Date |
Text |
2011-08-17 14:44:38 | |
| A. SITE APPLICATION FOR STORMWATER RUNOFF |
| ANY SITE DEVELOPMENT PROJECT, PROPOSED ADJACENT TO THE |
| INTRA-COASTAL, WILL BE REQUIRED TO UTILIZE |
| APPROVED BEST MANAGEMENT PRACTICES (BMP?S) FOR THE |
| DETENTION AND TREATMENT OF STORMWATER RUNOFF. |
| IN ACCORDANCE WITH STATE AND LOCAL STORMWATER |
| MANAGEMENT POLICY, THE SITE DEVELOPER IS REQUIRED TO |
| PREPARE TWO (2) STORMWATER RELATED PLANS. |
| A1 THE STORMWATER POLLUTION PREVENTION PLAN IS REQUIRED |
| TO |
| ADDRESS STORMWATER RELATED ISSUES SUCH AS DUST CONTROL, |
| RUNOFF, AND EROSION CONTROL DURING THE |
| CONSTRUCTION PHASE OF THE PROJECT. |
| A2 A STORMWATER MANAGEMENT PLAN IS PREPARED FOR THE |
| FINAL SITE |
| CONFIGURATION AND ADDRESSES PERMANENT SITE STORMWATER |
| RUNOFF AND FLOOD PREVENTION. AS PART OF BOTH PLANS, |
| PROTECTION MEASURES WILL BE EMPLOYED TO PREVENT RUNOFF |
| TO THE INTRA-COASTAL OR THE ADJACENT PRIVATE OR CITY |
| STORMWATER |
| SYSTEM. |
| SITE STORMWATER MANAGEMENT SHALL INCLUDE WATER |
| QUALITY/QUANTITY PROVISIONS, SURFACE DRAINAGE DESIGN |
| AND RELATED CALCULATIONS AND SHALL CONFORM TO THE SFWMD |
| METHODOLOGY AS SHOWN ON VOLUME IV "PERMITTING |
| INFORMATION MANUAL," MOST CURRENT EDITION. |
| |
| B SHOW ALL SITE DRAINAGE ELEMENTS AND IT'S |
| CONFIGURATION. |
| |
| C PROVIDE CROSS ACCESS AGREEMENT TO EXISTING/PROPOSED |
| PARKING BACKING AND ACCESSING THRU PROPERTY ON THE |
| NORTH. |
| |
| MANUEL JULIAN GONZALEZ |
| CSD ENGINEERING REVIEW |
| 401 CLEMATIS STREET, |
| WEST PALM BEACH, FL 33401 |
| (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402) |
| MAIN PHONE: (561) 822-1200 |
| DIRECT: (561) 494-1085 |
| FAX: (561) 494-1116 |
| MOBILE: (561) 644-7301 |
| EMAIL: [email protected] |
| WWW.WPB.ORG/ENGINEERING |
| |
| |
| |