2009-12-08 12:00:03 | 2007 FBC W/2009 REVISIONS |
| NEW SFR |
| |
| DENIED BY BUILDING |
| |
| 1) SUBMIT TWO COPIES OF PRODUCT APPROVALS THAT HAVE |
| BEEN REVIEWED AND APPROVED IN WRITING BY THE DESIGNER |
| OF RECORD FOR THE COMPONENTS AND CLADDING AS REQUIRED |
| BY DCA RULE 9B-72 AND CITY AMENDMENTS. |
| |
| 2) SUBMIT TWO COPIES OF ENERGY CALCULATIONS AS REQUIRED |
| BY FBC CHAPTER 13. |
| |
| 3) SUBMIT TWO COPIES OF A PROPERTY SURVEY. |
| |
| 4) SHOW ON THE SITE PLAN A-1 THAT THE SURFACE DRAINAGE |
| REQUIREMENTS OF FBC R401.3 WILL BE MET AND THAT THE |
| SURFACE WATER WILL BE DIRECTED TO APPROVED COLLECTIONS |
| POINTS AND NOT ONTO ADJACENT PROPERTIES. |
| |
| 5) PLEASE UPDATE THE REFERENCES ON A-1 TO ACI 530, ACI |
| 530.1, ACI 318 AND ACI 301 TO THE 2005 EDITIONS AS THE |
| STANDARDS SPECIFIED IN CHAPTER 43 OF THE 2007 FBC |
| RESIDENTIAL. |
| |
| 6) PLEASE UPDATE THE STAIR NOTES ON SHEET A-11 FROM |
| 2004 TO THE 2007 FBCR. REVISE NOTE #1 TO R311.5.3.1. |
| |
| 7) REVISE THE GUARDRAIL NOTE 1 ON A-11 FROM NOT LESS |
| THAN 42" TO NOT LESS THAN 34" WHEN MEASURED VERTICALLY |
| FROM THE TREAD NOSINGS PER FBC R312.1. |
| |
| 8) THE LIVE LOAD NOTES FOR THE GUARDRAILS AND HANDRAILS |
| IN THE CHART ON A-11 WERE NOT GIVEN. SEE TABLE R301.5 |
| |
| 9) ON A-10 THE DRAFT STOPPING NOTE CODE SECTION IS FROM |
| THE 2004 HVHZ. PLEASE REVISE TO THE 2007 FBC R602.1.2 |
| WHICH REQUIRES FIREBLOCKING AT THE TOP AND BOTTOM OF |
| STAIR RUNS. |
| |
| 10) SPECIFY THE LOCATIONS AND MATERIAL THAT WILL BE |
| USED FOR THE DRAFTSTOPPING AT THE FLOOR/CEILING |
| ASSEMBLY THAT WILL SEPARATE IT INTO AREAS LESS THAN |
| 1000 SQFT AS REQUIRED BY FBC R502.1.2. |
| |
| 11) SUBMIT THE SPECIFICATIONS AND LISTING FOR THE BBQ |
| AND HOOD LOCATED ON THE LANAI OR INDICATE THAT THEY |
| WILL BE APPLIED FOR UNDER A SEPARATE PERMIT. |
| |
| 12) SPECIFY CEILING MATERIAL THAT WILL BE INSTALLED IN |
| THE LANAI AND THE COVERED PORCH ABOVE IT. |
| |
| 13) SHOW COMPLIANCE WITH FBC R309.2 FOR GARAGE |
| SEPARATION. 5/8" TYPE X GYPSUM BOARD IS REQUIRED |
| BETWEEN GARAGES AND HABITABLE ROOMS ABOVE. |
| |
| 14) ON A-10 THE BUILDING CROSS SECTION SHOWS A CONCRETE |
| FLOOR AT THE COVERED PORCH ABOVE THE LANAI. SHEET S-2 |
| AND 1 ON SD3 SHOWS WOOD TRUSSES. PLEASE CLARIFY. |
| |
| 15) ON SHEET S-2 THE FRONT BALCONY IS NOT SHOWN ON THE |
| FLOOR PLAN. PROVIDE STRUCTURAL DETAILS AND DIMENSIONS |
| FOR THIS CONCRETE BALCONY. |
| |
| 16) ON SHEET S-3 REVISE THE ROOF SHEATHING FASTENING TO |
| 8D RING SHANK NAILS TO CORRESPOND WITH SHEET SD1 AND |
| FBC R803.2.3.1. |
| |
| 17) ON SHEET S-3 UPDATE THE WIND LOAD TABLE TO |
| REFERENCE ASCE 7-05 AS SPECIFIED IN FBC R CHAPTER 43. |
| |
| 18) PLEASE CORRECT DETAIL 10 ON SD2 WHICH HAS THE TITLE |
| ON TOP OF THE NOTES. |
| |
| 19) THE H-35 SINGLE HUNG WINDOWS SPECIFIED AT TWO OF |
| THE SECOND FLOOR BEDROOMS, DO NOT HAVE THE REQUIRED 5.7 |
| SQFT MINIMUM NET CLEAR OPENING REQUIRED BY FBC R310.1.1 |
| FOR EMERGENCY ESCAPE AND RESCUE OPENINGS. (WINDOWS R-1 |
| THRU R-4 AND S-1) |
| |
| 20) ON S-2 THE TRUSS IDS IN THE CONNECTOR SCHEDULE ARE |
| LISTED WITHOUT THE "0" BETWEEN THE NUMBERS THAT THE |
| FRAMING PLAN LISTS. FOR EXAMPLE THE FRAMING PLAN LISTS |
| S01 AND THE SCHEDULE HAS S1. IN ORDER TO AVOID |
| CONFUSION, PLEASE COORDINATE THE ID TAGS. |
| |
| 21) ON SHEETS S-1 THE FOUNDATION PLAN AND S-2 THE FLOOR |
| FRAMING PLAN THE COLUMN AT THE LANAI THAT SUPPORTS THE |
| BEAMS B111 AND B112 ARE NOT SPECIFIED. PLEASE PROVIDE |
| DETAILS FOR THIS COLUMN. |
| |
| 22) PLEASE SPECIFY THE DESIGN PRESSURES FOR THE |
| EXTERIOR DOORS AND WINDOWS IN THE SCHEDULE ON SHEET |
| A-11. FBC R301.2.1 |
| |
| 23) PLEASE PROVIDE A WRITTEN RESPONSE TO THE COMMENTS |
| INDICATING HOW THEY HAVE BEEN ADDRESSED. |
| |
| ROBERT MCDOUGAL |
| BLDG. PLAN REVIEW |
| (561)805-6714 |
| [email protected] |