Date |
Text |
2010-01-19 16:36:30 | REVIEW #: 1ST |
| ACTION: DENIED |
| |
| FBC 2007 CODE FAMILY W/ 2009 SUPPLEMENTS |
| FBC CH.1 AS AMENDED BY THE CITY OF WEST PALM BEACH |
| |
| 1. PAGE M1 AND "MECHANIACL CODE NOTES" #5 CALLS FOR |
| DUCT SMOKE DETECTORS TO BE INSTALLED ON THE RETURN |
| DUCT. SMOKE DETECTORS SHALL BE INSTALLED IN THE SUPPLY |
| AIR SYSTEM IN ACCORDANCE WITH FBC-M 606.2.1. |
| |
| 2. PAGE M1 SHOWS EXHAUST DUCTS LOCATED IN THE RETURN |
| AIR PLENUM SPACE. EXHAUST DUCTS UNDER POSITIVE PRESSURE |
| SHALL NOT BE LOCATED IN A PLENUM IN ACCORDANCE WITH |
| FBC-M 601.5. |
| |
| 3. PAGE M1 SHOWS EF-3 TO NEW CURB AND ROOF CAP. ROOF |
| CURB AND CAP SHALL BE DESIGNED AND INSTALLED FOR WIND |
| RESISTANCE IN ACCORDANCE WITH FBC-M 301.12. PROVIDE |
| STRUCTURAL INSTALLATION DETAIL FOR THE NEW ROOF CURB |
| AND MANUFACTURER'S DATA WITH INSTALLATION INSTRUCTIONS |
| SHOWING WIND RESISTANCE CAPABILITIES OF THE PROPOSED |
| ROOF CAP. |
| |
| 4. HVAC-1 CONDENSING UNIT IS PROPOSED FOR ROOF |
| INSTALLATION. PROVIDE STRUCTURAL INSTALLATION DETAIL |
| FOR WIND RESISTANT INSTALLATION OF CONDENSER IN |
| ACCORDANCE WITH FBC-M 301.12. ALSO PROVIDE |
| MANUFACTURER'S DATA SHOWING THE CONDENSER IS DESIGNED |
| FOR WIND RESISTANCE. IF A PRE-ENGINEERED ROOF STAND IS |
| USED, PROVIDE PRODUCT APPROVAL IN ACCORDANCE WITH FBC-B |
| 106.3.3 AND FAC RULE 9B-72. |
| |
| 5. NEW CONDENSING UNIT ON THE ROOF SHALL COMPLY WITH |
| THE REQUIREMENTS FOR GUARDS IF WITHIN 10 FEET OF THE |
| ROOF EDGE IN ACCORDANCE WITH FBC-M 304.10. PERMANENT |
| MEANS OF ACCESS MAY ALSO BE REQUIRED IN ACCORDANCE WITH |
| FBC-M 306.5. PROVIDE ROOF PLAN SHOWING PROPOSED |
| INSTALLATION LOCATION OF CONDENSING UNIT. |
| |
| 6. PAGE M2 NOTE CALLS FOR HVAC-1 CONDENSATE TO |
| DISCHARGE INTO HUB DRAIN. CONDENSATE SHALL NOT |
| DISCHARGE INTO SANITARY SYSTEM PER CITY ORDINANCE. |
| CONDENSATE SHALL BE DISCHARGED IN AN APPROVED LOCATION |
| IN ACCORDANCE WITH FBC-M 307.2.1. |
| |
| 7. PLANS SHOW EXHAUST DUCTS WITHIN THE RETURN AIR |
| PLENUM SPACE. EXHAUST DUCTS UNDER POSITIVE PRESSURE |
| SHALL NOT PASS THROUGH A PLENUM IN ACCORDANCE WITH |
| FBC-M 601.5. |
| |
| 8. PLANS SHALL BE PROPERLY SIGNED AND SEALED WITH |
| ORIGINAL SIGNATURE IN ACCORDANCE WITH FS 481. FULL |
| TITLE BLOCK INFORMATION AND CERTIFICATE OF |
| AUTHORIZATION NUMBER ARE ALSO REQUIRED. |
| |
| IF YOU HAVE ANY QUESTIONS PLEASE CONTACT ME: |
| RONALD J REGUEIRO |
| 561.805.6719 |
| [email protected] |