Date |
Text |
2011-03-24 08:06:18 | 2009 FBC W/2009 REVISIONS |
| |
| DENIED BY BUILDING |
| |
| 1) THE ENERGY FORM THAT WAS SUBMITTED (1100B-07) IS NOT |
| THE CORRECT ONE. PLEASE FILL OUT THE CURRENT FORM |
| (1100B-08) AND SUBMIT 2 COPIES. |
| |
| 2) THE PRODUCT APPROVAL THAT WAS SUBMITTED FOR THE |
| FIXED WINDOW IS ONLY TESTED FOR SMALL MISSILE IMPACT. |
| FBC R301.2.1.2 REQUIRES THE WINDOWS TO BE TESTED FOR |
| LARGE MISSILE IMPACT OR HAVE IMPACT PROTECTION DEVICES |
| INSTALLED. SUBMIT TWO COPIES OF PRODUCT APPROVALS FOR |
| THE FIXED WINDOWS TESTED FOR LARGE MISSILE IMPACT OR |
| THE IMPACT DEVICES THAT WILL BE USED. |
| |
| 3) THE PRODUCT APPROVAL THAT WAS SUBMITTED FOR THE PGT |
| SINGLE HUNG WINDOWS HAS THE WRONG NOA NUMBER. THE NOA |
| SPECIFIED FOR FL239-R14 IS 07-0322.06. PLEASE SUBMIT 2 |
| COPIES OF THE COMPLETE CORRECT NOA. |
| |
| 4) THE PRODUCT APPROVALS SUBMITTED FOR THE JELD-WEN |
| GLAZED OUTSWING DOORS DO NOT HAVE ADEQUATE DESIGN |
| PRESSURES. THE PLANS SPECIFY HIGHER PRESSURES. |
| |
| 5) THE WINDOW AND DOOR PRESSURES SPECIFIED ON SHEET A-1 |
| OF THE PLANS ARE INCORRECT. THE SMALL WINDOW LOCATED IN |
| WALL ZONE 5 SHOULD BE HIGHER THAN THE ONES IN ZONE 4 |
| AND FOR THE DOOR AND OTHER WINDOWS THE NEGATIVE |
| PRESSURE IS ALWAYS MORE THAN THE POSITIVE PRESSURE. |
| |
| 6) THE PRODUCT APPROVALS ARE REQUIRED TO BE "REVIEWED" |
| AND APPROVED IN WRITING BY THE DESIGNER OF RECORD. |
| |
| ROBERT MCDOUGAL |
| BLDG. PLAN REVIEW |
| (561)805-6714 |
| [email protected] |