2009-10-07 12:13:39 | ***ISSUED WITH PROVISO**** |
| ***REVISED INSTALLATION SCHEDULE REQUIRED PRIOR TO |
| FIRST INSPECTION*** |
| |
| |
| SAMANTHA HILL, BUILDING PLANS EXAMINER |
| 561-805-6724 [email protected] |
| FBC FLORIDA BUILDING CODE 2007 |
| FBC R FLORIDA BUILDING CODE 2007 RESIDENTIAL |
| |
| 1. THE INSTALLATION SCHEDULE SUBMITTED SHOWS A 3 1/2" |
| EDGE DISTANCE, WOOD SUBSTRATE, AND FOR A 60" OPENING, |
| 63" SPAN. PLEASE REVISE SPANS TO BE CONSISTENT WITH |
| OTHER INFORMATION. THE EXAMPLE PROVIDED IS OPENING #1, |
| BUT THIS COMMENT APPLIES TO MANY OPENINGS. |
| |
| 2. SHUTTER CONNECTION MOUNTING TYPE SHOULD INCLUDE THE |
| SPECIFIC MOUNTING DETAIL PROPOSED. IN THIS CASE, YOU |
| HAVE CIRCLED ALTERNATE 4 ON PAGE 8. THIS REQUIRES 6" |
| ANCHOR SPACING, BUT YOU'VE PROPOSED 12"/10". PLEASE |
| REVISE THE INSTALLATION SCHEDULE TO INCLUDE WHICH |
| MOUNTING TYPE YOU PROPOSE TO USE ON EACH OPENING, AND |
| REVISE ANCHOR SPACING AS NEEDED. |
| |
| 3. PLEASE VERIFY SUBSTRATE. 3 1/2" EDGE DISTANCE |
| PROPOSED; SEE DETAILS ON PRODUCT APPROVAL. ANCHOR MUST |
| BE IN CENTER OF SILL; IT APPEARS THAT 3 1/2" EDGE |
| DISTANCE WILL NOT COMPLY WITH PRODUCT APPROVAL |
| REQUIREMENTS. ON THE PRODUCT APPROVAL, ANCHOR SPACING |
| FOR MASONRY IS HIGHLIGHTED ON PAGE 6. PLEASE CONFIRM |
| SUBSTRATE AND REVISE EDGE DISTANCE AND/OR SUBSTRATE AS |
| REQUIRED. |
| |
| 4. TAPCONS PROPOSED, BUT THE DETAIL HIGHLIGHTED |
| REQUIRES LAG SCREWS. PLEASE ADVISE WHERE THE PRODUCT |
| APPROVAL SPECIFIES USE OF TAP CONS INTO WOOD SUBSTRATE, |
| OR REVISE INSTALLATION SCHEDULE, OR PROVIDE ENGINEERING |
| FOR PROPOSED INSTALLATION. |
| |
| 5. THE DEFINITION OF EXPOSURE C HAS CHANGED. PLEASE SEE |
| NEW DEFINITION FBC R301.2.1.4. EITHER REVISE EXPOSURE |
| AND PRESSURES OR EXPLAIN RATIONALE (WITH AERIALS AND |
| WRITTEN EXPLANATION) JUSTIFYING EXPOSURE B. NOTE THAT A |
| LARGE PARK IS LOCATED WITHIN 1500' OF THIS JOB. |
| |
| THE INSTALLATION SCHEDULE IS AVAILABLE IN THE LOBBY OR |
| ON THE INTERNET AT HTTP://WWW.CITYOFWPB.COM/CONSTRUCTIO |
| N/PDF/SCHEDULE_FOR_INSTALLATION.PDF |
| |
| |