2011-11-21 15:57:211. PLEASE REVISE AIR BALANCE DIAGRAM TO SHOW COMPLIANCE
 WITH FBC 13.409.AB.2 (BUILDING PRESSURES) AND FBC
 13.409.AB.3.5 (EXHAUST HOODS). ALSO PLEASE NOTE THAT
 THE AIR BALANCE DIAGRAM SHOWS ONLY ONE BATHROOM EXHAUST
 (TWO REQUIRED AND TWO SHOWN ON FLOOR PLAN).
  
 2. A MECHANICAL CONTRACTOR IS REQUIRED FOR THE
 MECHANICAL PERMIT. THE CONTRACTOR HAS BEEN CHANGED FROM
 KNOLYS JOHNSON (CBC) TO "TBD."
  
 3. A SEPARATE PERMIT IS REQUIRED FOR THE HOOD.
  
 HAROLD MOSER, CHIEF MECHANICAL INSPECTOR