2012-05-30 13:58:47 | PLANS ARE APPROVED WITH PROVISOS (RESPOND TO ALL |
| COMMENTS IN WRITING IN ACKNOWLEDGEMENT) |
| |
| #1 RIGHT TURN ONLY EXIT CONCRETE APRON UNTO CONGRESS |
| AVE NEEDS TO BE REVISED AND NARROWED TO AVOID CARS |
| ENTERING SITE WHILE OTHERS ARE TRYING TO EXIT. |
| (CONGRESS AVENUE IS A PALM BEACH COUNTY ROADWAY |
| THEREFORE CONSULT WITH PBC ROAD ROW PERMIT WILL BE |
| REQUIRED) |
| |
| #2 PROVIDE DETAILS AND/OR DESIGN SUMMARY FOR PROPOSED |
| A.D.A. RAMP. (PLANS SUBMITTED DO NOT SHOW SLOPE, |
| SPECIFIC DIMENSIONS (LENGTH, WIDTH, ETC.) AND DETAILS |
| FOR A.D.A. HANDRAIL. (RAMP DETAILS MAY BE OBTAINED THRU |
| WWW.ADA.ORG WEB SITE UNDER U.S. DEPARTMENT OF JUSTICE - |
| ADA STANDARDS FOR ACCESSIBLE DESIGN. IF PERMIT FOR THIS |
| ELEMENT HAS BEEN ISSUED UNDER ARCHITECTURE PLANS OR |
| OTHER SOURCE PLEASE PROVIDE PERMIT NUMBER AND/OR |
| INFORMATION. |
| |
| #3 PLAN IDENTIFIES TWO DUMPSTER AREAS; HOWEVER THESE |
| AREAS ARE NOT LOCATED IN THE SAME VICINITY. PLEASE |
| SPECIFY WHICH DUMPSTER WILL BE THE PRIMARY DUMPSTER FOR |
| CITY OF WEST PALM BEACH SANITATION PICK-UP. |
| |
| #4 PLEASE VERIFY THAT THE 2" DOMESTIC METER (LOCATION: |
| CONGRESS SIDEWALK 10 NORTH OF SOUTH DRIVE) HAS THE |
| PROPER BACKFLOW PREVENTION DEVICE. INACTIVE 1" SERVICE |
| (LOCATION: SIDEWALK 4' WEST OF OKEECHOBEE DRIVEWAY) |
| COULD BE ACTIVATED AND DESIGNATED AS IRRIGATION. WITH |
| CURRENT CONFIGURATION DOMESTIC WATER USED FOR |
| IRRIGATION WILL BE CHARGED SEWAGE AGAINST IT. |
| |
| #5 ACCESS DRIVE EXITING TO 20FT WIDE ALLEY MUST BE AS |
| PER CITY OF WEST PALM BEACH STANDARD DRIVEWAY APRON. |
| 20FT WIDE IS THE MAX + 3' FOOT FLARE + 3' CURB |
| TRANSITION. APRON MUST BE 6" THICK CONCRETE AND 3000PSI |
| MINIMUM. REFER TO: |
| HTTP://WWW.WPB.ORG/ENGINEERING/PDF/STANDARDS/GC-6.PDF |
| |
| #6 IT IS HIGHLY SUGGESTIVE THAT CHAIN LINK FENCE |
| SURROUNDING REAR LOT, BE PLACED AROUND DRY DETENTION |
| AREAS. THIS WOULD ALLOW PROTECTION FOR PEDESTRIANS WHO |
| COULD INADVERTENTLY WALK INTO THE SITE AND FALL. |
| |
| PLEASE FEEL FREE TO DIRECT ANY SPECIFIC QUESTION SHOULD |
| YOU NEED CLARIFICATION ON ANY OF THE ABOVE MENTIONED |
| ITEMS. |
| |
| MANUEL JULIAN GONZALEZ |
| ENGINEERING PROJECT COORDINATOR |
| ENGINEERING SERVICES DEPARTMENT |
| 401 CLEMATIS STREET, 4TH FLOOR |
| WEST PALM BEACH, FL 33401 |
| (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402) |
| MAIN PHONE: (561) 822-1200 |
| DIRECT: (561) 494-1085 |
| FAX: (561) 494-1116 |
| MOBILE: (561) 644-7301 |
| EMAIL: [email protected] |
| WWW.WPB.ORG/ENGINEERING |
| |
| |