2010-10-01 13:40:57 | FBC FUEL GAS 2007 REVIEW #1 |
| DENIED: |
| |
| IF FUEL GAS IS INCLUDED WITH PLAN: |
| 1. SUBMIT AN ISOMETRIC DRAWING THAT CLEARLY SHOWS ALL |
| CUT SECTIONS OF PIPE AND CORRESPONDING LENGTHS PER |
| FBC-2007 FUEL GAS. |
| 2. SHOW TYPE OF PIPING MATERIAL BEING INSTALLED, ALL |
| PIPE SIZES, AND THE EDH NUMBER OF CORRUGATED STAINLESS |
| STEEL TUBING FOR EACH PIPE SIZE IF BEING USED. |
| 3. TYPE OF GAS, (LP OR NATURAL). |
| 4. BTU LOAD OF EACH APPLIANCE AND THE TOTAL BTU LOAD ON |
| THE SYSTEM. REFER TO THE FBC-2007 FUEL GAS SECS. 401.8 |
| THRU 402.6.1 AND TABLES 402.4(1) THRU 402.4(35) |
| 5. SHOW THE DISTANCE FROM THE POINT OF DELIVERY, |
| (METER), TO THE MOST REMOTE OUTLET IN THE BUILDING |
| AND/OR SYSTEM PER THE FBC-2007 FUEL GAS APPENDIX A ??? |
| USE OF CAPACITY SECTION A.3.1(4) |
| 6. SUBMIT CALCULATIONS FOR COMBUSTION AIR PER THE |
| FBC-2007 FUEL GAS CODE SEC. 304 |
| 7. INDICATE THE DELIVERY PRESSURE (PSI) PER FBC-2007 |
| FUEL GAS SEC. 402.2. IF NATURAL GAS SPECIFY .5 PSI OR 2 |
| PSI. |
| 8. SUBMIT A DETAIL SHOWING THE TYPE, LOCATION, SIZE AND |
| TERMINATION OF THE GAS VENTS PER FBC-2007 FUEL GAS CODE |
| SEC. 502 THRU 505. |
| 9. SUBMIT MANUFACTURE SHEETS FOR ALL GAS EQUIPMENT TO |
| VERIFY COMPLIANCE WITH STANDARDS NFPA 54, NFPA 58, AND |
| FBC-2007 FUEL GAS SEC. 402.2 |
| 10. CLEARLY SHOW THE LOCATION AND CAPACITY OF LP |
| TANK(S), TYPE OF TANK (DOT OR ASME), THE DISTANCE OF |
| THE TANK FROM THE BUILDING AND ADJACENT PROPERTY LINES |
| THE DISTANCE OF THE TANK FROM ALL SOURCES OF IGNITION, |
| OTHER CONTAINERS, BUILDINGS, AND THE LOCATION OF ANY |
| BUILDING OPENINGS BELOW THE RELIEF VALVE OF THE TANK |
| PER NFPA 58, TABLE 3-2.2.2. |
| 11. CLEARLY INDICATE ON THE PLAN IF THE LP TANK IS |
| ABOVE OR BELOW GROUND, AND SHOW REQUIRED PROTECTION OF |
| THE TANK AND APPURTENANCES PER NFPA 58. IF THE TANK IS |
| BELOW GROUND THE CONTAINER SHALL BE SECURELY ANCHORED |
| PER NFPA 58 SECTION 3-2.2.7(H). |
| 12. EMERGENCY HOOD SHUT DOWN SHUT OFF VALVE TO BE BELOW |
| CEILING. MANUAL SHUT OFF VALVE TO BE UPSTREAM. UNION TO |
| BE DOWN STREAM OF MANUAL VALVE. |
| ANY QUESTIONS REGARDING THESE REQUIREMENTS MAY BE |
| REFERRED TO: |
| CHIEF PLUMBING INSPECTOR (561) 805-6692 |
| PLUMBING PLANS EXAMINER (561) 805-6721 |
| |
| |