Plan Review Notes
Plan Review Notes For Permit 11090046
Permit Number 11090046
Review Stop ENG
Sequence Number 3
Notes
Date Text
2012-10-25 14:57:12PLEASE INCORPORATE PLANNING'S COMMENTS SO THAT WE MAY
 REVIEW CHANGES.
  
 #1 DRAINAGE: PROVIDE PERVIOUS AND IMPERVIOUS AREA
 CALCULATION FOR SITE.
  
 (STORMWATER RUNOFF FOR DEVELOPMENT WITHIN DEVELOPED
 AREA MUST MEET THE FOLLOWING LEVEL OF SERVICE
 STANDARDS: (A) WATER QUANTITY: POST-DEVELOPMENT RUN-OFF
 SHALL NOT EXCEED PRE-DEVELOPMENT RUNOFF RATES FOR THE
 ENTIRE DEVELOPMENT. (B) WATER QUALITY: THE TREATMENT OF
 POST-DEVELOPMENT RUNOFF FROM THE SITE MUST ENSURE THAT
 RECEIVING WATER QUALITY CRITERIA ESTABLISHED IN CHAPTER
 17-302, SECTION 17-302.500, F.A.C. ARE MAINTAINED.)
 THE CITY OF WPB REQUIRES THAT APPLICANT ABIDE BY SOUTH
 FLORIDA WATER MANAGEMENT DRAINAGE CRITERIA AS FOLLOWS:
  
 #2 APPLICANTS TREAT FIRST INCH OF RUNOFF WATER OR 2 1/2
 TIMES THE IMPERVIOUS AREA (EXCLUDING BUILDING AREA),
 WHICHEVER IS GREATER.
  
 (THIS CRITERIA ALSO COMPLIES WITH PERFORMANCE STANDARDS
 ESTABLISHED IN CHAPTER 17-25, F.A.C., WITH TREATMENT OF
 THE FIRST INCH OF RUN-OFF ONSITE TO MEET WATER QUALITY
 STANDARDS REQUIRED BY CH. 17-302, SECTION 17-302.500,
 F.A.C. STORMWATER DISCHARGE FACILITIES MUST BE DESIGNED
 SO AS NOT TO DEGRADE THE RECEIVING WATER BODY BELOW THE
 MINIMUM CONDITIONS NECESSARY TO ASSURE THE SUITABILITY
 OF WATER FOR THE DESIGNATED USE AS ESTABLISHED IN
 CHAPTER 17-302, F.A.C.)
  
 [email protected]
 (561) 494-1085


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved