2010-04-07 15:27:28 | REVIEWER: |
| DEAN S. LAUDERMILK, PROJECT COORDINATOR, |
| DIRECT DIAL: (561) 494-1083 |
| FAX: (561) 494-1116 |
| EMAIL: [email protected] |
| |
| PASSED WITH PROVISOS: |
| THE LIGHT POLES WILL NEED TO HAVE BANNER POLES ON THEM. |
| THE LIGHT POLE COME WITH THE BANNER POLE WITH A |
| THREADED OPENING PRE-MADE IN THE POLE FOR THE BANNER |
| POLE TO SCREW INTO, THEN 3-4' BELOW THIS IS ANOTHER |
| MALE THREAD OPENING (3/4") FOR A LOOP TO BE INSTALLED |
| TO HOLD THE BOTTOM OF THE BANNER STEADY. THE POLES WILL |
| NEED TO BE RESUBMITTED WITH THE OPENINGS AND THE BANNER |
| POLES WITH THE LOOPS. THIS MAY ALSO AFFECT THE WIND |
| LOAD CALCULATIONS, CHECK WITH THE MANUFACTURER TO SEE |
| IF THE WIND LOAD CALCULATIONS WILL NEED TO BE CHANGED |
| AND RESUBMITTED. |
| |
| THE DETAILS ON E-05 SHOW THE PULL BOXES BETWEEN THE |
| POLES AND CURBS. THE PULL BOXES SHOULD BE ON ONE SIDE |
| OR THE OTHER (EAST OR WEST SIDE) SO PEDESTRIAN TRAFFIC |
| IS NOT BLOCKED, NOT AS SHOWN. |
| |
| SHEET E-04 HAS A TABLE STATING THAT THE POLES WILL BE |
| EITHER 3'-1", 6', 10' OR 9' FROM BACK OF CURB. I THINK |
| SOME OF THESE DISTANCES WILL BLOCK THE ADA COMPLIANCE |
| ON THE SIDEWALKS. BE SURE NOT TO SET A POLE WITHOUT THE |
| PROPER ADA CLEARANCE. |
| |
| SHEET E-05 SHOWS A 30" CONCRETE COLLAR AROUND THE POLE |
| BASE, WHILE THE WIND LOADS SHOW NO CONCRETE. WHICH IS |
| IT? |
| |
| THE PLAN CALLS TO TIE IN TO A POWER POLE ON THE SOUTH |
| SIDE OF THE ALLEY. THE ONLY POWER POLE IN THE ALLEY |
| WEST OF SPRUCE IS ON THE NORTH SIDE OF THE ALLEY, |
| BETWEEN 24TH AND 25TH. THE ADDITIONAL PROBLEM IS THAT |
| THIS IS AN AREA WHERE EVERYTHING IS TO BE REMOVED TO |
| BUILD A CONDO ON BOTH SIDES OF THE ALLEY AND RELOCATE |
| THE ALLEY. RELOCATE THE POWER CONNECTION TO THE EAST |
| SIDE OF SPRUCE OR AT A POINT NORTH OF 25TH STREET. |
| |