2011-03-18 11:45:56 | ***LANDSCAPE REVIEW FAILED*** |
| |
| PLEASE RESPOND TO REVIEW COMMENTS IN WRITTEN FORMAT. |
| |
| 1. PURSUANT TO SECTION 94-441(C)(2) OF THE ZONING AND |
| LAND DEVELOPMENT REGULATIONS (ZLDR): AS THE VALUE OF |
| THE PROPOSED WORK EXCEEDS 50% OF THE STRUCTURE'S VALUE |
| (LISTED AS "IMPROVEMENT VALUE" WITH THE P.B.C. PROPERTY |
| APPRAISER'S OFFICE), LANDSCAPING SHALL BE IN COMPLIANCE |
| WITH ALL APPLICABLE REGULATIONS FOUND IN ARTICLE XIV OF |
| THE ZLDR. |
| |
| 2. PLEASE SUBMIT TWO (2) COPIES OF A LANDSCAPE PLAN |
| SHOWING COMPLIANCE WITH SECTIONS 94-442 AND 94-445 OF |
| THE ZLDR. THE LANDSCAPE PLAN SHALL IDENTIFY ALL |
| EXISTING AND PROPOSED TREES, SHRUBS, AND GROUND COVER. |
| PLEASE PROVIDE THE QUANTITY, SIZE AND SPACING OF ALL |
| EXISTING AND PROPOSED LANDSCAPE MATERIAL. A CERTIFIED |
| COST ESTIMATE THAT INCLUDES THE TOTAL COST OF ALL |
| LANDSCAPE MATERIALS AND LABOR SHALL BE SUBMITTED WITH |
| THE PLANS. |
| |
| 3. PLEASE PROVIDE THE TABULATION NECESSARY FOR THE |
| EVALUATION OF COMPLIANCE WITH ARTICLE XIV OF THE ZONING |
| AND LAND DEVELOPMENT REGULATIONS, INCLUDING THE |
| XERISCAPE DESIGN OPTIONS. THE TABULATION PROVIDED IS |
| INCORRECT. OPEN SPACE IS DETERMINED BY TAKING THE TOTAL |
| LOT AREA AND DEDUCTING ONLY THE FOOTPRINT OF THE |
| STRUCTURE OR STRUCTURES ON THE SITE. THE DIFFERENCE IS |
| CONSIDERED OPEN SPACE. THE REQUIRED TREES AND SHRUBS |
| REQUIRED IS BASED UPON THE OPEN SPACE. PLEASE CLARIFY |
| HOW CREDIT WAS TAKEN FOR THE VARIOUS ITEMS ENUMERATED |
| ON THE XERISCAPE DESIGN OPTIONS TABULATION PROVIDED. |
| |
| 4. PLEASE REFER TO MAIN PERMIT AND SEE THE "PROVISO" |
| PLACED THERE BY ZONING. PLEASE APPLY FOR AN IRRIGATION |
| PERMIT AND INCLUDE TWO SETS OF PLANS. EVEN IF YOU HAVE |
| AN EXISTING IRRIGATION SYSTEM, THERE WILL BE REQUIRED |
| MODIFICATIONS AND NEW COMPONENTS REQUIRED. |
| |
| IF YOU HAVE ANY QUESTIONS, PLEASE CONTACT ROBERT |
| KUSSNER @ (561) 822-1462L. |
| |