2010-06-08 10:53:30 | PLAN REVIEWER: DEAN LAUDERMILK, PROJECT COORDINATOR |
| PHONE: 494-1083 |
| FAX: 494-1116 |
| EMAIL: [email protected] |
| PLAN STATUS: FAILED |
| THE PLAN HAS BEEN TURNED DOWN FOR THE REASONS LISTED |
| BELOW. IT IS SUGGESTED THAT A MEETING WITH ENGINEERING |
| AND ZONING BE SET UP TO DISCUSS THE ISSUES PRIOR TO |
| RESUBMITTING THE PLANS FOR REVIEW. |
| |
| THE PLAN HAS BEEN TURNED DOWN BECAUSE IT DOES NOT HAVE |
| AN APPROVED STAMP FROM THE ENGINEERING SERVICES |
| DEPARTMENT ON IT, AND HAVE YET TO BE SUBMITTED FOR |
| REVIEW. PLEASE SUBMIT TWO SETS OF PLANS TO; |
| THE CITY OF WEST PALM BEACH, ENGINEERING SERVICES |
| DEPARTMENT, ATTENTION: BRIAN MOREE, ENGINEERING |
| SERVICES CONSTRUCTION SUPERVISOR. PRIOR TO SUBMITTAL OF |
| THE PLAN AND AFTER MEETING WITH ENGINEERING SERVICES |
| PERSONNEL, PLEASE REVIEW AND EXPLAIN OR MAKE THESE |
| CORRECTIONS TO THE PLAN. |
| 1. NO SURVEY WAS ATTACHED, PLEASE SUPPLY |
| 2. NO POLLUTION CONTROL PLAN WAS ATTACHED, PLEASE |
| SUPPLY |
| 3. THERE ARE TWO PROPERTIES SHOWN IN GIS (PROPERTY |
| APPRAISERS INFORMATION), SEE GIS SNAP-SHOT. THERE |
| SHOULD BE A UNITY OF TITLE FOR THE TWO PROPERTIES FOR |
| THE WORK BEING DONE ON BOTH PROPERTIES. |
| 4. THE AERIAL SHOWS A DUMPSTER ON THE EAST SIDE OF THE |
| PROPERTY, BUT NO DUMPSTER DETAIL IS SHOWN ON THE PLAN. |
| PLEASE SUPPLY DUMPSTER DETAILS AND SHOW LOCATION ON THE |
| PLAN OF THE DUMPSTER ENCLOSURE. |
| 5. THE EXISTING WATER METER BOX IN THE SIDEWALK WHICH |
| IS TO BE REMOVED, WILL REQUIRE THE SERVICE TO BE |
| REMOVED AT THE MAIN, BY THE CONTRACTOR. SEE COMMENT NO. |
| 14. |
| 6. NO STRIPPING DETAILS ARE SUPPLIED, PLEASE SUPPLY. |
| 7. NO ADA PARKING SPACES OR A ROUTE TO THE CITY |
| SIDEWALK ARE SUPPLIED, PLEASE SUPPLY. |
| 8. CURRIE CRESCENT APPARENTLY RAN NORTH OF ACACIA AT |
| ONE TIME. THERE ARE TWO DRIVEWAYS THAT EXIT INTO THESE |
| PROPERTIES FROM THE EAST. ARE THESE LEGAL EXIT POINTS |
| FOR THE PROPERTY TO THE EAST INTO THIS SITE? IF SO, |
| HAVE THEY BEEN CONTACTED AND ASKED ABOUT THE REROUTING |
| OF THE TRAFFIC, OUT TO OLIVE AND NOT CURRIE CRESCENT? |
| 9. THE NEW PARKING LOT IS BEING ADDRESSED, BUT THE |
| EXISTING IS NOT, WHY? |
| 10. THE STORM SEWER SHOULD HAVE A POSITIVE OUTFALL, |
| PLEASE SUPPLY THRU THE CATCH BASIN IN THE EXISTING |
| PARKING LOT TO THE SOUTH. THAT CATCH BASIN OUTFALLS TO |
| ACACIA. |
| 11. THERE WILL NEED TO BE AN ON-GRADE LEVEL SURFACE AT |
| LEAST 44" WIDE ACROSS THE BACK OF THE SIDEWALK FOR ADA |
| CROSSING OF THE DRIVEWAY ON OLIVE. |
| 12. IN SOME CASES THERE IS OVER A FOOT OF DIFFERENCE IN |
| THE ELEVATIONS OF THE PROPERTY TO THE NORTH. PLEASE |
| EXPLAIN HOW YOU ARE DOING THIS WITH OUT A RETENTION |
| WALL. |
| 13. THE SAME HOLDS TRUE FOR THE SOUTH SIDE, BUT THE |
| DIFFERENCE IS ONLY 0.5', HOW WILL THIS BE ADDRESSED? |
| 14.AN IRRIGATION SYSTEM IS REQUIRED WITH A RPZ BACKFLOW |
| PREVENTER, PLEASE SUPPLY A PLAN. IT IS SUGGESTED THAT |
| THE SERVICE ON OLIVE BE MOVED NORTH OUT OF THE WAY OF |
| THE DRIVEWAY AND BE USED FOR IRRIGATION. |
| 15. THE SIDEWALK REPLACEMENT OF THE EXISTING DRIVEWAY |
| (EAST OF THE EXISTING BUILDING) IS NOT REQUIRED TO GO |
| BACK AS A SIDEWALK, THIS IS PRIVATE PROPERTY, NOT A |
| CITY STREET ANY LONGER. |
| |