Date |
Text |
2011-11-03 10:23:11 | REVIEW #: 1ST |
| ACTION: DENIED |
| |
| FBC 2007 CODE FAMILY W/ 2009 SUPPLEMENTS |
| FBC CH.1 AS AMENDED BY THE CITY OF WEST PALM BEACH |
| |
| 1. PROVIDE ENGINEERED DETAIL FOR ATTACMENT OF NEW |
| ROOFTOP EQUIPMENT TO BUILDING STRUCTURE PER FBC-M |
| 301.12. |
| |
| 2. PAGE M-1 OUTSIDE AIR CALCULATION: TABLE INDICATES |
| CALCULATIONS ARE PER FBC-M 403.3 WHILE NOTE #2 |
| INDICATES ASHRAE 62.1 IS USED. WHICH IS CORRECT? ONE |
| METHOD OR THE OTHER SHALL BE LECTED AND ADHERED TO. |
| |
| 3. PAGE M-1 OUTSIDE AIR CALCULATION: IF ASHRAE 62.1 IS |
| ELECTED, THE VENTILATION TOTALS LISTED ARE TO ALSO |
| INCLUDE AN ADDITIONAL 0.18 CFM/SF OF FLOOR AREA IN THE |
| SPACES BEING VENTILATED FOR DAYCARE OCCUPANCIES. SEE |
| ASHRAE 62.1 TABLE 6-1 AND BREATHING ZONE OUTDOOR |
| AIRFLOW EQUATION 6-1 IN SECTION 6.2.2.1. |
| |
| 4. PLANS INDICATE HVAC SYSTEM DESIGN BY "K.O. ENERGY |
| DESIGN, LLC." THIS DOES NOT APPEAR TO BE A PROFESSIONAL |
| ENGINEER OR ENGINEERING BUSINESS. PLANS MUST BE |
| DESIGNED BY AN ENGINEER IN ACCORDANCE WITH FBC-B |
| 105.3.1.2. SYSTEM MAY NOT BE DESIGNED BY A CONTRACTOR |
| BECAUSE THE BUILDING OCCUPANT LOAD EXCEEDS 100 PERSONS. |
| WHILE PAGE M-1 IS SIGNED AND SEALED BY AN ENGINEER, THE |
| ENGINEER IS A "STRUCTURAL ENGINEER" AND NOT TAKING |
| RESPONSIBILITY FOR THE MECHANICAL DESIGN. |
| |
| IF YOU HAVE ANY QUESTIONS PLEASE CONTACT: |
| RONALD J. REGUEIRO |
| 561.805.6719 |
| [email protected] |