Plan Review Notes
Plan Review Notes For Permit 09120475
Permit Number 09120475
Review Stop M
Sequence Number 1
Notes
Date Text
2010-01-19 16:36:30REVIEW #: 1ST
 ACTION: DENIED
  
 FBC 2007 CODE FAMILY W/ 2009 SUPPLEMENTS
 FBC CH.1 AS AMENDED BY THE CITY OF WEST PALM BEACH
  
 1. PAGE M1 AND "MECHANIACL CODE NOTES" #5 CALLS FOR
 DUCT SMOKE DETECTORS TO BE INSTALLED ON THE RETURN
 DUCT. SMOKE DETECTORS SHALL BE INSTALLED IN THE SUPPLY
 AIR SYSTEM IN ACCORDANCE WITH FBC-M 606.2.1.
  
 2. PAGE M1 SHOWS EXHAUST DUCTS LOCATED IN THE RETURN
 AIR PLENUM SPACE. EXHAUST DUCTS UNDER POSITIVE PRESSURE
 SHALL NOT BE LOCATED IN A PLENUM IN ACCORDANCE WITH
 FBC-M 601.5.
  
 3. PAGE M1 SHOWS EF-3 TO NEW CURB AND ROOF CAP. ROOF
 CURB AND CAP SHALL BE DESIGNED AND INSTALLED FOR WIND
 RESISTANCE IN ACCORDANCE WITH FBC-M 301.12. PROVIDE
 STRUCTURAL INSTALLATION DETAIL FOR THE NEW ROOF CURB
 AND MANUFACTURER'S DATA WITH INSTALLATION INSTRUCTIONS
 SHOWING WIND RESISTANCE CAPABILITIES OF THE PROPOSED
 ROOF CAP.
  
 4. HVAC-1 CONDENSING UNIT IS PROPOSED FOR ROOF
 INSTALLATION. PROVIDE STRUCTURAL INSTALLATION DETAIL
 FOR WIND RESISTANT INSTALLATION OF CONDENSER IN
 ACCORDANCE WITH FBC-M 301.12. ALSO PROVIDE
 MANUFACTURER'S DATA SHOWING THE CONDENSER IS DESIGNED
 FOR WIND RESISTANCE. IF A PRE-ENGINEERED ROOF STAND IS
 USED, PROVIDE PRODUCT APPROVAL IN ACCORDANCE WITH FBC-B
 106.3.3 AND FAC RULE 9B-72.
  
 5. NEW CONDENSING UNIT ON THE ROOF SHALL COMPLY WITH
 THE REQUIREMENTS FOR GUARDS IF WITHIN 10 FEET OF THE
 ROOF EDGE IN ACCORDANCE WITH FBC-M 304.10. PERMANENT
 MEANS OF ACCESS MAY ALSO BE REQUIRED IN ACCORDANCE WITH
 FBC-M 306.5. PROVIDE ROOF PLAN SHOWING PROPOSED
 INSTALLATION LOCATION OF CONDENSING UNIT.
  
 6. PAGE M2 NOTE CALLS FOR HVAC-1 CONDENSATE TO
 DISCHARGE INTO HUB DRAIN. CONDENSATE SHALL NOT
 DISCHARGE INTO SANITARY SYSTEM PER CITY ORDINANCE.
 CONDENSATE SHALL BE DISCHARGED IN AN APPROVED LOCATION
 IN ACCORDANCE WITH FBC-M 307.2.1.
  
 7. PLANS SHOW EXHAUST DUCTS WITHIN THE RETURN AIR
 PLENUM SPACE. EXHAUST DUCTS UNDER POSITIVE PRESSURE
 SHALL NOT PASS THROUGH A PLENUM IN ACCORDANCE WITH
 FBC-M 601.5.
  
 8. PLANS SHALL BE PROPERLY SIGNED AND SEALED WITH
 ORIGINAL SIGNATURE IN ACCORDANCE WITH FS 481. FULL
 TITLE BLOCK INFORMATION AND CERTIFICATE OF
 AUTHORIZATION NUMBER ARE ALSO REQUIRED.
  
 IF YOU HAVE ANY QUESTIONS PLEASE CONTACT ME:
 RONALD J REGUEIRO
 561.805.6719
 [email protected]


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved