2010-08-02 12:47:40 | IF YOU HAVE ANY QUESTIONS PLEASE CALL: |
| REVIEWER: DEAN S. LAUDERMILK, PROJECT COORDINATOR |
| EMAIL: [email protected] |
| OFFICE: 561-494-1083 (ENGINEERING) |
| OFFICE: 561-805-6716 (CONSTRUCTION SERVICES) |
| REVIEW STATUS: PASSED WITH PROVISOS: |
| NO INFORMATION OTHER THAN A CIRCLED AREA ON A SURVEY IS |
| SUPPLIED. SO IT IS TO BE ASSUMED THAT THE FOLLOWING |
| CRITERIA WILL BE USED (IF NOT RESUBMIT THE PLAN AND |
| PERMIT APPLICATION). ALSO, NO WORK CAN TAKE PLACE UNTIL |
| ITEM #4 IS APPLIED FOR A IS IN YOUR HANDS: |
| 1) THE DRIVEWAY ON PRIVATE PROPERTY IS TO BE REPLACED |
| FROM THE BACK OF THE SIDEWALK TO THE HOME WITH: |
| 1A) THE EXISTING DIMENSIONS WILL BE USED |
| 1B) THE MATERIAL USED WILL BE CONCRETE |
| 1C) THE CONCRETE WILL BE 6" THICK |
| |
| 2) THE SIDEWALK WILL BE REPLACED: |
| 2A) THE EXISTING DIMENSIONS WILL BE USED |
| 2B) THE MATERIAL USED WILL BE CONCRETE |
| 2C) THE CONCRETE WILL BE 6" THICK |
| |
| 3) THE DRIVEWAY APPROACH BETWEEN THE SIDEWALK AND EDGE |
| OF THE PAVEMENT WILL BE REPLACED: |
| 3A) THE EXISTING DIMENSIONS WILL BE USED |
| 3B) THE MATERIAL USED WILL BE CONCRETE |
| 3C) THE CONCRETE WILL BE 6" THICK |
| |
| 4) THE WORK IN THE RIGHT-OF-WAY (ROW) WILL BE PERMITTED |
| THRU THE CITY ENGINEERING SERVICES DEPARTMENT. THE ROW |
| IS FROM THE BACK OF THE SIDEWALK TO THE EDGE OF THE |
| PAVEMENT |
| 4A) CONTACT WINDEL PALMER, PROJECT COORDINATOR, WHO IS |
| IN CHARGE OF ROW PERMITS AT HIS DIRECT DIAL NUMBER OF |
| 561-494-1086 OR FAX HIM AT 561-494-1116 |
| 4B) THE FORMS (ROW PERMIT APPLICATION) CAN BE |
| DOWNLOADED FROM OUR WEB SITE AT: |
| HTTP://WWW.WPB.ORG/ENGINEERING/ENG_FORMS.PHP |
| 4C) THE "ENGINEERING SERVICES FEE DIRECTORY" WILL LET |
| YOU KNOW THE COST OF THE PERMITS |
| 4D) THE "ROW CONSTRUCTION STANDARDS" WILL INFORM YOU OF |
| WHAT WILL BE EXPECTED OF YOUR CREWS |
| 4E) THE ROW PERMIT MUST BE POSTED ON SITE |