2010-12-10 07:56:47 | SEPARATE SUBMITTAL IS REQUIRED TO: |
| ENGINEERING SERVICES DEPARTMENT |
| 401 CLEMATIS STREET, 4TH FLOOR |
| WEST PALM BEACH, FL 33401 |
| (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402) |
| MAIN PHONE: (561) 822-1200 |
| DIRECT: (561) 494-1098 |
| FAX: (561) 494-1116 |
| WWW.WPB.ORG/ENGINEERING |
| PLEASE GO TO THE LINK BELOW, |
| HTTP://WWW.CITYOFWPB.COM/ENGINEERING/ENG_FORMS.PHP |
| DEVELOPMENT PERMIT PACKAGE 2010 |
| WILL GIVE YOU INSTRUCTIONS AND DOCUMENTATION REQUIRED |
| FOR YOUR SUBMITTAL. |
| |
| SPECIFIC SITE COMMENTS: |
| #1 WATER SERVICE TO THE PROPERTY IS 3/4" DIAMETER |
| COPPER LINE. |
| PLANS CALL FOR A 2". NEW TAP MAY BE REQUIRED BASED ON |
| YOUR WATER DEMAND |
| CALCULATION. (PLEASE SUPPLY DOCUMENTATION WITH PEAK |
| WATER DEMAND). |
| PLEASE TAKE INTO ACCOUNT CAR WASH EQUIPMENT, PUMPS, |
| TANKS, ETC.) |
| |
| #2 BACKFLOWS ARE REQUIRED TO BE AS CLOSE TO THE SOURCE |
| METER AS POSSIBLE, |
| 18" MAX DISTANCE. |
| |
| #3 SEPERATE WATER SERVICE FOR IRRIGATION IS RECOMMENED |
| AS SEWAGE PROCESSING |
| WILL BE CHARGE BASED ON DOMESTIC WATER METER |
| CONSUPTION. |
| |
| #4 PROVIDE A "SURFACE WATER MANAGEMENT REPORT". |
| |
| #5 SOUTHERN BLVD IS AN FDOT ROAD, PERMIT FOR UTILITY |
| INSTALLTION MAY BE REQUIRED. |
| DRIVEWAY ENTRANCE MODIFICATIONS WILL ALSO REQUIRE |
| PERMITTING. |
| |
| #6 THE DRIVEWAY ON OLIVE AVE WILL REQUIRE TRUNCATED |
| DOMES (ADA) ON EITHER SIDE. |
| 2' WIDE X THE FULL WIDTH OF SIDEWALK. |
| |
| #7 ON SHEET C1, SHEET 1 OF 10 YOU CALL OUT SECTION AA, |
| SECTION BB, AND SECTION DD HOWEVER IT SEEMS TO BE |
| MISSING. |
| PLEASE MAKE REFERENCE THAT THEY APPEAR ON SHEET C8, |
| SHEET 8 OF 10. |
| |
| #8 PERVIOUS PAVER SYSTEM IS NOT AN APPROVED METHOD OF |
| DRAINAGE WITHIN THE CITY OF WPB. |
| SUPPLY ALTERNATE SYSTEM OF DRAINAGE. |
| |
| #9 A NEW CLEAN-OUT NEEDS TO BE INSTALLED AT CONNECTION |
| POINT AND AT EVERY 75'. |
| ANOTHER CLEAN-OUT JUST AFTER PIPE EXITS BUILDING. |
| PIPE COLOR CODED TO DESIGNATE SEWAGE. |
| |
| #10 PROVIDE ENVIRONMENTAL SUMMARY OF SITE PREVIOUS USE |
| AND IF ANY ENVIRONMENTAL REMEDIATION IS REQUIRED. |
| (FOR EXAMPLE EXISTING UNDERGROUND TANKS, WELL POINTS, |
| MONITORING WELLS, ETC.) |
| |
| #11 PROVIDE INFORMATION ON CARWASH SYTEM OR SUMMARY |
| DESCRIBING PUMPS, TANKS, CISTERNS, ALL INTERNAL |
| PROCESSES, ETC |
| |
| #12 IDENTIFY LOCATION OF "DRYWELL" ON THE CIVIL PLANS. |
| |
| #13 WHERE DO ROOF DRAINS DISCHARGE TO? |
| |
| #14 PROVIDE CITY STANDARD BACKFLOW DETAIL. STANDARD |
| SIDEWALK DETAILS, ETC |
| |
| #15 PLEASE INCLUDE PERVIOUS AND IMPERVIOUS TOTALS |
| (SF,AC) ON PAVING PLAN C1, SHEET 1 OF 10. |
| |
| PLEASE, RESPOND TO ALL COMMENTS IN WRITING. THANKS! |
| ******************************************************* |
| ********************************************** |
| MANUEL JULIAN GONZALEZ |
| CSD ENGINEERING |
| 401 CLEMATIS STREET, 1ST FLOOR |
| WEST PALM BEACH, FL 33401 |
| (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402) |
| MAIN PHONE: (561) 822-1200 |
| DIRECT: (561) 494-1085 |
| FAX: (561) 494-1116 |
| EMAIL: [email protected] |
| WWW.WPB.ORG/ENGINEERING |
| |
| |