONTRACTOR SIGNED |
| ON. PLAN, APPLICATION, DRAWINGS, FEES REQUIRED. ALSO, |
| SEE BELOW FOR PLAN REVIEW REQUIREMENTS: |
| |
| GAS PERMIT APPLICATION REQUIREMENTS |
| EFFECTIVE IMMEDIATELY THE FOLLOWING INFORMATION SHALL |
| BE SHOWN ON ALL GAS DRAWINGS SUBMITTED FOR PERMITTING |
| IN THE CITY OF WEST PALM BEACH: |
| 1. SUBMIT AN ISOMETRIC DRAWING THAT CLEARLY SHOWS ALL |
| CUT SECTIONS OF PIPE AND CORRESPONDING LENGTHS PER |
| FBC-2007 FUEL GAS. |
| 2. SHOW TYPE OF PIPING MATERIAL BEING INSTALLED, ALL |
| PIPE SIZES, AND THE EDH NUMBER OF CORRUGATED STAINLESS |
| STEEL TUBING FOR EACH PIPE SIZE IF BEING USED. |
| 3. TYPE OF GAS, (LP OR NATURAL). |
| 4. BTU LOAD OF EACH APPLIANCE AND THE TOTAL BTU LOAD ON |
| THE SYSTEM. REFER TO THE FBC-2007 FUEL GAS SECS. 401.8 |
| THRU 402.6.1 AND TABLES 402.4(1) THRU 402.4(35) |
| 5. SHOW THE DISTANCE FROM THE POINT OF DELIVERY, |
| (METER), TO THE MOST REMOTE OUTLET IN THE BUILDING |
| AND/OR SYSTEM PER THE FBC-2007 FUEL GAS APPENDIX A ? |
| USE OF CAPACITY SECTION A.3.1(4) |
| 6. SUBMIT CALCULATIONS FOR COMBUSTION AIR PER THE |
| FBC-2007 FUEL GAS CODE SEC. 304 |
| 7. INDICATE THE DELIVERY PRESSURE (PSI) PER FBC-2007 |
| FUEL GAS SEC. 402.2. IF NATURAL GAS SPECIFY .5 PSI OR 2 |
| PSI. |
| 8. SUBMIT A DETAIL SHOWING THE TYPE, LOCATION, SIZE AND |
| TERMINATION OF THE GAS VENTS PER FBC-2007 FUEL GAS CODE |
| SEC. 502 THRU 505. |
| 9. SUBMIT MANUFACTURE SHEETS FOR ALL GAS EQUIPMENT TO |
| VERIFY COMPLIANCE WITH STANDARDS NFPA 54, NFPA 58, AND |
| FBC-2007 FUEL GAS SEC. 402.2 |
| 10. CLEARLY SHOW THE LOCATION AND CAPACITY OF LP |
| TANK(S), TYPE OF TANK (DOT OR ASME), THE DISTANCE OF |
| THE TANK FROM THE BUILDING AND ADJACENT PROPERTY LINES |
| THE DISTANCE OF THE TANK FROM ALL SOURCES OF IGNITION, |
| OTHER CONTAINERS, BUILDINGS, AND THE LOCATION OF ANY |
| BUILDING OPENINGS BELOW THE RELIEF VALVE OF THE TANK |
| PER NFPA 58, TABLE 3-2.2.2. |
| 11. CLEARLY INDICATE ON THE PLAN IF THE LP TANK IS |
| ABOVE OR BELOW GROUND, AND SHOW REQUIRED PROTECTION OF |
| THE TANK AND APPURTENANCES PER NFPA 58. IF THE TANK IS |
| BELOW GROUND THE CONTAINER SHALL BE SECURELY ANCHORED |
| PER NFPA 58 SECTION 3-2.2.7(H). |
| 12. EMERGENCY HOOD SHUT DOWN SHUT OFF VALVE TO BE BELOW |
| CEILING. MANUAL SHUT OFF VALVE TO BE UPSTREAM. UNION TO |
| BE DOWN STREAM OF MANUAL VALVE. |
| ANY QUESTIONS REGARDING THESE REQUIREMENTS MAY BE |
| REFERRED TO: |
| CHIEF PLUMBING INSPECTOR (561) 805-6692 |
| |
| REVIEW BY |
| LARRY WAGNER |
| CHIEF PLUMBING INSPECTOR |
| PHONE # 805-6692 |
| EMAIL [email protected] |
| FAX # 805-6676 |
| |