Plan Review Notes For Permit 11110011 |
Permit Number |
11110011 |
|
Review Stop |
M |
Sequence Number |
1 |
|
Notes |
Date |
Text |
2011-11-21 15:57:21 | 1. PLEASE REVISE AIR BALANCE DIAGRAM TO SHOW COMPLIANCE | | WITH FBC 13.409.AB.2 (BUILDING PRESSURES) AND FBC | | 13.409.AB.3.5 (EXHAUST HOODS). ALSO PLEASE NOTE THAT | | THE AIR BALANCE DIAGRAM SHOWS ONLY ONE BATHROOM EXHAUST | | (TWO REQUIRED AND TWO SHOWN ON FLOOR PLAN). | | | | 2. A MECHANICAL CONTRACTOR IS REQUIRED FOR THE | | MECHANICAL PERMIT. THE CONTRACTOR HAS BEEN CHANGED FROM | | KNOLYS JOHNSON (CBC) TO "TBD." | | | | 3. A SEPARATE PERMIT IS REQUIRED FOR THE HOOD. | | | | HAROLD MOSER, CHIEF MECHANICAL INSPECTOR | | 561-805-6732 |
|