2010-08-24 17:11:20 | REVIEW #: 1ST |
| ACTION: IN PROGRESS |
| |
| FBC 2007 CODE FAMILY W/ 2009 SUPPLEMENTS |
| FBC CH.1 AS AMENDED BY THE CITY OF WEST PALM BEACH |
| |
| REVIEW COMMENTS: |
| |
| 1. PG M0.01: CODE COMPLIANCE NOTES INDICATE "MIAMI-DADE |
| COUNTY AMENDMENTS." SUCH AMENDMENTS ARE NOT APPLICABLE |
| WITHIN THIS JURISDICTION. SEE ABOVE FOR APPLICABLE |
| CODES. |
| |
| 2. PG M2.01: FLOOR PLAN AND KEY NOTE #2 CALL FOR A |
| 12X12 OUTDOOR LOUVER. NO PRODUCT APPROVAL FOR SUCH |
| LOUVER HAS BEEN PROVIDED. SUBMIT PRODUCT APPROVAL |
| APPROVED IN WRITING BY THE DESIGN PROFESSIONAL IN |
| ACCORDANCE WITH FBC-B 106.3.3 AND FAC RULE 9N-3 |
| (FORMERLY 9B-72). |
| |
| 3. PG M2.02: KEY NOTE #1 CALLS FOR FIRE DAMPER AT DUCT |
| PENETRATION OF SHAFT. DUCT PENETRATIONS OF SHAFT |
| ENCLOSURES SHALL BE PROTECTED WITH FIRE AND SMOKE |
| DAMPERS IN ACCORDANCE WITH FBC-M 607.5.5. |
| |
| 4. PG M2.02: KEY NOTE #12 CALLS FOR A FIRE DAMPER AT |
| THE TRANSFER OPENING OF THE FILE STORAGE ROOM. THIS |
| TRANSFER OPENING SHALL ALSO BE PROTECTED WITH A SMOKE |
| DAMPER IN ACCORDANCE WITH FBC-B 508.2.2.1 AND FBC-B |
| 710.7. |
| |
| 5. PG M2.02: SUPPLY REGISTER IN OFFICE 231 IS MISSING |
| CFM AND GRILL DESIGNATION. THIS INFORMATION IS REQUIRED |
| TO DETERMINE DUCT SIZE AND FACILITATE PROPER BALANCING |
| OF AIRFLOWS. PROVIDE MISSING INFORMATION IN ACCORDANCE |
| WITH FBC-M 603.1. |
| |
| 6. PG M2.03: KEY NOTE #6 CALLS FOR FIRE DAMPER AT NEW |
| DUCT PENETRATION OF SHAFT. DUCT PENETRATIONS OF SHAFT |
| ENCLOSURES SHALL BE PROTECTED WITH FIRE AND SMOKE |
| DAMPERS IN ACCORDANCE WITH FBC-M 607.5.5. |
| |
| 7. PG M2.03: FLOOR PLAN SHOWS TWO DUCTS FROM |
| UNIDENTIFIED RTU GOING THROUGH THE 3RD FLOOR ASSEMBLY |
| DOWN TO THE SECOND FLOOR. THESE PENETRATIONS SHALL BE |
| PROTECTED AT THE FLOOR ASSEMBLY IN ACCORDANCE WITH |
| FBC-M 607.6. |
| |
| 8. PG M2.03: FLOOR PLAN SHOWS TWO DUCTS FROM RTU-3-1 |
| GOING THROUGH THE 3RD FLOOR ASSEMBLY DOWN TO THE SECOND |
| FLOOR. THESE PENETRATIONS SHALL BE PROTECTED AT THE |
| FLOOR ASSEMBLY IN ACCORDANCE WITH FBC-M 607.6. |
| |
| 9. PG M2.03: KEY NOTE #8 CALLS FOR A FIRE DAMPER AT THE |
| TRANSFER OPENING OF STORAGE ROOM 344. THIS TRANSFER |
| OPENING SHALL ALSO BE PROTECTED WITH A SMOKE DAMPER IN |
