Plan Review Notes For Permit 10080576 |
Permit Number |
10080576 |
|
Review Stop |
M |
Sequence Number |
1 |
|
Notes |
Date |
Text |
2010-09-10 14:10:04 | **PROVISO** | | | | 1. FLEXIBL DUCT DETAIL: HANGER SPACING IS MAXIMUM 5 | | FEET AND FIRST HANGER SHALL BE WITHIN 6 INCHES OF THE | | TAP PER FBC-M 603.5.6.6. | | | | 2. SIGNED AND SEALED STRUCTURAL ENGINEERING DETAIL IS | | REQUIRED FOR ATTACHMENT OF RTUS TO BUILDING STRUCTURE | | PER FBC-M 301.12. | | | | 3. MECHANICAL PERMIT MUST BE ISSUED TO ALTMAN BROTHERS | | AIR CONDITIONING ONLY SINCE THEY HAVE SUBMITTED THE | | DESIGN FOR THIS JOB. ONLY THE INSTALLING CONTRACTOR MAY | | DESIGN THE SYSTEM IN LIEU OF A MECHANICAL ENGINEER PER | | FBC-B 105.3.1.2. | | | | IF YOU HAVE ANY QUESTIONS PLEASE CONTACT: | | RONALD J. REGUEIRO | | 561.805.6719 | | [email protected] |
|