Date |
Text |
2011-05-06 16:53:07 | ****CORRECTIONS**** |
| SAMANTHA HILL, BUILDING PLANS EXAMINER |
| 561-805-6724 [email protected] |
| FBC FLORIDA BUILDING CODE 2007 |
| FBC R FLORIDA BUILDING CODE 2007 RESIDENTIAL |
| |
| 2ND REVIEW |
| |
| 1. OK. |
| |
| 2. OPENING 10, 139" SPAN, REQUIRES USE OF 12' ROW, 10" |
| SPACING DOES NOT COMPLY. CHECK ALL. |
| |
| 3. SUBSTRATE SPECIFIED ON INSTALLATION SCHEDULE IS |
| CONCRETE BLOCK, BUT CONNECTION TYPE A REQUIRES A |
| CONCRETE SUBSTRATE. PLEASE REVISE INSTALLATION SCHEDULE |
| |
| 2ND REVIEW, INSTALLATION SCHEDULE SUBSTRATE STATES: |
| "CONC BLOCK." DOES THIS MEAN THAT ALL OPENINGS HAVE A |
| CONCRETE BLOCK SUBSTRATE, OR THAT THIS IS CONCRETE AT |
| THE TOP, BLOCK ON THE BOTTOM? |
| |
| 4. THE REVISED INSTALLATION SCHEDULE HAS CHANGED EDGE |
| DISTANCE FROM 3" TO 2". ANCHOR SPACING, 10", NO LONGER |
| COMPLIES. PLEASE APPLY FACTOR .35 PER CHART ON SHEET |
| 14. |
| |
| ALSO PLEASE NOTE, I RECEIVED CLARIFICATION FROM WALTER |
| TILLET, PE. A 3" EDGE DISTANCE ALSO REQUIRES A .35 |
| FACTOR. ONLY 3 1/2" EDGE DISTANCE FOR TAPCONS CAN |
| UTILIZE THE SPACING IN THE CHARTS WITHOUT A .35 FACTOR. |
| |
| |
| 5. SEE ANCHOR CHART FOR CONNECTION TYPE D. SOMEONE |
| CIRCLED 10" ON THE PRODUCCT APPROVAL, BUT THAT IS THE |
| ROW FOR ALL POINTS SOLID SET. THE TAPCON ROW REQUIRES |
| 4" SPACING. PLEASE SEE THE LEGEND AT TOP LEFT CORNER OF |
| SHEET 13. |
| |
| 6. AS DISCUSSED, I PULLED TWO PLANS AT RANDOM TO |
| RE-REVIEW INSTALLATION SCHEDULES ON ISSUED PERMITS IN |
| ORDER TO DETERMINE WHY CONTRACTOR WAS ABLE TO OBTAIN |
| PERMITS IN THE PAST BUT IS HAVING DIFFICULTIES AT THIS |
| TIME. I FOUND THE FOLLOWING: |
| |
| 10050282 WAS SUBMITTED INCORRECTLY BY CONTRACTOR. I HAD |
| A DISCUSSION WITH THE CONTRACTOR, EXPLAINED ERRORS, AND |
| REDLINED. |
| |
| 08030066 WAS SUBMITTED WITHOUT AN INSTALLATION |
| SCHEDULE, BUT ALL INFORMATION WAS PROVIDED IN AN |
| ALTERNATE FORMAT. THE WOMAN WHO DID THE PAPERWORK AT |
| THAT TIME DEVELOPED A FORM WHICH SHE TITLED "DRILLING |
| REQUIREMENT" AFTER SHE AND I HAD NUMEROUS DISCUSSIONS |
| REGARDING THE INFORMATION REQUIRED FOR PERMITTING. |
| |
| PLEASE BE ADVISED THAT IN THE FUTURE PERMITS WITH |
| INCORRECT INFORMATION SUBMITTED MAY BE ISSUED WITH |
| PROVISO THAT CORRECTED (CODE COMPLIANT) PLANS BE |
| SUBMITTED AS A REVISION (WITH REVISION FEES). |
| |
| WHEN RESUBMITTING, PLEASE PAY PLAN REVIEW FEE. THIS |
| PROJECT WAS PULLED FROM REVIEW BECAUSE PLAN REVIEW FEES |
| WERE NOT PAID AT TIME OF SUBMITTAL AS REQUIRED. DUE TO |
| THE EXTENUATING CIRCUMSTANCES WITH THE PERMIT RUNNER, |
| REVIEW HAS BEEN PERFORMED (CONTRARY TO DEPARTMENT |
| POLICY) AS A COURTESY TO THE CONTRACTOR WHO APPEARS TO |
| BE A VICTIM. HOWEVER, PLEASE PAY PLAN REVIEW FEE WHEN |
| RESUBMITTING PLAN IN ORDER TO BE IN COMPLIANCE WITH |
| DEPARTMENT REQUIREMENTS. |
| |
| |