| ACCORDANCE WITH FBC-B 508.2.2.1 AND FBC-B 710.7. |
| |
| 10. PG M2.03: KEY NOTE #7 CALLS FOR A FIRE DAMPER AT |
| THE TRANSFER OPENING OF FILE ROOM 312. THIS TRANSFER |
| OPENING SHALL ALSO BE PROTECTED WITH A SMOKE DAMPER IN |
| ACCORDANCE WITH FBC-B 508.2.2.1 AND FBC-B 710.7. |
| |
| 11. PG M2.03: KEY NOTE #8 CALLS FOR A FIRE DAMPER AT |
| THE TRANSFER OPENING OF STORAGE ROOM 355. THIS TRANSFER |
| OPENING SHALL ALSO BE PROTECTED WITH A SMOKE DAMPER IN |
| ACCORDANCE WITH FBC-B 508.2.2.1 AND FBC-B 710.7. |
| |
| 12. 2ND AND 3RD FLOORS: IF RATED FILE AND STORAGE ROOMS |
| ON 2ND AND 3RD FLOORS ARE CONSIDERED TO BE SEPARATE |
| FIRE AREAS (SEE DEFINITION OF FIRE AREA IN FBC-B |
| SECTION 702), THESE ROOMS MAY NOT SHARE A COMMON PLENUM |
| WITH THE ADJACENT SPACES IN ACCORDANCE WITH FBC-M 602.1 |
| |
| 13. PG M5.01: DETAIL #3 SHOWS 12 GA. WIRE HANGERS FOR |
| FLEXIBLE DUCT SUPPORT. FLEXIBLE DUCT SUPPORTS SHALL BE |
| MIN. 1.5 INCHES WIDE PER FBC-M 63.5.6.6. |
| |
| 14.PG M5.01: DETAIL #3 NOTE LIMITS FLEXIBLE DUCT LENGTH |
| TO 3 FEET. FLOOR PLANS SHOW FLEXIBLE DUCT EXCEEDING |
| THREE FEET IN LENGTH IN MULTIPLE LOCATIONS. COORDINATE |
| FLOOR PLANS AND DETAILS IN ACCORDANCE WITH FBC-B |
| 106.1.1 AND 106.4. |
| |
| 15. PG M5.02: DETAIL #3 SHOWS NEW CONDENSER STAND ON |
| ROOF WHILE PAGE M2.04 CALLS FOR THE EXISTING, SITE |
| FABRICATED STAND TO BE USED. PROVIDE ENGINEERING DETAIL |
| SHOWING HOW THE NEW CONDENSERS ARE TO BE ATTACHED TO |
| THE EXISTING STAND FOR WIND RESISTANCE IN ACCORDANCE |
| WITH FBC-M 301.12. |
| |
| 16. PG M5.03: DETAIL #6, IF GOOSENECK IS UTILIZED, THE |
| OPEN END SHALL BE PROTECTED WITH CORROSION-RESISTANT |
| SCREEN IN ACCORDANCE WITH FBC-M 401.5. |
| |
| 17. PG M5.03: DETAIL #1, SHOW LOCATION OF DUCT SMOKE |
| DETECTORS ON FLOOR PLAN PER FBC-M 606.2.1 AND FBC-B |
| 106.1.1. |
| |
| 18. PG M5.03: DETAIL #2, PROVIDE MAXIMUM HANGER SPACING |
| PER FBC-M 305.1. |
| |
| 19. PG M5.04: DETAIL #2, THIS DETAIL DOES NOT |
| CORRESPOND WITH STRUCTURAL DETAIL ON PAGE S3.00. PLEASE |
| COORDINATE PLANS TO SHOW COMPLIANCE WITH FBC-M 301.12. |
| |
| |
| IF YOU HAVE ANY QUESTIONS PLEASE CONTACT: |
| RONALD J. REGUEIRO |
| 561.805.6719 |
| [email protected] |