2011-06-30 16:30:40 | 2009 FBC W/2009 REVISIONS | | | | DENIED BY PLUMBING | | | | * DUE TO CODE CHANGES AFTER THE ORIGINAL PERMIT WAS | | ISSUED, THE USE OF AN ATMOSPHERIC VENT TO PREVENT | | ENTRAPMENT AT THE DRAINS IS NO LONGER ALLOWED. | | | | 1) SUBMIT TWO SETS OF TDH CALCULATIONS FOR THE SYSTEM. | | SUBMIT THE PUMP CURVE FOR THE PUMP SPECIFIED ON THE | | PLANS. WHEN TDH CALCULATIONS ARE NOT SUBMITTED THE | | MAXIMUM FLOW RATE IS USED TO DETERMINE THE WATER | | VELOCITY. AT 75 GPM WITH A 60' TDH THE WATER VELOCITY | | IN 2" PIPE IS 7.66 FEET PER SECOND AND EXCEEDS THE 6 | | FEET PER SECOND ALLOWED IN THE BRANCH SUCTION PIPING AT | | THE TWO MAIN DRAINS. SEE ANSI/APSP 7 4.4. PLEASE | | CORRECT. | | | | ROBERT MCDOUGAL | | BLDG. PLAN REVIEW | | (561)805-6714 | | [email protected] |
|